SAUDIARAMCO.

NOTES:

2 2' 4 6 8 10 12 14 16 17 19 21 21' 23 25 27 29 31 33 35 37 38 39 40 41 42 43 44 45 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


OTHERWISE SPECIFIED.
136387
2. ALL WORKS SHALL COMPLY WITH SAUDI ARAMCO
3437 2826 6400 6400 6400 6400 6375 6500 1861 4599 4379 425 6935 6965 6085 4315 8236 4715 5060 5725 1850 6075 2425 2687 3390 4423 7875 3625 CIVIL AND COMMUNICATION STANDARD.

3. CONDUITS SHALL HAVE PROTECTIVE BUSHING


PLACED AT ALL CONNECTION POINTS TO PREVENT

OF
CHEM DAMAGE TO CABLES.
SAMPLE STAIR-2
SAMPLE STORAGE

CONSENT
PREP. SLIDE PREP PREP PALYNOLOGY 4. EACH CONDUIT RUN MUST HAVE A PULL ROPE
H 121 122
KKA 119 120 INSTALLED WITH AT LEAST 300 MM SLACK AT BOTH
115 116
MA ENDS.
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE INCOMING
PLUMBING TR1 5. ALL OUTLET BOXES ARE TO BE FLUSH-MOUNTED TO
111A 111B 111C 111D 111E 111F 111G 111H 111J 111K
THE WALL AT A MINIMUM 150MM ABOVE TABLE TOP.
123 124

TTEN
6. ALL CONDUIT RUN SHALL NOT EXCEED 30M OF
A
STRAIGHT RUN OR TWO 90 DEGREE BENDS.
4562

WRI
OTHERWISE, PULL BOXES ARE REQUIRED. THE MAXIMUM
XRD DRINKING WATER METER
THIN CONDUIT RUN INCLUDING PULLBOX LENGTHS SHALL
114 FIRE RAW WATER METER NOT EXCEED 45M.

THE
SECTION & PLUMBING
B CAFE POLISHING
PROTECTION
EQUIPMENT
EQUIPMENT 7. THE RADIUS OF A CONDUIT BEND SHALL BE AT LEAST
4163

TEA SLIDE VACUUM PUMP CONTROL PANEL


NMR 117 EW/SS TEN (10) TIMES THE DIAMETER OF THE CONDUIT.
OFFICE 112 ELEV
PREP AIR CONPRESSOR CONTROL PANEL

THOUT
110 113
111L UP
118 8. CABLE TRAY SECTIONS AND EMT CONDUITS SHALL
C BE BONDED TOGETHER WITH #6 AWG INSULATED
2900

FILING ELEC J.C.


CORRIDOR GROUND WIRE AND GROUNDED TO THE TMGB/TGB

WI
CORRIDOR 109 137 138
102 104 REDUNDANT ROOM
WITH THE SAME TYPE OF WIRE.
UP
D

NG
LOBBY MALE LP-002 STORAGE 9. SACS CABLE TRAY SHALL BE SHARED WITH
UP STORE 136A MICP
TOILET

DRAWI
FEMALE
PREP COORDINATOR

LET
101 FIB & QEM PREP BMS SYSTEM.

CAL
107 136B RM
156
8500

130

TOI
135 131 ELECTRICAL

ANALYTI
ROOM
128
OPEN OFFICES e SEM MICRO CT TER
CONFERENCE CENTRAL
ELEV ELECTRICAL
36350

OPEN EQUIP
106 105 TR2 133 PREP MERCURY 127 126 125

S
COPY ABOVE POWER METER

THI
STAIR-1 RM RM
103 INJECTION
134 132 129 TRANSFORMER

E YARD
2400

FROM
CORRIDOR 139
GEOLOGIST CR
F WORKSPACE

DOR
BREAK AREA
143

NED
LEGEND

CORRI
7210

GEOLOGIST

DOR
DOR
DOR

OBTAI
WORKSPACE
CORE EXAM
CORE EXAM X

CORRI
DENOTES NOTE NUMBER

CORRI
142
CORRI

146
CORE EXAM 147 148 STRUCTURAL EQUIPMENT
GEOLOGIST
WORKSHOP CORE EXAM CORE EXAM CORE EXAM CORE EXAM ANALYSIS STORAGE XX DENOTES REVISION NUMBER
WORKSPACE
G

