St. Kitts and Nevis International Ship Registry: Flying The Flag of The Federation Worldwide
St. Kitts and Nevis International Ship Registry: Flying The Flag of The Federation Worldwide
St. Kitts and Nevis International Ship Registry: Flying The Flag of The Federation Worldwide
www.StKittsNevisRegistry.net
Contents Page
1) Introduction 2
2) Application 3-4
3) Guidance on definition of Shipowner 5
4) Exemptions & substantial equivalencies 6
5) Recognised Organisations & Inspectors 7
6) Inspection and Certification 8-12
7) On board Complaint Procedures 13
8) Financial Security 14
9) Seafarer Recruitment and Placement Services 15
10) Cooks, Food & Catering 16
11) Health Protection & Medical Care 17
12) Hours of Work and Hours of Rest 18
13) Yachts 19
14) Erratum 20
15) Documents available on website 21
1
1. Introduction
It is the purpose of the Maritime Labour Convention, 2006 to ensure that every seafarer has the right to:
SKN has promulgated regulations – the Merchant Shipping (Maritime Labour Convention, 2006)
Regulations 2013 - to give effect to MLC 2006
As MLC 2006 is a major new Convention, shipowners are recommended to make sure their Masters,
senior officers and responsible shore-based managers have attended training courses or received in-depth
training on the subject.
In accordance with ILO Resolution XVII, Administrations were requested to place their concentration
initially upon bulk carriers and passenger ships to have them all certified by 20 August 2013 and to allow a
‘year of grace’ for other types of ship as long as inspectors have no evidence that the ships do not conform
to the requirements of the Convention. However, SKN’s preference is that all ships to which MLC 2006
applies should be in possession of a DMLC Part 1 and MLC Certificate from 20th August 2013.
A copy of a Declaration of Maritime Labour Compliance – Part I, (DMLC Part 1), is available on the
website to assist shipowners and seafarers in preparing themselves for compliance and certification of
MLC 2006.
This Maritime Circular and associated documents is published to assist shipowners and other
organisations in complying with their obligations. They are not meant to be exhaustive and the MLC
Regulations take primacy at all times. It is hoped, however, that the contents of this Maritime Circular will
assist all concerned with their understanding and implementation of MLC 2006 and the approaches taken
by SKN towards its implementation.
If you have any doubt or questions about the application of a particular part of MLC 2006, please do not
hesitate to contact either the office of the Registrar, the Director of Maritime Affairs or the Labour
Commissioner, Department of Labour.
2
2. Application
Ships
2.1.1 A ‘ship’ and ‘small ship’ shall be as defined within the Merchant Shipping Act, namely:
“ship” means a ship other than one which navigates exclusively in inland waters or
within, or closely adjacent to, sheltered waters or areas where port regulations apply;
In the event of doubt as to whether the MLC Regulations apply to a ship or a particular
category of ships, the question will be determined by the Director in conjunction with the
Registrar, after consultation with the concerned shipowners’ and seafarers' organisations,
as necessary.
2.1.2 MLC 2006 applies to every ship that flies the flag of SKN, whether publicly or privately
owned, ordinarily engaged in commercial activity other than:
2.1.3 Commercial activity is considered to be any maritime activity undertaken for the purpose
of generating revenue.
2.1.4 The Director in conjunction with the Registrar will determine the waters of SKN which are
within or closely adjacent to sheltered waters or areas where port regulations apply and any
other similar waters elsewhere.
th
2.1.5 In the case of ships constructed before 20 August 2013, called in this Maritime Circular
‘existing ships’, the requirements relating to ship construction and equipment that are set
out in the Accommodation of Crews Convention (Revised) 1949 (No 92) and the
Accommodation of Crews (Supplementary Provisions) Convention 1970 (No 133) shall
continue to apply to the extent that those Conventions were applicable under St Kitts &
Nevis law and practice prior to 20th August 2013; (as recommended in the ILO “Guidelines
for Flag State Inspections under the MLC, 2006”). – i.e. that ships that were in existence
before the entry into force of the MLC, 2006 will be inspected in connection with seafarers’
accommodation and recreational facilities to verify that the ship provides and maintains
decent accommodation and recreational facilities for seafarers working or living on-board,
or both, consistent with promoting the seafarers’ health and well-being in accordance with
national legislation). As neither of the above two Conventions was implemented by St. Kitts
& Nevis, ‘existing ships’ are usually allowed to continue to operate, subject to compliance
with the ILO Guidelines. However, SKANReg should be contacted in the event that a ship
does not, for reasons associated with its construction and equipment, comply with either of
the above Conventions.
