Premix Aphaltic Road: # Description Qty Unit S.I Rate Amount at Par

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

Premix Aphaltic Road

Amount at
# Description Qty Unit S.I Rate par

Aggregate base course of any


thicness as specified laid and
compacted to 100% modofied
AASTO density by appropriate
1 compacting equipment and roller 40,011 cum 2-18 1,921.10 76,864,383

2 Prime coast on base course surface 262,498.98 Sqm 2-84 129.74 34,056,618

Providing and laying premix asphlatic


base course of any thickness as
specified with bitumen 60/70 or
80/100 using job mix formula
3 (except prime code) 10,758.88 Ton 2-82 8,248.54 88,745,052
4 Tack coat on bituminious surface 115,935.02 Sqm Feb-85 68.07 7,891,697

Providing and laying premix asphaltic


wearing course of any thickness as
specified with asphaltic bitumen
60/70 or 80/100 using job mix
5 formula (except tack coat) 18,742.03 Ton 2-83 8,768.92 164,347,362
371,905,111
ANCILLARY WORKS

Providing and laying precast PCC


kerbstone size 450x300x150mm
including setting, jointing and
6 pointing in cm 1:4 all as specified 61,262.22 Mtr 3-81 388.22 23,783,219

Providing and laying pre cast edge


stone inclusing setting, jointing and
pointing in cm 1:4 as per drawing
7 and specifications 17,173.04 Mtr 3-80 422.74 7,259,731
Provisions of drain (5' wide) as per
8 drawing and specification 15,608.28 Mtr Job/Rate 14,986.90 233,919,732
Provisions of drain (4' wide) as per
9 drawing and specification 17,173.04 Mtr Job/Rate 12,497.44 214,619,037
Provision of footpath as per drawing
10 and specification 17,173.40 Mtr M/Rate 3,696.16 63,475,634
Traffic road sign any category as per
11 drawing and specification 134.00 Each M/Rate 35,000.00 4,690,000
Road marking paint as per drawing
12 and specification 12,756.15 Mtr M/Rate 118.00 1,505,226
Provision of road stud/reflectors as
13 per drawing and specification 7,987.43 Each M/Rate 3,250.00 25,959,148

575,211,726
Amount with
20% 20%

2,305.32 92,237,259

155.69 40,867,941

9,898.25 106,494,062
81.68 9,470,036

10,522.70 197,216,834
446,286,133

465.86 28,539,863

507.29 8,711,677

17,984.28 280,703,678

14,996.93 257,542,844

4,435.39 76,170,761

42,000.00 5,628,000

141.60 1,806,271
3,900.00 31,150,977

690,254,071
BILL OF QUANTITIES
Provision of Premix Carpeting Roads for Pine City Housing Scheme at Haripur

Amount at
Sr No Description Qty Unit S.I Rate par

1 Clearing and Grubbing as all specified 28310.02 sqm 1-30 16.32 462,020
Compaction of Natural Grounds Upto 95% modified
AASHTO density all as specified
2 28310.02 sqm 1-31 16.91 478,722
Excavation, as in ordinary Hard soil of roadway/ Stripping
etc and dispose off/ collect spoil within 1 KM,complete as
all specified
3 21691.80 cum 1-37 219.89 4,769,810
Load "excavatrd Spoil" as in soil/rock on truck/trolly or any
other means, caryy beyond 10 meters (Specified in items 1-17 280.12
01-01 to 01-10) upto 100 meters or part thereof, unload 1-19 30.38
4 and stack or spread, including lead (carry beyond 1KM to 21691.80 cum 21,500,478
15KM) all as specified. 28(1-20) 680.68
991.18

Making Embankment with the specified approved soil


obtained from borrow pits excavation within 1 KM
5 including compaction in 150 mm layers upto 95% Modified 21691.80 cum 1-34 378.71 8,214,902
AASHTO density and dressing to required profile and
shape, all as specified.

Bottoming sub base of any thickness as specified using


Grannular Sub Base material laid and compacted to 100%
6 6960.16 cum 2-15 1791.63 12,470,031
Modified AASHTO density by appopriate compacting
equipment and roller.

Water Bound Macadam (WBM) base course of CBR 100%,


any thickness as specified laid and compacted to 100%
7 3120.30 cum 2-17 1945.53 6,070,637
Modified AASHTO density by appopriate compacting
equipment and roller.

Hot surface dressing three coats work on Water bound


macadam surface not previously treated with hot or cold
8 20299.63 sqm 2-32 604.20 12,265,036
dressing, using broken crushed stone complete all as
specified.

Providing and laying of PCC solid blocks for non load


9 bearing walls as specified in building blocks wall including 122.46 cum 3-61 9430.60 1,154,871
setting and jointing in CM 1:3 upto GF roof level.

Provisions of drain as per drawing and specification


10
11 Road marking paint as per drawing and specification
Provision of road stud/reflectors as per drawing and
12 specification

Provision of footpath as per drawing and specification


13
Road Lights (Post foundation,post Lights, Electric Wires)
14
15 Green Belt-Trees
67,386,508
Amount with
20% 20%

19.58 554,423

20.29 574,467

263.87 5,723,772
336.14
36.46
25,800,574
816.82
1189.42

454.45 9,857,882

2149.96 14,964,038

2334.64 7,284,765

725.04 14,718,044

11316.72 1,385,846
80,863,810