Daftar Harga Satuan Bahan: Mekanikal Elektrikal
Daftar Harga Satuan Bahan: Mekanikal Elektrikal
Daftar Harga Satuan Bahan: Mekanikal Elektrikal
MEKANIKAL ELEKTRIKAL
A MEKANIKAL
PLUMBING
1 PIPA PPR PN-16 dia. 1/2" m 13,475.00
2 PIPA PPR PN-16 dia. 3/4" m 21,037.50
3 PIPA PPR PN-16 dia. 1" m 33,825.00
4 PIPA PPR PN-16 dia. 1 1/2" m 82,115.00
5 PIPA PPR PN-16 dia. 2" m 129,140.00
6 PIPA PPR PN-16 dia. 2 1/2" m 183,865.00
7 Gate Valve dia. 3/4" bh 101,000.00
8 Gate Valve dia. 1" bh 126,000.00
9 Gate Valve dia. 1 1/2" bh 243,000.00
10 Gate Valve dia. 2" bh 308,000.00
11 Gate Valve dia. 2 1/2" bh 372,370.00
12 Gate Valve dia. 3" bh 480,000.00
13 Gate Valve dia. 4" bh 650,000.00
14 Gate Valve dia. 6" bh 856,635.00
15 Gate Valve dia. 8" bh 958,000.00
16 chek valve dia 2 " bh 3,700,000.00
17 chek valve dia 4 " bh 4,350,000.00
18 chek valve dia 6 " bh 4,800,000.00
19 Pressure Reducing Valve 2 1/2" bh 12,500,000.00
20 Pressure Reducing Valve 6" bh 34,600,000.00
21 Joint Coupling Ø 2" unit 750,000.00
22 Joint Coupling Ø 2 1/2" unit 975,000.00
23 Joint CouplingØ 6" unit 2,800,000.00
24 Flow switch bh 395,000.00
25 Strainer Ø 6" unit 5,760,000.00
26 Automatic Air Release valve unit 4,020,000.00
27 Pressure gauge unit 477,600.00
28 Safety valve unit 4,308,000.00
29 Water Meter dia. 1/2” bh 170,000.00
30 Pipa PVC, klas 10 kg/cm² dia. 1/2" m 5,275.00
31 Pipa PVC, klas 10 kg/cm² dia. 3/4" m 7,200.00
32 Pipa PVC, klas 10 kg/cm² dia. 1" m 9,975.00
33 Pipa PVC, klas 10 kg/cm² dia. 1 1/4" m 14,725.00
34 Pipa PVC, klas 10 kg/cm² dia. 1 1/2" m 15,440.00
35 Pipa PVC, klas 10 kg/cm² dia. 2" m 21,300.00
36 Pipa PVC, klas 10 kg/cm² dia. 3" m 44,450.00
37 Pipa PVC, klas 10 kg/cm² dia. 4" m 67,300.00
38 Pipa PVC, klas 10 kg/cm² dia. 6" m 152,800.00
39 Roof Drain ø 4 inc. bh 120,000.00
40 Floor Drain bh 98,900.00
41 Clean Out ø 2 inc. bh 95,300.00
42 Clean Out ø 4 inc. bh 207,300.00
43 Biofil-08 bh 7,000,000.00
44 Kran Taman bh 45,000.00
45 Exhaust Fan Type Cielling cap 150 CMH bh 950,000.00
46 Exhaust Fan Type Wall cap 450 CMH bh 385,000.00
47 Exhaust Fan Type Wall cap 2.000 CMH bh 425,000.00
48 Fire Extinguisher,ABC (Dry chemical) cap. 3 kg bh 110,800.00
49 Submersible Pump cap. 50 Lpm, head : 10 m unit 6,000,000.00
50 Submersible Pump cap. 250 Lpm, head : 10 m unit 15,070,000.00
51 Centrifugal Pump cap. 150 lpm, head: 20 m unit 20,500,000.00
1 Pompa Sumur Dangkal 125 Wat unit 650,000.00
2 FRP Panel 1 m3 set 3,500,000.00
3 Deep Well Pump, cap. 200 lpm, head : 150 m set 51,000,000.00
4 Daily Tank Cap. 2.000 liter (steel t = 4 mm) incl. Pondasi unit 7,500,000.00
5 BBM Solar ltr 8,500.00
6 Bak Kontrol unit 250,000.00
7 Branch control valve. set 17,800,000.00
8 Resapan unit 1,500,000.00
60 Testing & Commissioning lot 2,500,000.00
2 Selang Fleksibel Pembuangan Wastafel M1 140,000.00
PEMADAM KEBAKARAN
1 BSP SChedule 40 Dia. 15 mm (1/2") m 13,936.50
2 BSP SChedule 40 Dia. 20 mm (3/4") m 15,221.67
3 BSP SChedule 40 Dia. 25 mm (1") m 23,800.00
