Sample TOR For CB
Sample TOR For CB
Sample TOR For CB
II. BACKGROUND
The DAP and agency conducted and completed all activities required to
include the establishment of the agency Quality Management System
(QMS) structure, development of skills and capabilities of key officers and
staff, documentation of procedures, and conduct of internal quality audit
among others.
1
III. OBJECTIVES
Specific Objectives:
1. Assessment report;
2. Certification audit plan;
3. Certification audit conducted;
4. Audit report detailing observations, opportunities for improvement
and any non-conformity to ISO 9001:2015 standards or on
documented procedures;
5. (As Applicable) ISO 9001:2008 certificate awarded to agency; and
6. Surveillance audits conducted on the 2nd and 3rd years of
certification.
V. TECHNICAL REQUIREMENTS
2
Note: Consulting refers to the provision of training on QMS documentation development, or assistance with
implementation of quality management systems to a specific organization. Trainings that are open to the
public, not organization specific, and held at a public forum is not considered as consulting.
4. The certifying body shall include in the proposal the audit activities
and a procedure for client appeals. If resolutions on good terms for
disputes between the agency and the certification body cannot be
made, the agency shall be afforded the right to lodge appeals about
the decisions of the audit team thru the accreditation body.
Independently from this, the legal path is open to both parties.
7. The certifying body audit team shall provide a full report on the
operations audited consistent with the content of the approved scope
of work/ deliverables to the agency at the end of each initial,
surveillance and re-certification audits unless otherwise agreed by the
agency.
9. The certifying body audit team shall abide with the auditing
principles, terminologies and guidelines as specified in the ISO
190011:2011 - Guidelines for quality and / or environmental
management systems auditing.
3
VI. SCOPE OF WORK
1. Scope of Audit
The scope of audit shall cover CHR process scope which involve the
following: operational processes
2. Address (SITES)
Head Office :
Branch Office :
Other Sites :
4
The total consultancy fee shall be (AMOUNT) (PhP-----,000).
Note: The total consultancy fee of the certifying body may be estimated using the
IAF MD # 1 and 5 as reference in determining the audit mandays multiplied by the
current market rate per audit manday of the certifying bodies.