The Director in conjunction with the Registrar and after consultation with the concerned
organizations as necessary, ma y determine that all or any of the requirements o f MLC
2006 should not apply to ships of less than 200 gross tonnage (GT) not engaged on
international voyages.
2.3 Seafarers
a) Seafarer and seaman have the same meaning and cover both males and females.
3
b) A Seaman and Seafarer shall be as defined within the Merchant Shipping Act and the
MLC Regulations, namely:
In the Act;
“seaman” includes every person (except masters and pilots) employed or engaged
in any capacity on board any ship; and
c) Therefore for the purposes of MLC 2006, the Master of a ship is considered to be a
seafarer.
d) In addition, in accordance with Resolution VII adopted on 22nd February 2006 by the
th
94 (Maritime) Session of the International Labour Conference, held in
Geneva, “seafarer” means everyone working on-board including cadets,
shopkeepers, resident entertainers, hairdressers and similar persons.
2.3.2 Persons whose work is not part of the routine business of the ship and whose principal
place of business is ashore are NOT considered as seafarers. The following categories
of persons – which is not an exhaustive list - are therefore not considered as seafarers:
4
3. Guidance on definition of Shipowner & other management functions for a ship
3.1 MLC 2006 aims to ensure that seafarers only have to look to one entity as the shipowner.
3.2 “Owner” and “Shipowner” shall be as defined within the Merchant Shipping Act and the MLC
Regulations, namely:
In the Act;
“owner”, in relation to a ship, or “shipowner” means, in respect of a registered ship,
the registered owner and includes a bareboat charterer and a managing owner or
managing agent; and
3.3 A registered owner may assume the duties and responsibilities imposed on shipowners in
accordance with MLC 2006 OR contract with an organization to assume those duties and
responsibilities, whether or not they (the registered owner) also assign other functions of the
management of the ship e.g. technical or ISM, etc., to another organisation. In this way it can
be seen that the registered shipowner may have multiple organisations dealing with the
overall management of the ship, but still only one entity with the responsibility for MLC 2006.
3.4 SKANReg issue the DMLC Part I for the vessel on the basis of the shipowners details that
are to be stated in the Part II. The shipowner in this case should ALWAYS be the
organization that has agreed to take over the duties and responsibilities imposed on
shipowners in accordance with the Convention,
3.5 In the case where a registered owner has multiple organisations dealing with management
functions of the ship, these should be clearly defined within written agreements and
SKANReg may require to see English language copies of the contracts with all organisations
to satisfy themselves that one organisation has correctly assumed the duties and
responsibilities imposed on shipowners in accordance with MLC 2006.
5
4. Exemptions & Substantial Equivalencies and other deviations from the provisions of MLC 2006
4.1 The MLC 2006 allows very limited options for granting an exemption from its provisions.
4.2 Generally, these may only be agreed in consultation with the concerned organizations or
agreed through the Special Tripartite Committee at the ILO.
4.3 Therefore, SKN STRONGLY RECOMMENDS to shipowners to aim for full compliance where
possible without relying on exemptions since both processes mentioned in 3.2 ARE EXPECTED
TO BE LENGTHY ONES.
4.4 For ships of less than 200 GT, shipowners may seek to obtain an exemption from some of
the requirements for accommodation, (as provided for in paragraph 20 of Standard A3.1 of MLC),
where it is reasonable to do so, taking into account the size of the ship and the number of
persons on-board. Such requests for exemptions should contain clearly justifiable reasons with
a strong grounding and are subject to protecting the seafarers’ health and safety.
4.5 It is recognised by SKN that due to their trade, operational area, type or a combination of all or
parts of these factors, some existing ships may not be able to fully comply with some provisions
of MLC 2006. Examples of these may be:
Ships that only operate during daylight hours and those that may have no accommodation,
e.g. crew boats; day-trip tourist boats; ferries in special trades;
Ships that operate within an area close to shore and a port of refuge, but outside of what is
considered to be ‘sheltered waters’;
Manned non-propelled vessels, e.g. barges, which have cranes or other machinery;
SKN considers that these ships need to be certificated in accordance with MLC 2006 and
owners of these ships should approach their RO and/or SKANReg to discuss the options and
requirements for compliance and/or the granting of exemptions.
