Plant Condition Assessment Guides Maintenance

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10
At a glance
Powered by AI
The key takeaways are that condition assessment of plant assets is important for effective maintenance and risk assessment. A more standardized approach to condition assessment using standard formats and checklists is proposed.

Condition assessment identifies plant in sub-standard condition and at risk of failure, allowing efficient targeting of maintenance strategies. It is also the basis for carrying out risk assessments.

The proposed methodology involves a staged process starting with a brief routine inspection and possibly followed by a detailed inspection, both using standardized checklists and reports.

Plant Condition Assessment Guides Maintenance

Author : Ron Davies

September 1, 2017

ABSTRACT

Condition assessment of plant assets is widely performed in industry, and is the basis for managing an
effective maintenance programme. Many different inspection reporting formats, however, are used in industry
for the same type of plant. A more standardised approach to the strategy and condition assessment of plant of
all types is proposed, using a staged approach in conjunction with standard format inspection checklists and
reports.

1. THE ROLE AND IMPORTANCE OF CONDITION ASSESSMENT

Effective maintenance depends on a good knowledge of asset condition, which is achieved through regular
condition assessment. Condition assessment identifies plant in sub-standard condition and hence at risk of
failure, in turn allowing the efficient targeting of maintenance strategies. Condition assessments are also the
basis for carrying out risk assessments.

Condition assessments of all types of assets, including process plant and structures, are performed throughout
industry, and all involve the same basic objective and approach. Almost every company seems to have its own
particular approach and checklists for recording information, despite the fact that all companies have the same
objective in mind for the same equipment. Clearly there is a case for some degree of basic standardisation in
carrying out condition assessments.

National and industry standards and guidance for the inspection and testing of individual types of equipment
and plant are widely published, but not on an inter-industry basis. Equipment manufacturers usually provide
guidance on the condition assessment and monitoring of their equipment, to be included in maintenance
programmes. Thus there is a rational basis for developing a more standardised approach for condition
assessment between the various technical and national organisations.

Diversity of industry and of equipment type may have been viewed as obstacles to achieving a more unified or
standardized approach to condition assessment in the past, but this can be largely overcome by adopting a
flexible and common system of basic inspection formats covering all process plant. Another negative factor,
perhaps, to a more unified approach is a lack of urgency, and hence of co-operation between various industry
organisations and equipment manufacturers, to provide guidance and set the standards needed. This is
changing, however.

Standardised approaches have been proposed and published in more recent years by industry associations for
carrying out formal condition assessments [1– 10]. The objective appears to be the setting up of a standard
framework or approach for carrying out condition assessment systems for particular industries, with guidance
using suggested documented inspection checklists. For example, The Water Environmental Research
Association [1], in collaboration with other organisations, identified the lack of standardised guidelines for
conducting assessments, and prepared a document to address the situation.

The publications referred to discuss standard systems generally or very specifically. The purpose here  is to
propose a more standardised approach to the strategy and condition assessment of process plant of all types,
using a staged approach in conjunction with standard assessment checklists. Standardised checklists allow the
condition of plant to be quickly assessed by others, and the format design of such checklists is usually the
result of considered evaluation by industry in general. The approach is illustrated in this paper via its
application to process plant, but it can be applied to other engineering plant situations.

2.  CONDITION ASSESSMENT METHODOLOGY

The standardised condition assessment approach proposed here for process plant can be viewed in broad terms
as a staged process, as proposed in Figure 1 and described in Table 1. (Note: For simplicity, the hierarchical
system used in this paper is: plant, unit, component).
Figure 1

The various stages are linked through a unified system, starting with a brief, routine inspection and followed
by a detailed inspection where warranted, both as precursors to setting up realistic maintenance and condition
monitoring programmes. Standard checklists or inspection reports are proposed for the condition assessment in
Stages 1 and 2, which can be universally applied to many plant situations. A single, basic checklist only would
be needed for Stage 1 since this is a general assessment of a complete plant, looking at each type of unit
collectively, e.g. groups of pumps performing similar functions. In the checklist, a particular property (e.g.
visual condition) of a unit would be rated according to a scale.

