1.0 SCOPE AND PURPOSE .............................................................................. 1
2.0 REFERENCED DOCUMENTS ..................................................................... 1
3.0 PREPARATION OF TEST AREA ................................................................ 1
4.0 APPARATUS ............................................................................................... 2
5.0 PROCEDURE ............................................................................................... 2
6.0 REMEDIAL WORD AND RE-CHECKING ................................................... 3
7.0 TEST REPORT............................................................................................. 3
LIST OF FIGURES
FIGURE 1: STOREFRONT ................................................................................ 4
FIGURE 2: SLOPED GLAZING ......................................................................... 5
FIGURE 3: CURTAIN WALL ............................................................................. 6
FIGURE 4: WATER LEAKAGE FIELD CHECK ................................................ 7
All AAMA documents may be ordered at our web site in the “Publications Store”.
AAMA 501.2-09
PRECEDING VERSION: 501.2-03
ORIGINALLY PUBLISHED: 1994
EDITORIALLY REVISED: 11/09
NOTE 1: This field check method is not appropriate for testing of operable components such as operable windows and
doors. AAMA 502 is the proper test method for field air leakage resistance and water penetration resistance testing of newly
installed operable windows and doors and AAMA 511 is the proper test method for forensic water penetration testing of
fenestration products.
1.2 This field check procedure is intended to evaluate those joints, gaskets and sealant details in the glazing which are
designed to remain permanently closed and water tight.
1.3 The primary units of measure in this document are metric. The values stated in SI units are to be regarded as the standard.
The values given in parentheses are for reference only.
AAMA 502-08, Voluntary Specification for Field Testing of Newly Installed Fenestration Products
AAMA 503-08, Voluntary Specification for Field Testing of Newly Installed Storefronts, Curtain Walls and Sloped Glazing
Systems
AAMA 511-08, Voluntary Guideline for Forensic Water Penetration Testing of Fenestration Products
AAMA 204-98, Guidelines for AAMA Accreditation of Independent Laboratories Performing On-site Testing of
Fenestration Products
NOTE 2: Testing shall be performed as soon as possible after the fenestration product is installed, and prior to the
installation of drywall or other interior finish wall materials. If interior wall materials have been installed they shall be
removed at the test area to allow visual access to check for water penetration, or other means of visual access shall be
provided. If removal of interior finish work is required the sponsor of the test is responsible for the cost of removal and
repairs.
NOTE 3: This test method may be conducted at pressures lower than 205 kPa (30 psi) providing that the reason (i.e. not
practical at a multistory building location) for not achieving this pressure is 1) acceptable to the specifier, 2) the pressure is
not lower than 170 kPa (25 psi) and 3) the reason and the actual pressure are so noted in the test report as an exception to
the method.
5.0 PROCEDURE
5.1 The designated test area shall be divided into and evaluated in 1.5 m (5 ft) sections of the framing and joint. The nozzle
shall be held normal to the plane of the wall and at a distance of 305 mm (1 ft) ± 25 mm (1 in) from the location under test.
Each 1.5 m (5 ft) section of test area shall be evaluated for a period of five minutes by slowly moving the nozzle back and
forth over the test section (see Figure 4) while maintaining the nozzle perpendicular to the plane of the wall.
NOTE 4: It is recommended that a gauge be attached to the end of the nozzle to ensure that the specified distance from the
joint under test is maintained. The intent of the procedure is to indicate that each 1.5 m (5 ft.) component (horizontal and
vertical) is subjected to the water spray at a rate of 305 mm (1 ft.) per minute. Therefore, it requires 5 minutes to test each
1.5 m (5 ft.) length.
5.2 Working from the exterior, the wall test section shall be selectively wetted progressing from the lowest horizontal
framing member, then the adjacent framing intersections, then the adjacent vertical framing members, etc. During the test, an
observer on the indoor side of the wall, using a flashlight if necessary, shall check for any water leakage and shall note where
it occurs.
NOTE 5: For this water leakage field check, water leakage is defined as any uncontrolled water that appears on any
normally exposed interior surfaces, that is not contained or drained back to the exterior, or that can cause damage to
adjacent materials or finishes. Water contained within drained flashings, gutters, and sills is not considered water leakage.
The collection of up to 15 ml (1/2 oz) of water in a five minute test period on top of an interior stop or stool integral with the
system shall not be considered water leakage.
5.3 If no water leakage occurs during the five minute test, the next 1.5 m (5 ft) of framing shall be wetted for five minutes,
and testing continued in this manner until the entire test area is tested.
5.4 If water leakage occurs and the source of the leakage cannot be identified, the following sequence shall be followed:
5.4.1 After allowing the wall to dry completely and working downward from the top of the area to be checked, all joints,
gaskets and framing within this area shall be completely and tightly covered, on the outdoor side, with a water proof adhesive
masking tape. If necessary, use small amounts of sealant where the tape wraps around the framing corners and joints to
ensure that the masking is complete and waterproof.
5.4.2 Starting at the bottom of the prepared area, the masking tape shall be removed from the lowest horizontal framing for a
distance of not more than 1.5 m (5 ft) from one end of the frame, including the joint intersection or corner at the end. This
exposed length shall be subjected to the nozzle spray as directed in Section 4.1.
5.4.3 If no water leakage occurs during the five minute test period, this length of framing shall be considered satisfactory and
shall remain uncovered. If leakage has occurred at any point, the framing shall be re-taped at such points to prevent further
leakage of these points during the subsequent checking of joints and framing adjacent to or above them.
5.4.4 This process shall then be repeated on all framing, gaskets and joint intersections within the designated area, using
increments of exposed framing length not exceeding 1.5 m (5 ft) and always working upward on the wall.
SPECIFIER NOTE 7: AAMA accredited laboratories are required to comply with AAMA 204-98 "Guidelines for AAMA
Accreditation of Independent Laboratories Performing On-site Testing of Fenestration Products". The requirement of AAMA
accreditation assures the specifier that the laboratory has the staff, training, experience, and calibrated equipment to
properly perform field testing.
6.2 After all necessary remedial work has been completed and the required curing time, if any, has elapsed, all repaired
framing sections shall again be checked, following the same procedure as before (see Section 4.0). Should leakage still be
found, further remedial measures shall be taken and checking shall be repeated until all framing in the designated area is
found to be satisfactory.
7.2 The test report shall include the following information regarding the fenestration test specimen: Manufacturer, model,
dimensions, materials, etc.; identification and locations of fenestration product(s) on the building; physical condition of
fenestration product; description of any modifications made to the fenestration products.
7.3 The test report shall include a statement regarding sampling procedures.
7.4 The test report shall include all test results (and all retests) and a record of all points of water leakage.
7.5 The test report shall include a compliance statement indicating that the tests were conducted in accordance with this
method or completely describe any deviation. Also state whether or not the results indicate compliance with the field testing
specification requirements for the project.
V V
S S
Copyright by the American Architectural Manufacturers Association (AAMA). This document was purchased by Julian Kwok of Chan Ying Metal Works Limited on Fri Nov 17 2017. It may not
be reproduced, republished or distributed in any format without the express written consent of AAMA.
American Architectural Manufacturers Association
1827 Walden Office Square, Suite 550
Schaumburg, IL 60173
PHONE (847)303-5664 FAX (847)303-5774
EMAIL webmaster@aamanet.org
WEBSITE www.aamanet.org
Copyright by the American Architectural Manufacturers Association (AAMA). This document was purchased by Julian Kwok of Chan Ying Metal Works Limited on Fri Nov 17 2017. It may not
be reproduced, republished or distributed in any format without the express written consent of AAMA.