4.6 A shipowner who wishes to request an exemption must submit an application to SKANReg
in advance of the application for issue of the ships DMLC Part I. Application Form A16 (available
on website) must be used for this. Fees at the rate of USD 200 per hour or part thereof, may be
charged for assessing a request for an exemption. Requests for exemptions should contain
clearly justifiable reasons with a strong grounding and are subject to protecting the seafarers’
health and safety.
6
5. Recognised Organisations and Inspectors
5.1 SKN will, to the extent outlined at paragraph 4.2, delegate inspection a n d certification functions
under the MLC 2006 to the following Recognized Organizations (ROs) with whom SKN already has
agreements for the delegation of statutory services and other inspectors as may be determined from
time to time and whose details will be available on the website:
* Separate Written authorization from the office of the International Registrar required.
5.2 The inspection and certification functions to be carried out by ROs include the following:
· Approval of Plans and Drawings in respect of the Title 3 of MLC 2006;
· Approval of Declaration of Maritime Labour Compliance Part II;
· Initial inspection and issue of a Short Term Certificate;
· Interim inspection and issue of Interim Certificate;
· Issuing of Full-Term Certificate
· Intermediate inspection and endorsement of Certificate;
· Renewal inspection and issue of a Short Term Certificate;
· Withdrawal of a Certificate;
· Require the rectification of deficiencies found during the inspections;
· Inspections at the request of a Port State for the rectification of the deficiencies found
during a Port State Control (PSC) inspection; and
· Investigate complaints if specifically authorised by the SKN.
· Note: Responsibility for the resolution of a complaint remains with SKN.
5.3 SKN will allow an owner to engage an RO from the above list who has not issued the other statutory
certificates for a ship, to carry-out the surveys for MLC and issue the MLC Certificate, i.e. If RO *A*
has issued the statutory certificates, RO *B* may still survey the ship and issue the MLC Certificate.
5.4 At the present time, SKN may, on a case by case basis, authorise one of our fl ag state inspectors
who are qualified (i.e. possess the training and competence outlined in Standard 5.1.4) to discharge
any or all of the functions at 4.2 and to undertake related activities outlined in this Maritime Circular.
However, this will only be in exceptional circumstances.
7
6. Inspection and Certification
(b) 500 GT or over and operates from a port, or between ports, in a country other than SKN.
( c ) For the purpose of MLC, “international voyage” means a voyage from a country to a port
outside such a country.
( d ) Where applicable the GT of the ship will be taken as that stated in the ‘Remarks’ section of
the International Tonnage Certificate
6.1.2 It is not mandatory for a vessel of less than 500GT to have a ML Certificate on board.
This certificate can be issued on a voluntary basis if requested. However, SKN
STRONGLY RECOMMENDS that shipowners of vessels of less than 500GT voluntarily
apply for a ML Certificate in order to reduce possible p r o b l e m s w i t h PSC. Vessels
under 500GT are subject to PSC inspections and the RO should provide the relevant
inspection report on-board for submission to a PSC Officer, as necessary.
6.1.3 SKN STRONGLY RECOMMENDS to shipowners to apply for MLC 2006 certification as
th
soon as possible. Ships should be in possession of a MLC Certificate by 20 August
2014.
6.1.4 The scope of inspection for initial, interim or renewal of the ML Certificate will follow the
ILO ‘Guidelines for Flag State Inspections under MLC, 2006’ (available on website).
6.1.6 As with surveys for other statutory certificates, shipowners should contact their
Classification Society/Recognised Organisation for MLC 2006 inspections.
6.1.7 After conducting an MLC 2006 inspection of any SKN ship, the RO should provide an
Inspection Report to SKN, whether the ship is certificated or not.
6.1.8 In the case of a Port State Control inspection, a valid ML Certificate and DMLC shall be
accepted as prima facie evidence of compliance with the requirements of the Convention
including seafarers’ rights, unless the PSC Officer finds that:
· the required documents are not produced or maintained or are falsely maintained or
that the documents produced do not contain the information required by the
Convention or are otherwise invalid; or
· there are clear grounds for believing that the working and living conditions on the
ship do not conform to the requirements of the Convention; or
· there are reasonable grounds to believe that the ship has changed flag for the
purpose of avoiding compliance with the Convention; or
· there is a complaint alleging that specific working and living conditions on the ship
do not conform to the requirements of the Convention; then
a more detailed inspection may be carried out to ascertain the working and living conditions
on board the ship.