For situations where more further detailed investigation is identified in Stage 1, or warranted through
regulatory or standard practice requirements in more complex plant (e.g. steam turbines, process units in an oil
refinery, etc.)  a more detailed condition assessment would normally follow for the individual plant units
(Stage 2). This would involve using standard checklists or reports for individual components (e.g. each pump)
provided by the manufacturer of the plant itself or by a trade association. In the case of more complex plant
(e.g. steam turbine)  a detailed checklist might first be completed for the unit and sub-units, followed by a
more detailed inspection report according to the manufacturer of the plant itself.

The checklists and reports proposed could be completed manually on paper or directly onto a tablet for
subsequent downloading to a computerised maintenance system.

The point should be made that designing condition assessment forms for collecting information requires an
understanding of human psychology if the reporting forms are to be completed fully and regularly. To this end,
it is essential that they are as simple and effective as possible. Complex checklists are less likely to be filled in
with any enthusiasm.

3.  EXAMPLES OF PROPOSED CONDITION ASSESSMENT APPROACH.

The approach taken will depend on the type and complexity of the process plant being assessed. For example,
the condition assessment of a simple water treatment plant using chlorine to disinfect borehole water would
involve a Stage 1 condition assessment, and only a Stage 2 assessment where a serious deficiency is
identified. In the case of an oil refinery or similar complex plant, say of a hazardous nature, and made up of
various process units, a Stage 1 assessment would be carried out routinely, followed by a Stage 2 assessment
of all units at longer time intervals. Each unit in an oil refinery (e.g. a desulphurisation unit) is as complex as a
simple water treatment plant.

Two types of condition assessment reporting formats are proposed: a columnar checklist format in which a
particular property is rated according to a scale (or a particular property value is stated) and an open report
format where more detail is required in which a particular property value is stated or described. The practical
application of both formats is discussed here.
A common use of a checklist in columnar format is to rate a plant unit according to a particular property, e.g.
visual condition or performance. An overall rating for a single unit is calculated, allowing individual units to
be prioritised for further action. A five-point rating system is proposed, following common practice in
published references, and is described in Section 3.1. A columnar type format could also be used to state the
value of a particular property. An open report format is commonly used where more detail is required, where
the value of a particular property is stated.

3.1  Stage 1 condition assessment

The columnar type checklist format is appropriate in providing a simple but effective approach for a Stage 1
condition assessment. Table 2 shows an example of a Stage 1 condition assessment of a water pumping station,
the operation of which is based on the abstraction and disinfection of water from boreholes.

Table 2

The inspection checklist format proposed in Table 2 would be a standard for all types of process plant, eg.
power plants, refineries, water treatment plants. The plant unit headings would be appropriate to the plant
being inspected, and be represented as a single category for units of similar service, ie. borehole, booster and
high-lift pumps would be assessed separately in groups. Any additional issues specific to the plant in question
which require further comment by the individual company itself would be contained in an appendix to the
report.
In the example in Table 2, various deficient issues are identified and follow-up action proposed in order to
rectify them through maintenance scheduling. Since the actions identified in this example are fairly
straightforward in this case no detailed Stage 2 assessment is required.

3.2  Stage 2 condition assessment

A more detailed condition assessment (Stage 2) is carried out where this need is identified from the Stage 1
assessment, or as standard for more complex plant as warranted through regulatory or standard practice
requirements, for example using inspection checklists or maintenance schedules prescribed by the
manufacturer of the plant item itself.

An example of a detailed condition assessment report format for an individual unit, in this case a pump, is
shown in Table 3. For more complex and hazardous plant, this assessment would sensibly be preceded using a
more general columnar checklist covering all units or as appropriate (Table 4 column headings), followed by a
more detailed inspection report for each unit or component where a deficiency has been identified (e.g. Table
3). Any additional issues specific to the plant in question which require further comment would be contained in
an appendix to the report.
Table 3 Example of a checklist for the detailed inspection of an individual plant unit, in this case a pump
(Stage 2). (Full checklist available from the British Pump Manufacturers’  Association [9])

Table 4 Suggested information to be included in a standard (Stage 2) report in columnar format for a unit or
units  in complex plant requiring more detailed condition assessment, e.g. a refinery desulphurisation unit.
(A separate detailed assessment would be completed for each individual unit or component as warranted,
as per the format in Table 3).