4 BSP SChedule 40 Dia. 32 mm (1 1/4") m 32,038.33
5 BSP SChedule 40 Dia. 40 mm (1 1/2") m 32,000.00
6 BSP SChedule 40 Dia. 50 mm (2") m 38,600.00
7 BSP SChedule 40 Dia. 65 mm (2 1/2") m 51,900.00
8 BSP SChedule 40 Dia. 80 mm (3") m 81,985.00
9 BSP SChedule 40 Dia. 100 mm (4") m 107,100.00
10 BSP SChedule 40 Dia. 125 mm (5") m 206,981.67
11 BSP SChedule 40 Dia. 150 mm (6") m 268,636.67
12 Indoor Hydrant Box type: B set 3,200,000.00
13 Outdoor Hydrant Box type: C set 4,500,000.00
14 AP Hydrant Pillar Two Way set 3,580,000.00
15 Siamese Connection set 2,365,000.00
16 Head Sprinkler bh 55,000.00
17 Electric Pump 750 USGPM, Head : 100 m (vertical Turbin) unit 154,609,600.00
18 Diesel Pump 750 USGPM, Head : 100 m (vertical Turbin) unit 586,584,690.00
19 Jockey Pump 15 USGPM, Head : 110 m (vertical multistage) unit 24,484,690.00
A ELEKTRIKAL
LAMPU
1 Lampu Led 8 watt bh 30,200.00
2 Lampu Led 10 watt bh 32,690.00
1 Lampu Led 13 watt bh 53,670.00
1 Lampu Led 14 watt bh 50,000.00
5 Lampu Led 28 watt bh 150,000.00
2 Fitting bh 25,000.00
3 TL LED 10 watt bh 35,000.00
4 TL LED 18 watt bh 50,000.00
9 Armature RM bh 265,000.00
5 Armature Vshape bh 122,300.00
11 Lampu LED 70 watt bh 1,400,000.00
12 LED Strip Outdoor 5 meter bh 60,000.00
13 Saklar tunggal bh 12,000.00
3 Saklar Ganda bh 17,000.00
4 Saklar 10 gang bh 47,000.00
4 Kotak Kontak bh 12,000.00
7 Kwh Meter 1 Ph bh 150,000.00
8 Box MCB bh 45,000.00
KOMPONEN PANEL
9 MCB 2 A 1PH bh 85,000.00
10 MCB 4 A 1PH bh 85,000.00
KABEL
1 NYM Standart 3 x 2,5 mm2 m1 10,600.00
2 Pipa High Impact (PVC 1/2 ") m1 3,900.00
FIRE ALARM
13 Indoor Tel. Cable 2x2x0,6 mm2 m 4,000.00
41 Biaya Penyambungan PLN KVa 775,000.00
42 Biaya Jaminan KVa 15,000.00
ANALISA HARGA SATUAN
MEKANIKAL & ELEKTRIKAL
P MEKANIKAL
1 Lampu LED 13 watt
Lampu LED 13 watt bh 1.0000 53,670.00 53,670.00
Bahan Fitting bh 1.0000 25,000.00 25,000.00
accessories lot 1.0000 16,101.00 16,101.00
Pekerja OH 0.0460 85,000.00 3,910.00
Tenaga kerja
Tukang OH 0.0230 95,590.00 2,198.57
Jumlah 94,771.00 6,108.57 100,879.57
Keuntungan 10% 9,477.10 610.86 10,087.96
Jumlah + Keuntungan 104,248.10 6,719.43 110,967.53
Dibulatkan 110,900.00
10 Pemasangan Saklar Tunggal
Saklar Tunggal bh 1.0000 12,000.00 12,000.00
Bahan
Peralatan Bantu lot 1.0000 3,600.00 3,600.00
Pekerja OH 0.0200 85,000.00 1,700.00
Tukang OH 0.0250 95,590.00 2,389.75
Tenaga kerja
kepala tukang OH 0.0030 95,590.00 286.77
Mandor OH 0.0010 111,320.00 111.32
Jumlah 15,600.00 4,487.84 20,087.84
Keuntungan 10% 1,560.00 448.78 2,008.78
Jumlah + Keuntungan 17,160.00 4,936.62 22,096.62
Dibulatkan 22,000.00
3 Kotak Kontak
Kotak Kontak bh 1.0000 12,000.00 12,000.00
Bahan
Peralatan Bantu lot 1.0000 3,600.00 3,600.00
Pekerja OH 0.0200 85,000.00 1,700.00
Tukang OH 0.0250 95,590.00 2,389.75
Tenaga kerja
kepala tukang OH 0.0030 95,590.00 286.77
Mandor OH 0.0010 111,320.00 111.32
Jumlah 15,600.00 4,487.84 20,087.84
Keuntungan 10% 1,560.00 448.78 2,008.78
Jumlah + Keuntungan 17,160.00 4,936.62 22,096.62
Dibulatkan 22,000.00