8
6.2 Procedure for Shipowners to obtain MLC 2006 Certification (Initial Inspection)
Note: For the purposes of the guidance in this section, shipowner has the meaning as defined within MLC
2006, i.e. it is the organisation that has agreed to take over the duties and responsibilities imposed on
shipowners in accordance with the Convention.
6.2.1 Shipowners should conduct a gap analysis of the ship and Company policy against the
SKN MLC Regulations (including the DMLC Part 1).
6.2.2 Any areas of concern raised from the gap analysis should be discussed with the
relevant RO.
6.2.3 Shipowners should have documented procedures to comply with the requirements of
MLC 2006. The Master should be familiar with the requirements of MLC 2006 and is
responsible for its implementation.
6.2.4 Shipowners should make a formal application to SKANReg on the Application Form A25,
which can be downloaded from the website, for a ship specific DMLC Part I. A FEE WILL
BE PAYABLE FOR THIS.
6.2.5 An additional fee may be required for the review of any requested exemption or
equivalency.
6.2.6 A ship’s specific DMLC Part I will be issued by SKANReg as an electronic (emailed) A4 size
PDF document. This will be e-mailed to the shipowner/Maritime Registrar as appropriate. A
hard copy will not be issued in normal circumstances. If a hard copy is required, an
additional fee will be levied. The DMLC Part I will include exemptions IF ANY and/or
equivalences authorised by SKN. (Please see Section 4 above - Exemptions).The
emailed document is to be printed on plain white paper for use onboard.
6.2.7 In order to prepare the vessel for an initial MLC 2006 inspection, the shipowner should
complete the DMLC Part II which is available on the website. Shipowners should be
guided by the sample in Appendix B5-1 to the MLC 2006 and may wish to seek guidance
from the RO.
6.2.8 DMLC Part II prepared by the shipowner should be submitted together with the ship's
specific DMLC Part I to the RO for review and acceptance of DMLC Part II.
6.2.9 Upon review of both DMLC Part I and DMLC Part II and acceptance of DMLC Part II, the
ships’ initial MLC 2006 inspection should be agreed with the RO.
6.2.10 Upon a satisfactory initial inspection, the RO will issue a Short Term ML Certificate
valid for up to five (5) months and approve the DMLC Part II. Originals of DMLC Part I
(issued by SKANReg) and the DMLC part II (completed by the shipowners and approved
by the RO) should be kept on board together with the Short Term ML Certificate (issued
by the RO).
6.2.11 The RO should forward a copy of the Short Term ML Certificate, DMLC Part II and
inspection report to SKANReg.
6.2.12 Shipowners should apply to the RO for the issue of a Full Term ML Certificate which
usually has a validity of 5-years subject to an intermediate inspection.
6.3.2 An Interim Maritime Labour Certificate may be issued by an RO for a period not
exceeding six (6) months. Interim certificates will not be extended or re- issued.
6.3.3 The shipowner should follow the procedures 6.2.1 to 6.2.6 inclusive above, then arrange
for an inspection of the vessel to be carried out by an RO. DMLC Part II is not required for
interim ML inspection/certification.
6.3.4 Upon a satisfactory inspection, the RO should issue an Interim ML Certificate valid for
a period not exceeding six (6) months. No further Interim ML Certificate can be issued.
6.3.5 The RO should forward a copy of the Interim ML Certificate and inspection
report/inspection log to SKANReg.
6.3.6 Shipowners should apply to the RO for the issue of a Full Term ML Certificate.
6.4.1 The validity of the ML Certificate is subject to an intermediate inspection. If only one
intermediate inspection is carried out and the period of validity of the certificate is five (5)
years, it should take place between the second and third anniversary dates of the
certificate. The scope and depth of the intermediate inspection should be equal to an
inspection for the renewal of the ML Certificate.
6.4.3 The ML Certificate should be endorsed by the RO, following a satisfactory intermediate
inspection.
6.4.4 The RO should forward a copy of the Endorsed ML Certificate and inspection report/ to
SKANReg.
6.4.5 The ML Certificate will cease to be valid if the intermediate inspection is not carried out
as required.
6.5.1 All national requirements (as per the initial inspection) implementing MLC 2006 need to be
verified during a ML Certificate’s renewal inspection.
