FCO NO. _
Samples were collected from below three different locations for understanding the
presence / growth of microbiological matter.
1. Sea water inlet (Pre-filter inlet)
2. RO Supply pump outlet to MCF
3. SWRO Inlet (MCF Outlet)
As per analysis report total bacterial count is 110,82 and 170 CFU/ml. Pseudomonas
bacteria presence is found in sample 2 and sample 3 (20and 87 CFU/100ml respectively)
One CARDIFFAIR unit can drive two coils. OEM has recommended 6 units as per the
attached P&ID, hence 12 coils will be required. Each coil will require 300 mtr. Cable (6
Sqmm – single core – 84 strands, Flexible).
Questions Clarifications from OEM
1. Dimensional Details of control Unit, - 280mm (H) X 370mm (W) X 190mm
Installation recommendations, (D) – IP68 rated
operating temperature range, - Unit requires 230V AC, 50Hz.
Details of power supply Operating temperature range of the
requirement, installation in any unit is 15 degree Celsius to 85
additional Panel if required degree Celsius. Wall mounting
fittings for the enclosure to be
provided by the
2. Material / Preparation required for - Details provided by the vendor.
installation at site. Details of coil to BOQ prepared accordingly. Ref.
be arranged. BOQ items.
3. Can we install the units by our self - Cardiffair ASRAPS employee
or will it require engineer ? required to supervise the
installation of the units and then
certify the commissioning once the
units are installed and operational
SHUWEIHAT ASIA POWER COMPANY
SHUWEIHAT ASIA O&M COMPANY
DOC. NO: SAPCO / SAOM-IMS-MOC-F-
REV: 02 EFFECTIVE DATE: 30-01-2020 PAGE 3 OF 4
028
APPROVED BY: PGM AND
PREPARED BY: MA REVIEWED BY: EM AND PM
EMD
FIELD CHANGE ORDER
2. Technical Note:
Material Cost
Option 1 (UV Filter installation)
S. No Description Qty Rate/Unit Total Cost
(USD) (USD)
1 5C X 25Sqmm, Cu Cable, Un armored – 150Mtr.
Solid cable
2 Instrumentation Cable. (Signals to be 150
transferred not known) Cable available Mtr.
at site. To be checked.
3 GRP Pipe cutting and flange
installation.
4 Reactor vessel installation
5 Supply of Reactor Vessel along with
Electrical Panel and Spare parts.
6
ORIGINATOR SIGNATURE
4. HSE Evaluation:
Health Impact:
Safety Impact
Environment Impact
5. Performance Evaluation:
9. SAPCO – Remarks