4 Instalasi Penerangan
NYM 3 x 2,5 mm2 m 11.0000 10,600.00 116,600.00
Bahan Pipa High Impact, dia. 1/2" m 11.0000 3,900.00 42,900.00
Peralatan Bantu lot 1.0000 1,595.00 1,595.00
Pekerja OH 0.1500 85,000.00 12,750.00
Tenaga kerja Tukang OH 0.0150 95,590.00 1,433.85
Mandor OH 0.0500 111,320.00 5,566.00
Jumlah 161,095.00 19,749.85 180,844.85
Keuntungan 10% 16,109.50 1,974.99 18,084.49
Jumlah + Keuntungan 177,204.50 21,724.84 198,929.34
Dibulatkan 198,900.00
5 Instalasi Kotak Kontak
NYM 3 x 2,5 mm2 m 13.0000 10,600.00 137,800.00
Bahan Pipa High Impact, dia. 1/2" m 13.0000 3,900.00 50,700.00
Peralatan Bantu lot 1.0000 1,885.00 1,885.00
Pekerja OH 0.1500 85,000.00 12,750.00
Tenaga kerja Tukang OH 0.0150 95,590.00 1,433.85
Mandor OH 0.0500 111,320.00 5,566.00
Jumlah 190,385.00 19,749.85 210,134.85
Keuntungan 10% 19,038.50 1,974.99 21,013.49
Jumlah + Keuntungan 209,423.50 21,724.84 231,148.34
Dibulatkan 231,100.00
5 Instalasi Saklar Tunggal
NYM 3 x 2,5 mm2 m 13.0000 10,600.00 137,800.00
Bahan Pipa High Impact, dia. 1/2" m 13.0000 3,900.00 50,700.00
Peralatan Bantu lot 1.0000 1,885.00 1,885.00
Pekerja OH 0.1500 85,000.00 12,750.00
Tenaga kerja Tukang OH 0.0150 95,590.00 1,433.85
Mandor OH 0.0500 111,320.00 5,566.00
Jumlah 190,385.00 19,749.85 210,134.85
Keuntungan 10% 19,038.50 1,974.99 21,013.49
Jumlah + Keuntungan 209,423.50 21,724.84 231,148.34
Dibulatkan 231,100.00
14 Instalasi Telephone
Indoor Tel. Cable 2x2x0,6 mm2 m 30.0000 4,000.00 120,000.00
Bahan Pipa High Impact, dia. 1/2" m 6.0000 3,900.00 23,400.00
Peralatan Bantu lot 1.0000 1,434.00 1,434.00
Pekerja OH 0.2500 85,000.00 21,250.00
Tukang OH 0.5500 95,590.00 52,574.50
Tenaga kerja
kepala tukang OH 0.0550 95,590.00 5,257.45
Mandor OH 0.0183 111,320.00 2,040.87
Jumlah 144,834.00 81,122.82 225,956.82
Keuntungan 10% 14,483.40 8,112.28 22,595.68
Jumlah + Keuntungan 159,317.40 89,235.10 248,552.50
Dibulatkan 248,500.00
56 Pemasangan KWH meter 1 PH R. PANEL
KWH Meter 1 PH m 1.0000 150,000.00 150,000.00
MCB Box bh 1.0000 45,000.00 45,000.00
MCB 4 A 1 PH bh 1.0000 85,000.00 85,000.00
Bahan
MCB 2 A 1 PH bh 6.0000 85,000.00 510,000.00
NYM Standart 3 x 2,5 mm2 m 15.0000 10,600.00 159,000.00
Peralatan Bantu lot 1.0000 173,500.00 173,500.00
Pekerja OH 0.2750 85,000.00 23,375.00
Tukang OH 0.5000 95,590.00 47,795.00
Tenaga kerja
kepala tukang OH 0.0500 95,590.00 4,779.50
Mandor OH 0.0167 111,320.00 1,855.33
BIAYA SISTEM MANAJEMEN KESELAMATAN KESEHATAN KERJA KONSTRUKSI
DINAS/ INSTANSI : DINAS PERINDUSTRIAN, PERDAGANGAN, ENERGI DAN SUMBER DAYA ALAM
KEGIATAN : PEMELIHARAAN INSTALASI LISTRIK
PEKERJAAN : Bayongbong Garut
LOKASI : Jl. RAYA - SAMARANG No.5, BANJARSARI, BAYONGBONG,
KABUPATEN GARUT , JAWA BARAT 44162
TAHUN ANGGARAN : 2020
1 Penyiapan RK3K :
a Pembuatan manual/modul, prosedur dan instruksi kerja Set 2.00 200,000.00 400,000.00
b Pembuatan Kartu Identitas Pekerja (KIP) Org 4.00 35,000.00 140,000.00
5 Personil K3 :
a Petugas K3 OB 2.00 100,000.00 200,000.00
6 Fasilitas/Sarana Kesehatan :