6.5.2 The renewal inspection s h o u l d b e completed by the RO within the period three (3)
months before the expiry date of the existing ML Certificate. On satisfactory completion a
Short Term ML Certificate valid for five (5) months should be issued by the RO.
6.5.3 The RO will then process and issue a new full-term ML Certificate This certificate will be
valid for a period of five (5) years from the date of expiry of the existing ML Certificate.
6.5.4 When the renewal inspection is satisfactorily completed more than three (3) months
before the expiry date of the existing ML Certificate, the new ML Certificate will be valid
for a period not exceeding five (5) years, from the date of completion of the renewal
inspection.
6.5.5 If a ship’s certificate expires when the ship is not in a port, SKN may extend the period
of validity of the certificate. This extension will only be granted for the purpose of allowing
the ship to complete her voyage to the port in which she will be verified. No certificate
shall be extended for more than three (3) months for this purpose. Documented evidence
from SKN granting this request should be reviewed by the RO prior to endorsing the
extension. SKN may charge a fee for this extension.
6.5.6 When the renewal inspection is satisfactorily completed after the expiry date of the
existing certificate, the new certificate will be valid from the date of the completion of
10
the renewal inspection to a date not exceeding five years from the date of expiry of the
existing certificate.
NOTE TO RO’s; Where details of the MLC Certificates or an electronic version of the MLC Certificates
mentioned at 6.2.11, 6.3.6, 6.3.5 and 6.4.4 are available on the RO’s website, the requirement to send a
‘hard copy’ to SKANReg is not necessary.
a) the required inspections as stated in the MLC Regulations are not carried out;
b) the ML Certificate is not endorsed during the intermediate inspection;
c) a ship changes flag, i.e. is no longer a SKN ship;
d) the shipowner/manager is no longer responsible for the operation of the ship;
e) substantial modifications are made to the structure or equipment; or
f) amendments to national laws or regulations or other measures
implementing MLC 2006 are not taken into account.
The ML Certificate and the DMLC will be withdrawn by SKN or the RO if there is evidence of
serious or frequent deficiencies and the required corrective action has not been taken.
To support the timely re-certification when a ship changes change flag, (see 5.6.1.c above), SKN
undertakes to implement the guidelines in MLC 2006 concerning transmission of ML Certificate,
DMLC and relevant inspection reports, B5.1.3.6 of which provides:
When a ship changes flag … and where both States concerned have ratified this
Convention, the Member whose flag the ship was formerly entitled to fly should, as
soon as possible, transmit to the competent authority of the other Member copies of
the maritime labour certificate and the declaration of maritime labour compliance
carried by the ship before the change of flag and, if applicable, copies of the
relevant inspection reports if the competent authority so requests within three
months after the change of flag has taken place.
SKN’s point of contact for the purposes of this requirement is the office of the Registrar;
Email:mail@stkittsnevisregistry.net
Tel: +44 1708 380400
Fax + 44 1708 380408
Please refer to the separate Maritime Circular 54/13 on this subject, which follows the IACS Procedural
Requirement PR36 (March 2013). We acknowledge, with thanks, IACS’ agreement to use this.
11
6.9 Accommodations and Onboard Recreational Facilities
The requirements which relate to ship construction and equipment apply only to ships
th
constructed on or after the date when the Convention comes into force for SKN i.e. 20
August 2013. Accommodation and onboard recreational facilities of such new ships should
meet with the provisions stated in Paragraphs 6 to 17 of Standard 3.1 and Part B3.1 of MLC
2006. Variations may be allowed in the seafarers’ interests with different and distinctive
religious and social practices.
a) For ships constructed before 20th August 2013 - existing ships - the requirements relating to
ship construction and equipment that are set out in the ILO Conventions, Accommodation of
Crews Convention (Revised), 1949 (No. 92), and the Accommodation of Crews
(Supplementary Provisions) Convention, 1970 (No. 133), shall be applied to the extent that
they were applicable, prior to that date, (as recommended in the ILO “Guidelines for Flag
State Inspections under the MLC, 2006” – i.e. that ships that were in existence before the
entry into force of the MLC, 2006 will be inspected in connection with seafarers’
accommodation and recreational facilities to verify that the ship provides and maintains
decent accommodation and recreational facilities for seafarers working or living on-board,
or both, consistent with promoting the seafarers’ health and well-being in accordance with
national legislation). As neither of the above two Conventions was implemented by St. Kitts
& Nevis, ‘existing ships’ are usually allowed to continue to operate, subject to compliance
with the ILO Guidelines. However, SKANReg should be contacted in the event that a ship
does not, for reasons associated with its construction and equipment, comply with either of
the above Conventions.
b) A ship shall be deemed to have been constructed on the date when its keel is laid or when it
is at a similar stage of construction.
c) Existing ships should be inspected by ROs or Inspectors to ensure that the accommodation
and recreational facilities are clean and maintained in a condition which promotes
seafarers’ health and well-being.
e) Any alteration other than substantial alteration of accommodation and recreational facilities
of existing ships should be carried out in accordance with ILO Conventions C92 and C133.
