Duerr Brochure Ecopaint Robot Painting Stations
Duerr Brochure Ecopaint Robot Painting Stations
Duerr Brochure Ecopaint Robot Painting Stations
www.durr.com
» Exterior painting station
The paint and application robots from the Ecopaint Robot At Dürr the pre-commissioning phase begins virtually.
product family are based on the concept, Painting programmes are set up in advance; tested in
systematically improving production efficiency and keep Dürr testing centers and optimized. This shortens the
unit costs sustainable while ensuring highest quality. The pre-commissioning phase. Short assembly times thus
system covers all aspects of efficiency and optimizes the allow for the robots to be installed in existing paint shops.
production process, with respect to material and energy
usage, assembly, start-up times and maintenance. The
Ecopaint Robot improves the flexibility and profitability and Simplified maintenance
guarantees highest quality in the entire painting process.
Common kinematic design painting robots and hood
openers and identical controls for door openers simplify
Energy efficiency maintenance and spare part replacement.
2
Ecopaint Robot – HIGHEST
FLEXIBILITY DURING PAINTING
Two processes for the operation of
Ecopaint Robot painting stations:
3
EcoRP
Eco RP PAINTING ROBOT
Frequent model changes and amended automobile designs The task of the painting robot is to move the atomizer
require the use of flexible paint automation, not only to around the surface to be painted, while maintaining a
meet styling demands, but also to provide world-class constant speed, distance and orientation. This technique
paint quality. ensures a homogenous paint film.
» Painting robot
Clean Wall Solution » Hood and door opener
EcoRP L133 EcoRP E133
» Painting robot
EcoRP E033
tower assembly
» Painting robot
» Painting robot EcoRP E133
EcoRP L153 swing arm
4
SERVICE SPECTRUM
coRP
co
Eco
EcoRP
RP PAINTING ROBOT
5
» EcoRP Robot Opening, holding and closing during interior painting
Technical data
PAINTING ROBOT EcoRP E133, EcoRP L133, EcoRP L153, EcoRP L053
EcoRP E033, EcoRP L033
Application Area Max. Speed Application Area Max. Speed
Axis 1 EcoRP E ± 95° 115° / s ± 90° 72° / s
Robot rotation EcoRP L ± 115°
Axis 2 EcoRP E - 60° / + 110° 115° / s + 25° / - 90° 115° / s
Vertical arm swivelling EcoRP L + 65° / - 105°
Axis 3 + 80° / - 75° 115° / s + 80° / - 75° 115° / s
Horizontal arm swivelling
Axis 4 hand axis 540° / s 540° / s
Axis 5 hand axis (total x°) ± 540° 540° / s (total x°) ± 540° 540° / s
Axis 6 hand axis 700° / s 700° / s
Axis 7 Maximum 50 m 1.5 m/s Maximum 50 m 1.2 m / s
Travelling axis
Axis 8 + 40° / - 90° +55° / s
Axis 9 + 60° / 90° +69° / s
6
E co
EcoRP
coRP
RP HANDLING ROBOT
7
» EcoRP E133 as hood opener
Your benefits
» Modular construction for easy service and maintenance » Same drives and controllers are used for the door
» Streamlined, easy-to-clean, slim yet robust construction openers and painting robots
» Special opening tools for safe and repeatable processes » Hood opener and painting robot identical in construction
» Different arm lengths and spaces allow equipment to be
adapted to customer-specific painting processes
Technical data
8
EcoRail
Eco ail TRAVELLING AXES
EcoRail E
» Dual Rail Clean Wall solution
The possibility exists to install the EcoRail E travelling axis at
different heights – according to the specific painting job. This
ensures that painting and application robots are mounted
at the optimum height. The advantages are: For complex requirements
» Accessibility to all areas to be painted
» Interference- free view inside the booth With box concepts in combination zones or during tracking,
» Greater flexibility during painting jobs it may be necessary to have two travelling axes arranged
vertically above each other. This achieves shortened zone
lengths for painting booths. EcoRail E and EcoRail C
EcoRail C are available as an optional Clean Wall design. This design
protects the adjacent booth wall and the robot travelling
The EcoRail C travelling axis is installed low on the booth axis components from painting process contamination
wall. The advantages are: (overspray) and minimizes the cleaning requirements.
» Automatic mastering
» Explosion-protected version
» Reduced booth width
» Expansion of workspace for robots
» Capacity for 24 circulating colors,
max. 36 random colors
EcoRail VSS
The EcoRail VSS with two travelling axes is a heavy duty rail
and can be used for a swing arm robot or sword brushes.
» EcoRail E
9
Your benefits
10
ROBOT AND PROCESS CONTROL
Visualization
11
Dürr – Leading in Production Efficiency
Four divisions,
Paint and Assembly
one goal:
Systems
maximum
plant production
und baut Lackierereien
efficiency for und
our customers
Endmontagewerke für die Automobilindustrie. Application
Technology sorgt mit ihren Robotertechnologien für den automatischen Lackauftrag. Maschinen und Systeme von Measuring
and
» Paint and Assembly
Process Systems:unter
Systems kommen Paint anderem
shops andim Motoren-
final assemblyund Getriebebau
plants und in der industry
for the automotive Fahrzeugendmontage
and aerospace zum Einsatz.
construction
Der
» Application Technology: Robot Clean
vierte Unternehmensbereich Technology
and application Systemsfor
technology beschäftigt sich mit
applying paint, Verfahren
adhesives and zur Verbesserung der Energie-
sealants
Measuring
effizienz
» andAbluftreinigung.
und der Process Systems: Balancing technology, cleaning and surface processing technology as well as testing,
filling and assembly products
» Clean Technology Systems: Exhaust air purification systems, energy efficiency technologies
Änderungen vorbehalten. Die Informationen in dieser Broschüre enthalten lediglich allgemeine Beschreibungen bzw. Leistungsmerkmale, welche
im konkreten Anwendungsfall abweichen können. Die gewünschten Leistungsmerkmale sind nur dann verbindlich, wenn sie bei Vertragsschluss
ausdrücklich vereinbart werden. © Dürr Systems GmbH
www.durr-application-technology.de