a Peralatan P3K (Kotak P3K) Ls 1.00 80,000.00 80,000.00
7 Rambu-Rambu :
a Rambu Peringatan Bh 1.00 50,000.00 50,000.00
b Rambu Larangan Bh 1.00 35,000.00 35,000.00
c Rambu Informasi Bh 1.00 40,000.00 40,000.00
BACKUP VOLUME
No. Item Pekerjaan B atas p T L Volume Sat. Keterangan
1 Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor 15.45 x 1.36 x 0.12 2.52
15.41 x 1.36 x 0.12 2.51
3.85 x 1.5 x 0.12 0.69
0.8 0.6 0.12 0.06
5.79 m3
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
VI PEKERJAAN DINDING, KUSEN, PINTU DAN JENDELA
1 Pek. Bongkaran Pasangan 1/2 Bata 81.00 m2
5 4x 3 60.00 m2 Pintu Ruang UPTD
8 5x 3 15.00 m2 Pintu Ruang Staff
2 1.00 x 3 6.00 m2 Pintu Jendela dan BV
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
V PEKERJAAN ATAP
1 Pasang Rangka Atap Baja ringan kantor 9.33 x 4.55 42.45
0.5 x 7.35 x 4.55 16.72
10.9 x 7.28 79.35
0.5 x 4.35 x 7.28 15.83
aula 2x 6.74 x 5 67.40
2x 5.26 x 5 52.60
9.55 x 4.31 41.16
315.52 m2
2 #REF! 315.52 m2
3 Bubungan Atap Genteng Metal kantor 7.28 34.02 m1
aula 6.74
5
5
5
5
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
VI PEKERJAAN PLAFOND
1 Pasang Rangka Langit-langit Besi Hollow ruang pkk 7.65 23.4 7.65
wc 2.018 5.7 2.02
wc 1.417 4.8 1.42
mushola 7.764 11.65 7.76
teras mushola 2.36 6.6 2.36
r sraf 17.87 19 17.87
teras tengah 33.83 48.9 33.83
r seklur/kades 30.225 23.4 30.23
r pelayanan 26.97 23.4 26.97
r sekdis 14.82 15.4 14.82
r peng dus 14.82 15.4 14.82
teras depan 11.047 18.51 11.05
dak depan 6.225 11.3 6.23
aula 154.1775 52 154.18
m2 m1 331.19 m2
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
VII PEKERJAAN LANTAI
1 #REF! 1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
1 x 1 1.00 m2
12.00 m2
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
V PEKERJAAN SANITASI
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories 20.00 Ls
4 Pas. Floor Drain 2.00 Bh
5 Pek.Pas. Kran tembok lokal, dia 1/2 " 2.00 Bh
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
VIII PEKERJAAN ELEKTRIKAL DAN FINISHING
1 Pek. Mengikis atau Mengerok Permukaan Cat Tembok Lama 0.2 x Pengecatan Dinding #REF! m2
2 Pek. Pengecatan Dinding
VOLUME ACIAN 1,596.21 x 1 x 1 1596.21 m2 Bagian Luar
Bagian Dalam
IX PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Listrik 1.00 Ls
2 Stop Kontak 17.00 Bh
3 Saklar Ganda 17.00 Bh
4 Lampu TL 50 Watt 42.00 Bh
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
BACKUP VOLUME
REKAP BACKUP VOLUME
No. Item Pekerjaan Sat. Volume
### #REF!
I PEKERJAAN PERSIAPAN
0 Pek. Papan Nama Proyek Ls 1.00
0 Dokumentasi, Asbult Drawing dan Pelaporan Ls 1.00
C PEKERJAAN BETON
0 Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor m3 2.91
0 Plat Talang Beton Beton K-225, Tebal= 12 Cm aula #REF! #REF!
### #REF! #REF! #REF!
3 PEKERJAAN ATAP
0 Pasang Rangka Atap Baja ringan m2 #REF!
### Pasang Rangka Langit-langit Besi Hollow m2 0.00
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### Pasang langit - Langit Gypsump, Tebal 9mm m2 #REF!