12
7. On board Complaint Procedures
7.1 It is a mandatory requirement for shipowners to establish on board procedures for the handling of
seafarers' complaints alleging breaches of the requirements of MLC 2006, including seafarers'
rights, in accordance with the national requirements and the requirements of MLC 2006.
7.2 It is also mandatory for shipowners to ensure that each seafarer has:
7.3 The procedures should be designed to resolve complaints at the lowest possible level but should
not prevent a seafarer from making a complaint directly to the Master, to the shipowner, to SKN or
to the Competent Authority for MLC 2006 in the seafarer's country of residence, if necessary.
b) The complainant seafarer should submit his/her complaint in writing within seven (7) days
of the occurrence, or according to the circumstances, following the hierarchy below:
· Superior Officer
· Head of Department
· Master
c) Each of the indicated ranks has a further seven (7) days to solve the complaint.
d) If the Master is unable to resolve the complaint, the seafarer will have ten (10) days to bring it
through the Master to the shipowner, or if the complaint is to the prejudice of the Master, then
directly to the shipowner or his representative ashore.
e) The shipowner or his representative ashore and the seafarer concerned will have a period of
thirty (30) days to resolve the complaint.
f) If after thirty (30) days, the complaint has not been solved, then either party will have a further
thirty (30) days to bring the matter to SKANReg.
7.7 In accordance with the Regulation 5.1.5 of the MLC 2006 seafarers should be provided with a copy
of the on-board complaints procedures which include contact details of the competent authority. A
Model procedure approved by the Director is attached.
7.8 SKN’s point of contact for receipt and resolution of seafarer complaints (paragraph 7.2.c) is the office
of the Registrar;
13
8. Financial Security
8.1 Shipowners are required to arrange financial security, arising under the MLC 2006 as follows:
8.2 A P&I Club "Certificate of Entry” from a member of the International Group of P+I Clubs or another
P+I Club or insurer who has satisfied SKANReg that their insurance covers the financial security for
the shipowner's liabilities established in the MLC is accepted as proof of this. (See additionally
below 8.5)
8.3. For an initial ship specific DMLC, the P&I Club "Certificate of Entry” is to be submitted with the
Application for the DMLC or if not available then as soon as possible thereafter. In this case the RO
may be instructed by SKANReg not to issue the ML Certificate until the evidence of financial
security is provided to SKANReg.
8.4 If the shipowner is self-insured or using another form of financial security, the Registrar may require
additional documentation to satisfy these provisions. An Administration fee may be charged to the
shipowner or organisation supplying the financial security for review of such documents.
8.5 P+I Clubs and other organisations supplying insurance and P+I services to ship-owners should
refer to Maritime Circular 53/13 for our requirements if they wish to be placed on the list of accepted
organisations.
14
9. Seafarer Recruitment and Placement Services (Crewing Agents/Agencies) – ‘Services’
9.1 Shipowners should, as far as possible, only use Services that are in countries that have ratified MLC 2006.
9.1.1 A shipowner that uses Services in countries, in which MLC 2006 has not been ratified, must
ensure, as far as practicable, that those services conform to the requirements established by
MLC 2006 (Standard A1.4) and the MLC Regulations.
9.2 Seafarers are cautioned to exercise care if using Services in a country that has not ratified MLC 2006 or
signing-on a ship of a flag state that has not ratified MLC 2006, as their terms of employment, working &
living conditions onboard and health protection & social care may be of a far lower standard.
9.3 Services should pay particular attention to the requirements under which they should operate according to
MLC 2006 (Standard A1.4) and the MLC Regulations.
9.4 Any complaints about the service of Recruitment and Placement Services in St. Kitts & Nevis should in the
first instance be directed to the Director of Maritime Affairs at the address below and for those operating in
other countries to the office of the Registrar at the address shown above at 7.8.