The inspection checklist format proposed in Table 3 would be a standard for all types of process plant, e.g.
power plants, refineries, water treatment plants.   For complex plant, the approach might be to complete a
brief, a Stage 1 condition assessment on a regular basis (say every six months) to provide a general idea of the
plant condition (this would identify any urgent issues needing immediate attention), followed by a detailed
assessment as in Tables 3 and 4 at a longer time interval.

4. A STANDARDISED CONDITION ASSESSMENT APPROACH

Condition assessment has always been a part of maintenance, but is often managed in a less coordinated or less
systematic way than the standardised approach being advocated more recently here and in the literature. This
comment also applies to the different condition assessment formats found in computerised maintenance
management systems.

There are clear benefits in adopting a more standardised approach to plant condition assessments as suggested
here: a clear, uniform presentation of essential data necessary to make an effective and balanced assessment,
which allows inter-industry standardisation and hence comparison, and assists regulatory or inspection
authorities in auditing company reports. The last is sometimes required by regulatory bodies, e.g. Ofwat, the
UK water regulator.

The inspection checklist formats proposed in Stages 1 and 2 above are suggested, and final formats would be
decided by broad consensus to cover all types of process plant.  The ideal approach would be to have as few
basic reporting formats as needed to cover most types of process plant situations.  They should be designed to
be as simple and effective as possible. A single brief, Stage 1 condition assessment checklist could be
formatted to cover most process plant types. In the case of a Stage 2 condition assessment of complex plant
reporting in more than one format may be advantageous for effectiveness, as appropriate. Again, the number of
report formats could be reduced by careful selection of essential data to achieve as wide an application as
possible.

For the condition assessment of individual units or components separate checklists or reports would be needed.
These are mostly available from the unit or component manufacturers. Many process plants have their own
peculiarities and hence operators would likely attach a brief, separate report to the standard checklist or
inspection report to highlight specific issues.

It is suggested that a professional, trade or standards association would be the appropriate vehicle to organise
the setting up and management of a standard plant condition assessment system. A committee comprising
interested parties from engineering related bodies would be formed to advise and prepare the standard
inspection checklists and reports, and associated documentation. This would provide a measure of confidence
across industry in the soundness of the approach advocated and the documentation proposed.

REFERENCES

1. Condition assessment strategies and protocols for water and wastewater utility assets. Water Environment
Research Foundation (WERF), CSIRO, Australia. 2007. www.werf.org

2. Pump station condition assessments (a proven and defensible approach). Richards, M. and Greeley, P.
Boston Water and Sewer Commission, USA. www.newea.org

3. Visual assessment manual for utility assets. New Zealand Water and Wastes Association,
2008. www.waternz.org.nz

4. Asset management condition grading standards. Saskatchewan Ministry of Municipal Affairs.


2006. www.saskatchewan.ca
5. Guidelines for condition assessments. Queensland Government, Australia. 2011. www.health.qld.gov.au

6. Condition assessment and asset performance guidelines. IPWEA-NAMS (Institute of Public Works


Engineering Australasia-New Zealand Asset Management Support). 2007. www.ipwea.org.au

7. Development of health indices for asset condition assessment. Hjartarson, T., Jesus, B., and Hughes,
D.T. Transmission and Distribution Conference and Exposition 2003, IEEE, USA.

8. Asset management planning. Portland Water Bureau, USA. 2013. www.portlandoregon.gov

9. Pump condition assessment template, British Pump Manufacturers’ Association.


www.portlandoregon.gov http://www.portlandoregon.gov

10. Developing a quantitative method for assessing plant conditions. Qin Fen Zhang and Smith, B.T.
(2013). HydroWorld.com.