### Pasang List Gypsump, t7 Cm m1 #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
4 PEKERJAAN PLAFOND
0 Pek.Bongkaran Plafond + Rangka #REF! #REF!
0 Pek.Pas.Rangka Plafond Kayu Kls. II #REF! #REF!
0 Pas. Langit-langit Triplek 4mm #REF! #REF!
### Pas. List Langit KayuProfil m1 #REF!
5 PEKERJAAN LANTAI
### #REF! #REF! 12.00
0 Pek. Lantai Keramik Granit Anti Slip Uk. 20 Cmx20Cm m2 5.80
### #REF! #REF! 137.39
### #REF!
### #REF! #REF! 81.00
1 Pek. Pasangan 1/2 Bata m2 798.11
0 Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm m2 1596.21
0 Pek. Acian m2 1596.21
### #REF! #REF! 1.00
### #REF! #REF! 1.00
### #REF! #REF! 1.00
0 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 4.00
0 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize + Asesoris Unit 1.00
### #REF! #REF! 2.00
0 Pas.Bouvenlight Type (BV2) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit #REF!
### #REF! #REF! #REF!
0 Pek. Dinding Partisi Type 1 m2 22.10
### #REF!
### #REF! #REF! #REF!
### #REF! #REF! #REF!
### #REF! #REF! 331.19
### #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00
### #REF! #REF! 17.00
### #REF! #REF! 17.00
### #REF! #REF! 42.00
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
BACKUP DATA VOLUME PERENCANAAN
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
RUMUS PXLXT
NO. URAIAN PEKERJAAN
P = PANJANG L = LEBAR T = TINGGI JML VOLUME SAT
I PEKERJAAN PERSIAPAN
- Pek. Papan Nama Proyek 1.00 1.00 LS
- Dokumentasi, Asbult Drawing dan Pelaporan 1.00 1.00 LS
- Pasang bowlpank -
P. BANGUNAN
81.10 81.10 M1
- Keselamatan Kerja Kontruksi (K3) 1.00 1.00 LS
- Mobilisasi 1.00 1.00 LS
- Air Kerja 1.00 1.00 LS
Jumlah I -
II PEKERJAAN BONGKARAN
- Bongkaran Dinding Bata 1.00 1.00 LS
- Bongkaran Beton 1.00 1.00 LS
- Bongkaran Kusen 1.00 1.00 LS
- Bongkaran Atap 1.00 1.00 LS
- Bongkaran Plapond 1.00 1.00 LS
- Bongkaran Instalasi Listrik 1.00 1.00 LS
- Bongkaran Lantai Keramik 1.00 1.00 LS
Jumlah II -
III PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
- Galian Tanah Untuk Pondasi Telapak 1.5m -
L.Bawah T.Bangunan P.Bangunan JML
0.70 x 1.00 0.70 12.00 5.88 M3
Pek, Pasangan Batu Kosong / Anstamping Tebal Urugan L.Lebar Bawah P.Batu Kosong
0.15 x 0.60 26.42 2.3778 M3
Jumlah III.B
C PEKERJAAN BETON
1 Pondasi
- Pondasi Telapak K-225 Aula -
L.Lebar Bawah Panjang Bawah Tingi Telapak JML
0.60 x 0.60 0.20 12.00 0.86 M3
2 Sloof
- Sloof Beton uk 15 x 25. K 175 -
Panjang Lebar P.Bangunan
0.25 x 0.15 50.40 1.89 M3
- Sloof Beton uk 15 x 20. K 175
Panjang Lebar P.Bangunan
0.20 x 0.15 45.24 1.36 M3
3 Kolom
- Kolom Pedestal uk 30 x 30 -
Panjang Lebar Tinggi Pedestal JML Pedestal
0.30 x 0.30 1.00 15.00 1.35 M3
Lembar 13
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
RUMUS PXLXT
NO. URAIAN PEKERJAAN
P = PANJANG L = LEBAR T = TINGGI JML VOLUME SAT
Lembar 14
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
RUMUS PXLXT
NO. URAIAN PEKERJAAN
P = PANJANG L = LEBAR T = TINGGI JML VOLUME SAT
Jumlah IV.A1 -
2 PEKERJAAN KUSEN ALUMUNIUM
- Pas. Pintu Panel dan Jendela Type (PJ1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 2.00 2.00 Unit
- Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 8.00 8.00 Unit
- Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize + Asesoris Unit 2.00 2.00 Unit
- Pas. Jendela Type (J1) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 3.00 3.00 Unit
- Pas. Jendela Type (J2) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 4.00 4.00 Unit
- Pas. Jendela Type (J3) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 15.00 15.00 Unit
