What are we talking about..
PCM 600. Introduction ON Line Help
The Navigator – PCM Frame Extra Features
Configuration Tool – ACT Signal Monitoring Tool
© ABB Group
Slide 3
1MRG000873, November 2009
Tools – PCM 600 installation CD
© ABB Group
Slide 4
1MRG000873, November 2009
PCM 600 – Update Manager
© ABB Group
Slide 6
1MRG000873, November 2009
Tools – PCM 600 in the SA environment
© ABB Group
Slide 7
1MRG000873, November 2009
Communication PC – IED – Front Connection
© ABB Group
Slide 8
1MRG000873, November 2009
Communication PC - IEDs - Ethernet (LAB)
© ABB Group
Slide 9
1MRG000873, November 2009
Communication PC - IEDs - ETHERNET
© ABB Group
Slide 10
1MRG000873, November 2009
Communication setting
© ABB Group
Slide 11
1MRG000873, November 2009
Configuration tool ACT
© ABB Group
Slide 12
1MRG000873, November 2009
PCM600-Functions list
After inserting the function blocks in ACT list of function
is associated to your IED in PCM600
Save
© ABB Group
Slide 13
1MRG000873, November 2009
Signal Matrix Tool (SMT)
© ABB Group
Slide 15
1MRG000873, November 2009
SMT: How it works in practice
© ABB Group
Slide 16
1MRG000873, November 2009
Signal Matrix Tool (SMT)
© ABB Group
Slide 17
1MRG000873, November 2009
The result of Input Configuration:
SMT
ACT
© ABB Group
Slide 19
1MRG000873, November 2009
SMT for Binary Outputs
© ABB Group
Slide 20
1MRG000873, November 2009
The role of SMT for Binary Outputs
© ABB Group
Slide 21
1MRG000873, November 2009
Analog Input Configuration
© ABB Group
Slide 22
1MRG000873, November 2009
Configuration of Analog Inputs in ACT
© ABB Group
Slide 23
1MRG000873, November 2009
HMI LED Configuration
© ABB Group
Slide 24
1MRG000873, November 2009
Settings
© ABB Group
Slide 25
1MRG000873, November 2009
Parameter Setting Tool
© ABB Group
Slide 26
1MRG000873, November 2009
Settings
© ABB Group
Slide 27
1MRG000873, November 2009
Settings
These 2 parameters
have been changed!
© ABB Group
Slide 28
1MRG000873, November 2009
download/upload
© ABB Group
Slide 29
1MRG000873, November 2009
PCM600 – Importing a project (decompression)
© ABB Group
Slide 30
1MRG000873, November 2009
PCM600 – Importing a project (decompression)
© ABB Group
Slide 31
1MRG000873, November 2009
PCM600 – Exporting a project (compression)
Project Structure
Settings
Configuration
Uploaded Disturbances
Communication Settings..
…… Everything!
© ABB Group
Slide 32
1MRG000873, November 2009
PCM600 – Exporting a project (compression)
© ABB Group
Slide 33
1MRG000873, November 2009
PCM600 – Exporting a project (compression)
© ABB Group
Slide 34
1MRG000873, November 2009
© ABB Group
Slide 35
1MRG000873, November 2009
Engineering Flow – Upload all
© ABB Group
Slide 36
1MRG000873, November 2009
PCM600 Engineering
© ABB Group
Slide 37
1MRG000873, November 2009
PCM600 Engineering
© ABB Group
Slide 38
1MRG000873, November 2009
PCM600 Engineering
© ABB Group
Slide 39
1MRG000873, November 2009
PCM600 Engineering
n Final structure
n To be consider about..
n No spaces allowed for
the item names in the
structure
© ABB Group
Slide 40
1MRG000873, November 2009
PCM600 Engineering
© ABB Group
Slide 41
1MRG000873, November 2009
Disturbance handling
© ABB Group
Slide 42
1MRG000873, November 2009
Disturbance Report Tool – The report
The Disturbance (Disturbance 1)
© ABB Group
Slide 43
1MRG000873, November 2009
Disturbance Report Tool – The report
The Disturbance (Disturbance 1)
Estimated fault voltage
(the time of calculation is
indicated here)
© ABB Group
Slide 44
1MRG000873, November 2009
Disturbance Report Tool – The report
The Disturbance (Disturbance 1)
Estimated fault voltages and
currents
(the time of calculation is
indicated here)
© ABB Group
Slide 45
1MRG000873, November 2009
Time Scheduler
© ABB Group
Slide 46
1MRG000873, November 2009
E-mailing
© ABB Group
Slide 47
1MRG000873, November 2009
Graphic Mimic Editor
© ABB Group
Slide 48
1MRG000873, November 2009
Graphical Display Editor (Mimic Editor)
© ABB Group
Slide 49
1MRG000873, November 2009
Graphical Display Editor (Mimic Editor)
© ABB Group
Slide 50
1MRG000873, November 2009
Signal Monitoring
© ABB Group
Slide 51
1MRG000873, November 2009
Start Online Monitoring
© ABB Group
Slide 52
1MRG000873, November 2009
Manual Refresh
© ABB Group
Slide 53
1MRG000873, November 2009
Event Viewer
Ø Internal Events
Ø Event List
© ABB Group
Slide 54
1MRG000873, November 2009
Event Viewer
© ABB Group
Slide 55
1MRG000873, November 2009
© ABB Group
Slide 56
1MRG000873, November 2009
Event Viewer
© ABB Group
Slide 57
1MRG000873, November 2009
PC ßà IED Communication Set-up
© ABB Group
Slide 58
1MRG000873, November 2009
IEC 61850 Communication
© ABB Group
Slide 59
1MRG000873, November 2009
Users Management and User Levels
© ABB Group
Slide 60
1MRG000873, November 2009
On Line Help