BE
141 157 SAMPLING
144 145 149 150 151 152 153 154 155
ROOM
5890

1" DIA. EMT CONDUIT ABOVE FALSE CEILING

PART,SHALL
GEOLOGIST 158
WORKSPACE CABLE TRAY, C-PROFILE, 90MM DEPTH DEFAULT

425
140 OF 305MM WIDTH PROVIDED UNDER SACS/CCTV
725

H H SYSTEM

CABLE TRAY, C-PROFILE, 90MM DEPTH


CORE STORAGE
J J' DEFAULT OF 150MM WIDTH UNLESS

6319
190
7000

MALE LOCKER
5000 OTHERWISE SPECIFIED PROVIDED UNDER
MALE
159

N
SACS/CCTV SYSTEM

1260
VESTIBULE

I
P
U
M

160
P

FULL,OR
INFORMATION OUTLET, DUPLEX (2-UTP CA.)
MALE K BMS WALL FLUSH MOUNTED (BMS SYSTEM)
L TOILET
161

7300
J.C.
7910

162

N
FORKLIFT

I
CHARGING FEMALE

ON
UP TOILET
M REFERENCE DRAWINGS

REPRODUCTI
CYLINDER 163

4625
STORAGE
N DWG. CONTROL FOR J.O.10-02118-0001 HD-041420
189 TO-BTU
BMS SYSTEM EQUIPMENT LAYOUT HA-041464.001
METER AT
SACS/CCTV SYSTEM LAYOUT HA-041695.001-004
7910

GENERAL 1ST FLR P


STORAGE WASTE MECH RM BLDG. MANAGEMENT SYS (BMS) SCHEMATIC DIAG. HA-041462.001
STAGING
164

6975
188 TO DDC-01

SAUDIARAMCO.NO
AHU-01/02
AT 1ST
R
FLR MECH
CHEMICAL
STORAGE RM
S
7000

3050
ELEC TR3 VACUUM KEY PLAN
187 SOLID/LIQUID DUST
165 166 WASTE COLLECTOR
T
FORKLIFT
BREAK
PARKING
U

6275
RM/PC
CUTTING CUTTING
CORE
186 SAMPLE
65507

PACKAGING STORAGE
PREP

OF
7145

167 183
INSTRUMENTATION 181
SHOP V

PROPERTY
1775
185
TO DDC-02 FD

W CHILLERS & CORE FD


X
PUMPS PHOTO/PROFILE
SCRATCH CUTTING

7450
AT 1ST 168 WASHING
7000

FLR MECH 184


FD 182

SOLE
RM
CORE CUTTING
HOT
TEAM LEAD
SHOT
OFFICE
Z EXAM
EW/SS Y

3550

THE
178
169
7300

ARE
A1
CUTTING
DATA
STAGING

5700
/SHARED
CT AREA

N
OFFICE

HEREI
175 180
179
B1 PLUGGING/ 0 5.0 10.0 15.0 20.0

SLABBING
C1 METERS
7000

170

4700
DATA/SHARED

NED
OFFICE SCALE: 1 : 200M

CONTAI
EW/SS 176
EW/SS CT D1 REVISION VALIDATION
E1 OPERATOR
WHOLE THIS REVISION NO. 00 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
CORE 174
CORE REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
RESTORATION
7242

ON
CUTTING
M

360 PHOTO/
U

8575
10-02118-0001-031
P

CORE GAMMA

NFORMATI
173 DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
171 172 (DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

OLF AAE
F1 03/11/18 03/11/18

REV.NO. DATE REVISION DESCRIPTION


SB SB SB SB SB SB SB CORE HANDLING

I
00 03/11/18 ISSUED FOR CONSTRUCTION
TEAM LEAD
H1

THE
OFFICE JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
5514 5730 5730 7640 5960 6900 4350 8250 4700 825 7150 5500 4300 4300 6850 5700 7100 7600 177 10-02118-0001 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
104099
DRAWING TYPE

BMS SYSTEM CABLEWAYS LAYOUT HVA

NG
1 3 5 7 9 11 13 15 18 20 20' 22 24 26 28 30 32 34 36 46
GROUND FLOOR

DRAWI
WELL CORE FACILITY
1 CABLEWAYS LAYOUT-GROUND FLOOR DHAHRAN SAUDI ARABIA
-

S
SCALE 1 :200M PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
SH

504 K HA-041463 001 00


Saudi Aramco 2615 ENG. (05/05)