- Pas.Bouvenlight Type (BV2) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 2.00 2.00 Unit
- Pas.Bouvenlight Type (BV3) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 1.00 1.00 Unit
Jumlah IV.A2 -
3 PEKERJAAN ATAP
- Pasang Rangka Atap Baja ringan -
Panjang Lebar : Kemiringan atap 30 Derajat
17.60 X 9.90 : 0.86 202.60 m2
24.00 24.00
32.00 32.00
50.40 50.40
36.60 36.60
19.45 19.45
11.82 11.82
12.22 12.22
7.20 7.20
5.40 5.40
6.30 6.30
20.80 20.80
13.21 13.21
16.50 16.50
Lembar 15
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
RUMUS PXLXT
NO. URAIAN PEKERJAAN
P = PANJANG L = LEBAR T = TINGGI JML VOLUME SAT
- Pek. Keramik Dinding Granit Anpholish Uk. 25Cm x 60 Cm 4.00 5.30 21.20 M2
- Pek. Keramik Dinding Wc Granit Anpholish Uk. 25Cm x 40 Cm 4.70 1.50 7.05 M2
Jumlah IV.A5 -
7 PEKERJAAN PENGECATAN / FINISHING
- Pek. Pengecatan Dinding 774.69 m2
- Pek. Pengecatan Plapond 346.26 m2
- Pek. Coating Batu Alam Lebar Tinggi Jumlah Muka Hasil x Jmlh Kolom Pilar
0.30 3.50 4.00 4.20 2.00 8.40 m2
4.00 5.50 22.00 m2
Keramik Batu Alam Dinding Depan 12.35 0.80 9.88 m2
JUMLAH TOTAL 40.28 m2
Jumlah IV.A7 -
V PEKERJAAN MEKANIKAL & ELEKTRIKAL
A PEKERJAAN PLUMBING
1 PEKERJAAN JARINGAN AIR BERSIH
- Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories 42.40 42.40 m1
- Instalasi Air Bersih Pipa PVC 1/2"+ Acsessories 42.40 42.40 m1
- Instalasi Air Bersih Pipa PVC 1."+ Acsessories 42.40 42.40 m1
Jumlah V.A1
2 PEKERJAAN JARINGAN AIR KOTOR
- Instalasi Air Kotor Pipa PVC 1.5"+ Acsessories 39.00 39.00 m1
- Instalasi Air Kotor Pipa PVC 2"+ Acsessories 39.00 39.00 m1
- Instalasi Air Kotor Pipa PVC 2.5"+ Acsessories 39.00 39.00 m1
- Instalasi Air Kotor Pipa PVC 3"+ Acsessories 39.00 39.00 m1
Jumlah V.A2
3 PEKERJAAN LAIN - LAIN
- Pasangan Bak Mandi Air Bersih Bh 2.00 2.00 -
- Pek. Kloset Jongkok Setara Toto Bh 2.00 2.00
- Pasangan Kran Air Bersih Bh 2.00 2.00
- Pasangan Floordrain Bh 2.00 2.00
- Pasangan Torn Air Bersih Kapasitas 1500 Liter Unit 1.00 1.00
- Pasangan Pompa Jet Phump Unit 1.00 1.00
Jumlah V.A3
B PEKERJAAN ELEKTRIKAL
1 Panel Utama
- box panel MCB ( kap. 4 group ) Bh 1.00 1.00 -
- grounding Bh 1.00 1.00 -
- MCB Bh 1.00 1.00 -
- pas. KWH 2200 W Bh 1.00 1.00
Jumlah V.B1
2 Pekerjaan Instalasi
- pek. Instalasi penerangan/titik lampu 41.00 41.00 Titik
- pek. Instalasi stop kontak 13.00 13.00 Titik
- pek. Instalasi Saklar 16.00 16.00 Titik
- pek. Instalasi steker TV 7.00 7.00 Titik
- pas. Steker tlp 2.00 2.00 Titik
Jumlah V.B2
3 Pekerjaan Kotak Kontak
- Pas. Stop kontak Bh 13.00 13.00
- Pas. Saklar Tunggal Bh 16.00 16.00
- Pas.steker TV Bh 7.00 7.00
Jumlah V.B3
4 Penerangan
- pasangan lampu down light Bh 41.00 41.00
- pasangan lampu Biasa 13 Wat
Jumlah V.B4
Di Buat Oleh
KONSULTAN PERENCANA
CV. SINERGI INOVASI
Kukun Rusyandi , ST
Direktur
Lembar 16
RENCANA ANGGARAN BIAYA REALISASI ( RAB )
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
I PEKERJAAN PERSIAPAN
- Pek. Papan Nama Proyek Ls 1.00 750,000.00 750,000.00
- Dokumentasi, Asbult Drawing dan Pelaporan Ls 1.00 4,000,000.00 4,000,000.00
- Pasang bowlpank m1 81.10 63,681.00 5,164,529.10
- Keselamatan Kerja Kontruksi (K3) Ls 1.00 3,200,000.00 3,200,000.00
- Mobilisasi Ls 1.00 2,500,000.00 2,500,000.00
- Air Kerja Ls 1.00 850,000.00 850,000.00
Jumlah I 16,464,529.10
II PEKERJAAN BONGKARAN
- Bongkaran Dinding Bata Ls 1.00 3,500,000.00 3,500,000.00
- Bongkaran Beton Ls 1.00 3,000,000.00 3,000,000.00
- Bongkaran Kusen Ls 1.00 2,500,000.00 2,500,000.00
