Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
4K views2 pages

Mo Bidyut Charges

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

 ଓଡ଼ିଆ Login

New Connection Charges


Shared By: D Pradeep Kumar Dora

NEW CONNECTION CHARGES

DOMESTIC −

DOMESTIC 0.5 kW 1.0 kW 1.5 kW 2.0 kW 2.5 kW 3.0 kW 3.5 kW 4.0 kW 4.5 kW 5.0 kW

Processing 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Fees(Excl.GST
@18%)

Service 1500.00 1500.00 1500.00 1500.00 2500.00 2500.00 2500.00 2500.00 2500.00 2500.00
Connection
Charges(Excl.GST
@18%)

Inspection Fees 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00

Security Deposit 234.00 508.00 872.00 1196.00 1560.00 1916.00 2352.00 2748.00 3184.00 3580.00

Meter Cost 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00

GST 279.00 279.00 279.00 279.00 459.00 459.00 459.00 459.00 459.00 459.00

Total 3593 3867 4231 4555 6099 6455 6891 7287 7723 8119

GENERAL PURPOSE −

GENERAL 0.5 kW 1.0 kW 1.5 kW 2.0 kW 2.5 kW 3.0 kW 3.5 kW 4.0 kW 4.5 kW 5.0 kW
PURPOSE

Processing 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Fees(Excl.GST
@18%)

Service 1500.00 1500.00 1500.00 1500.00 2500.00 2500.00 2500.00 2500.00 2500.00 2500.00
Connection
Charges(Excl.GST
@18%)

Inspection Fees 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00

Security Deposit 1287.00 2734.00 4270.00 5847.00 7484.00 9061.00 10698.00 12274.00 13851.00 15428.00

Meter Cost 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00

GST 279.00 279.00 279.00 279.00 459.00 459.00 459.00 459.00 459.00 459.00

Total 4666 6113 7649 9226 12043 13620 15257 16833 18410 19987

SPECIFIED PUBLIC PURPOSE −

SPECIFIED 0.5 kW 1.0 kW 1.5 kW 2.0 kW 2.5 kW 3.0 kW 3.5 kW 4.0 kW 4.5 kW 5.0 kW
PUBLIC
PURPOSE

Processing 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Fees(Excl.GST
@18%)

Service 1500.00 1500.00 1500.00 1500.00 2500.00 2500.00 2500.00 2500.00 2500.00 2500.00
Connection
Charges(Excl.GST
@18%)

Inspection Fees 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00

Security Deposit 1374.00 2649.00 4023.00 5298.00 6672.00 7946.00 9321.00 10595.00 11970.00 13244.00

Meter Cost 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00
GST 279.00 279.00 279.00 279.00 459.00 459.00 459.00 459.00 459.00 459.00

Total 4753 6028 7402 8677 11231 12505 13880 15154 16529 17803

IRRIGATION, PUMPING & AGRICULTURE −

IRRIGATION, 0.5 kW 1.0 kW 1.5 kW 2.0 kW 2.5 kW 3.0 kW 3.5 kW 4.0 kW 4.5 kW 5.0 kW
PUMPING &
AGRICULTURE

Processing 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.00
Fees(Excl.GST
@18%)

Service 1500.00 1500.00 1500.00 1500.00 2500.00 2500.00 2500.00 2500.00 2500.00 2500.00
Connection
Charges(Excl.GST
@18%)

Inspection Fees 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00

Security Deposit 202.00 364.00 546.00 708.00 890.00 1052.00 1234.00 1396.00 1578.00 1740.00

Meter Cost 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00 1500.00

GST 279.00 279.00 279.00 279.00 459.00 459.00 459.00 459.00 459.00 459.00

Total 3561 3723 3905 4067 5429 5591 5773 5935 6117 6279

About Us Contact Us Our Products Terms and Conditions Privacy Policy


Refund Policy
Copyright © 2021, Mo Bidyut. All rights reserved. Developed by OPTCL IT DEPARTMANT

You might also like