15
10. Cooks, Food and Catering
10.1 Ships with a prescribed manning of 10 or more require a cook who is qualified according to MLC
2006, Regulation 3.2, Standard A3.2; i.e. 11 seafarers including the cook.
10.2 For a prescribed manning of less than 10, this requirement may be waived if there is a suitable
alternative arrangement.
10.3 Seafarers serving as cooks must have;
passed an examination prescribed by the Director (no examination has been prescribed at
the time of issue of this Maritime Circular) or;
passed an examination at an approved training school for cooks or hold a certificate of
qualification/competency as a ships cook issued by countries which have ratified the
Maritime Labour Convention, 2006, or the Certification of Ships’ Cooks Convention, 1946
(No. 69), or other approved body; and
have served at sea for a minimum period of 12 months of which 6 months must have been in
the capacity of second cook or cooks assistant.
10.4 Cooks serving onboard SKN ships are required to hold a certificate of equivalent proficiency
(Certificate of Endorsement) issued by SKANReg. This will be issued to cooks who have
completed the training as required by MLC. Cooks should apply to SKANReg or a Maritime
Registrar for this certificate using Application Form A15 available on the website.
10.5 Shipowners should pay attention to the ILO document MESC/2013/9 entitled “Guidelines on the
training of ships’ cooks”, which was adopted at the March 2014 Session of the ILO Governing
Council. This is available on the website.
10.6 The issue of water on ships is naturally of considerable interest. Reference should be made to
the documents, publication and guidelines contained therein, published by the World Health
Organization (WHO), who are continually updating their information and guidelines. Reference
should be made to their website www.who.int and at the time of publication of this Maritime
Circular the hyperlink is as follows;
http://www.who.int/water_sanitation_health/hygiene/ships/shipsanitation/en/
Ships should test water as recommended by the WHO Guidelines and keep full records of such
testing.
10.7 Further Guidance on food handling and preparation and associated matters will be published as
an amendment to this Maritime Circular and/or on the website in due course.
16
11. Health Protection & Medical Care
11.1 Shipowners shall adopt measures to provide for health protection and medical care including dental care
for seafarers.
11.2 Ships shall carry a medical chest which shall conform to the recommendations of the most recent edition of
the International Medical Guide for Ships issued by WHO.
11.4 Ships carrying more than 100 persons engaged on international voyages shall carry a doctor.
11.5 Ships not carrying a doctor shall have either at least one seafarer on board who is in charge of medical
care and administering medicine as part of their regular duties or at least one seafarer on board
competent to provide medical first-aid;
11.6 Attention is brought to Maritime Circular MC/12/09 concerning the services offered by the
International Radio Medical Centre (www.cirm.it) for 24-hour assistance in the event of a medical
emergency.
17
12. Hours of Work and Hours of Rest
12.1. The normal working hours standard for seafarers, like that for other workers, is based on an eight-
hour day with one day of rest per week and rest on public holidays
12.2. The minimum hours of rest shall be ten hours in any 24-hour period and 77 hours in any seven-day
period.
12.3 A table with the shipboard working arrangements shall be posted on-board and the table shall
contain for every position:
(a) the schedule of service at sea and in port; and
12.4 There shall be a record of seafarer’s daily hours of work and of their daily hours of rest in accordance
with the form approved by the Director.
12.5 The forms mentioned above are available on the website. In the event that a shipowner wishes to
use company generic forms that they already use in their ships, this is permissible after the forms
have been submitted to the Registrar for approval.
18
13 Yachts
13.1 MLC 2006 applies to every ship that flies the flag of SKN, whether publicly or privately
owned, ordinarily engaged in commercial activity.
13.2 Commercial yachts, regardless of tonnage, are considered ships for the purpose of applying
the requirements of MLC 2006.
13.3 Pleasure vessels (Private yachts), as defined within the Merchant Shipping Act, of any size,
not ordinarily engaged in commercial activities such as chartering, are not considered ships
under the MLC 2006. However, if the owner of a Pleasure Vessel wishes to charter-out the
yacht for commercial gain, then the provisions of MLC 2006 will apply.
19
14. Erratum
14.1 On page 36 of the Merchant Shipping (Maritime Labour Convention, 2006) Regulations
2013 the reference to sub-regulation 20(3) is incorrect and should read sub-regulation
19 (8). The correct reference should be as follows:
20
15. Documents available on website referring to MLC 2006
21