Premix Aphaltic Road: # Description Qty Unit S.I Rate Amount at Par
Premix Aphaltic Road: # Description Qty Unit S.I Rate Amount at Par
Premix Aphaltic Road: # Description Qty Unit S.I Rate Amount at Par
Amount at
# Description Qty Unit S.I Rate par
2 Prime coast on base course surface 262,498.98 Sqm 2-84 129.74 34,056,618
575,211,726
Amount with
20% 20%
2,305.32 92,237,259
155.69 40,867,941
9,898.25 106,494,062
81.68 9,470,036
10,522.70 197,216,834
446,286,133
465.86 28,539,863
507.29 8,711,677
17,984.28 280,703,678
14,996.93 257,542,844
4,435.39 76,170,761
42,000.00 5,628,000
141.60 1,806,271
3,900.00 31,150,977
690,254,071
BILL OF QUANTITIES
Provision of Premix Carpeting Roads for Pine City Housing Scheme at Haripur
Amount at
Sr No Description Qty Unit S.I Rate par
1 Clearing and Grubbing as all specified 28310.02 sqm 1-30 16.32 462,020
Compaction of Natural Grounds Upto 95% modified
AASHTO density all as specified
2 28310.02 sqm 1-31 16.91 478,722
Excavation, as in ordinary Hard soil of roadway/ Stripping
etc and dispose off/ collect spoil within 1 KM,complete as
all specified
3 21691.80 cum 1-37 219.89 4,769,810
Load "excavatrd Spoil" as in soil/rock on truck/trolly or any
other means, caryy beyond 10 meters (Specified in items 1-17 280.12
01-01 to 01-10) upto 100 meters or part thereof, unload 1-19 30.38
4 and stack or spread, including lead (carry beyond 1KM to 21691.80 cum 21,500,478
15KM) all as specified. 28(1-20) 680.68
991.18
19.58 554,423
20.29 574,467
263.87 5,723,772
336.14
36.46
25,800,574
816.82
1189.42
454.45 9,857,882
2149.96 14,964,038
2334.64 7,284,765
725.04 14,718,044
11316.72 1,385,846
80,863,810