Update Relationship in Primavera P6 by Excel Help and Manually
Update Relationship in Primavera P6 by Excel Help and Manually
Ahmad Setayandeh
@Global Project Control
1/21/2021
Update Relationship
6
2
8
7
9
3
5
I try to show you all steps which that I mentioned in text on above picture.
But this solution is not helpful if you want to use it for big projects, you need to
better tools to do this easily. Also, in order to find the effect of relationship changes
between activities you should study it before applying it to your project. This
solution is use to software spreadsheet export file for “Activity Relationship”.
Date: 21-Jan-2020
Page 1 of 4
Prepared By: @YouTube/ Global Project Control
Update Relationship
Please go to file menu and select export, then you should select your project for
update and go through your template. In my point of view below filed are necessary
in order to avoid any mistake during update. Also, you can delete unnecessary
items before applying the import file (be careful about it, because you should have
experience in this field).
Date: 21-Jan-2020
Page 2 of 4
Prepared By: @YouTube/ Global Project Control
Update Relationship
I marked the necessary items in above by Blue. But how you can work with the
export file.
Date: 21-Jan-2020
Page 3 of 4
Prepared By: @YouTube/ Global Project Control
Update Relationship
Summary:
If you drive a big project, update relationship by excel is more practical and in case
of a little update, manual update is very useful
If you need more help you can contact me, I am always available for further
information. Also, I am ready to share you below information:
1. PDF File
2. Video file https://youtu.be/bBlsjO_k_as
https://www.linkedin.com/in/ahmad-set
https://www.youtube.com/c/GlobalProjectControl
https://www.instagram.com/globalprojectcontrol/
https://www.facebook.com/FBglobalprojectcontrol
Date: 21-Jan-2020
Page 4 of 4
Prepared By: @YouTube/ Global Project Control