- Bongkaran Atap Ls 1.00 3,000,000.00 3,000,000.00
- Bongkaran Plapond Ls 1.00 1,900,000.00 1,900,000.00
- Bongkaran Instalasi Listrik Ls 1.00 1,551,000.00 1,551,000.00
- Bongkaran Lantai Keramik Ls 1.00 3,000,000.00 3,000,000.00
Jumlah II 18,451,000.00
III PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
- Galian Tanah Untuk Pondasi Telapak 1.m m3 17.31 73,187.00 1,267,042.62
- Urugan Tanah Kembali m3 34.62 24,396.00 844,706.62
Jumlah III.A 2,111,749.24
B PEKERJAAN PONDASI
- Pondasi Batu Kali 1 : 4 m3 5.61 944,478.00 5,302,535.61
- Urugan pasir urug m3 1.11 293,275.00 325,711.22
- Pek, Pasangan Batu Kosong / Anstamping m3 2.38 512,362.00 1,218,294.36
Jumlah III.A 6,846,541
C PEKERJAAN BETON
1 Pondasi
- Pondasi Telapak K-225 Aula m3 0.96 1,071,091.00 1,028,247.36
- Pembesian Tulangan Pokok Ф 10 mm kg 31.25 22,761.00 711,235.73
Jumlah III.C1 1,739,483.09
2 Sloof
- Sloof Beton uk 15 x 25. K 175 m3 1.89 1,071,091.00 2,024,361.99
- Pembesian Tulangan Pokok Ф 10 mm kg 187.49 22,761.00 4,267,414.37
- Besi Cincin / Sengkang Ф 8 mm kg 65.78 22,761.00 1,497,218.58
- Begisting m2 25.20 187,257.00 4,718,876.40
- Sloof Beton uk 15 x 20. K 175 m3 1.36 1,071,091.00 1,453,684.71
- Pembesian Tulangan Pokok Ф 10 mm kg 112.20 22,761.00 1,453,684.71
- Besi Cincin / Sengkang Ф 8 mm kg 49.98 22,761.00 2,553,674.95
- Begisting m2 18.10 187,257.00 2,553,674.95
Jumlah III.C2 20,522,590.64
3 Kolom
- Kolom Pedestal uk 30 x 30 m3 1.35 1,127,741.00 1,522,450.35
- Pembesian Tulangan Pokok Ф 10 mm kg 74.40 22,761.00 1,693,418.40
- Besi Cincin / Sengkang Ф 8 mm kg 31.50 22,761.00 716,971.50
- Begisting m2 18.00 393,111.00 7,075,998.00
- Kolom Struktur 15/15 K-175 m 3
1.61 1,071,091.00 1,720,707.69
- Pembesian Tulangan Pokok Ф 10 mm kg 177.07 22,761.00 4,030,335.79
- Besi Cincin / Sengkang Ф 8 mm kg 157.08 22,761.00 3,575,297.88
- Begisting m2 42.84 393,111.00 16,840,875.24
- Kolom struktur uk 30 x 30. K 225 aula m 3
7.94 1,127,741.00 8,952,008.06
- Pembesian Tulangan Pokok Ф 10 mm kg 374.98 22,761.00 8,534,828.74
- Besi Cincin / Sengkang Ф 8 mm kg 163.80 22,761.00 3,728,251.80
- Begisting m2 90.72 393,111.00 35,663,029.92
Jumlah III.C3 94,054,173.37
4 Balok
- Balok Lintel 10/10 K-175 m 3
0.66 1,071,091.00 707,027.17
- Pembesian Tulangan Pokok Ф 10 mm kg 163.70 22,761.00 3,726,084.95
- Besi Cincin / Sengkang Ф 8 mm kg 33.11 22,761.00 753,502.91
- Begisting m2 13.20 371,661.00 4,906,668.52
- Balok uk 15 x 20. K 175 m 3
2.56 1,071,091.00 2,738,993.91
- Pembesian Tulangan Pokok Ф 10 mm kg 211.40 22,761.00 4,811,566.15
- Besi Cincin / Sengkang Ф 8 mm kg 93.98 22,761.00 2,139,169.82
- Begisting m2 34.10 371,661.00 12,672,153.46
- Balok uk 15 x 25. K 175 aula m 3
1.89 1,071,091.00 2,024,361.99
- Pembesian Tulangan Pokok Ф 10 mm kg 187.49 22,761.00 4,267,414.37
- Besi Cincin / Sengkang Ф 8 mm kg 65.78 22,761.00 1,497,218.58
- Begisting m2 25.20 371,661.00 9,365,857.20
Jumlah III.C4 49,610,019.02
5 Pelat Beton
- Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor m3 5.15 1,127,741.00 5,805,610.67
- Pembesian Tulangan Pokok Ф 8 mm kg 373.40 22,761.00 8,498,843.60
- Begisting m2 46.33 562,511.00 26,062,259.65
- Plat Talang Beton Beton K-225, Tebal= 12 Cm aula m 3
1.63 1,127,741.00 1,833,030.22
- Pembesian Tulangan Pokok Ф 8 mm kg 95.28 22,761.00 2,168,668.08
- Begisting m2 49.20 562,511.00 27,675,541.20
Sub Jumlah III.C 5 72,043,953.42
IV PEKERJAAN NON STRUKTURAL
A PEKERJAAN DINDING
1 - Pek. Pasangan 1/2 Bata m2 387.34 132,453.00 51,304,874.83
- Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm m2 774.69 61,573.00 47,699,864.22
- Pek. Acian m2 774.69 36,312.00 28,130,470.66
- Pek. Dinding Partisi Type 1 Unit 1.00 14,348,498.00 14,348,498.00
Lembar 17
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
- Pek. Keramik Dinding Wc Granit Anpholish Uk. 25Cm x 40 Cm m2 24.45 161,211.00 3,941,608.95
Lembar 18
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
879,318,307.98
966,370,681,692
Di Buat Oleh
KONSULTAN PERENCANA
CV. SINERGI INOVASI
Kukun Rusyandi , ST
Direktur
Lembar 19
DAFTAR HARGA SATUAN BAHAN
Program : Peningkatan Sarana dan Prasarana Aparatur
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor
Pekerjaan : Rehabilitasi Gedung Kantor UPTD TPH Kecamatan Pameungpeuk
Lokasi Pekerjaan : Kantor UPTD TPH Kecamatan Pameungpeuk
Tahun Anggaran : 2015
HARGA SATUAN
NO JENIS BAHAN BANGUNAN SATUAN
( Rp. )
1 2 3 4
1 2 3 4
C. Bahan Kayu Berikut Bahan Jadinya
1 Kayu Balok Albasia m3 2,000,000.00
3 Kayu Kelas II Lokal Garut ( Kihiang, Puspa, Kibanen, dll ) m3 3,500,000.00
5 Dolken dia 5 s/d 7 cm btg 46,000.00
6 Dolken dia 8 s/d 10 cm btg 61,000.00
8 Daun Pintu Panel Kls II bh 650,000.00
D. Bahan Penutup Rangka Langit-langit
2 Gypsum 120 x 240 cm lbr 110,000.00
3 List Gypsum C-7 m1 30,000.00
1 2 3 4
I. Bahan Paku dan Mur Baut
2 Paku 5 - 10 cm kg 16,000.00
4 Paku Gipsum kg 16,000.00
5 Angker baut bh 6,000.00
Seal Tipe bh 7,500.00
Sekrup bh 1,000.00
J. Bahan Perpipaan
2 Pipa Galvanis 3/4" btg 234,000.00
4 Pipa paralon PVC ( AW) dia 1/2", sekualitas Maspion btg 18,100.00
5 Pipa paralon PVC ( AW) dia 3/4", sekualitas Maspion btg 23,000.00
6 Pipa paralon PVC ( AW) dia 1", sekualitas Maspion btg 29,000.00
7 Pipa paralon PVC ( AW) dia 2", sekualitas Maspion btg 46,000.00
8 Pipa paralon PVC ( AW) dia 3", sekualitas Maspion btg 84,000.00
K Bahan Sanitair
1 Kloset Jongkok porselen INA, standard lengkap, putih unit 290,000.00
3 Bak Mandi fiber glass, uk. Kecil bh 230,000.00
4 Kran tembok lokal dia 1/2" bh 22,000.00
7 Floor drain lokal bh 20,400.00
8 Pas. Tangki air fiber 1000 ltr bh 1,200,000.00
9 Pompa Air 125 watt + Asessories bh 4,500,000.00
13 Pintu WC PVC set 800,000.00
1 2 3 4
..........................................
Direktur
REKAPITULASI
ANGGARAN BIAYA REALISASI
JUMLAH
NO URAIAN PEKERJAAN
( RP.)
Di Buat Oleh
KONSULTAN PERENCANA
CV. SINERGI INOVASI
Kukun Rusyandi , ST
Direktur
LAMPIRAN BERTA ACARA MC. 100%
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
KONTRAK REALISASI
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH
Rp. Rp. Rp. Rp.
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek 1.00 m2 300,822.00 300,822.00 1.00 Ls 750,000.00 750,000.00
2 Dokumentasi, Asbult Drawing dan Pelaporan 1.00 Ls 700,000.00 700,000.00 1.00 Ls 4,000,000.00 4,000,000.00
Jumlah I 1,000,822.00 Jumlah I 4,750,000.00
C PEKERJAAN BETON
1 Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor 1.86 m3 5,081,681.00 9,451,926.66 5.15 m3 1,127,741.00 5,805,610.67
2 Plat Talang Beton Beton K-225, Tebal= 12 Cm aula 0.41 m3 5,452,331.00 2,251,812.70 #REF! #REF! #REF! #REF!
3 #REF! 0.64 m3 4,887,740.00 3,128,153.60 #REF! #REF! #REF! #REF!
Jumlah II 14,831,892.96 Jumlah II #REF!
3 PEKERJAAN ATAP
1 Pasang Rangka Atap Baja ringan 76.27 m2 31,245.00 2,383,160.96 351.00 m2 220,000.00 77,221,023.26
2 Pasang Rangka Langit-langit Besi Hollow 93.80 m2 116,877.00 10,963,199.59 346.26 m2 121,544.00 42,085,217.72
3 #REF! 1.80 m3 6,483,018.00 11,697,739.59 #REF! #REF! #REF! #REF!
4 #REF! 0.69 m3 5,722,675.00 3,935,929.52 #REF! #REF! #REF! #REF!
5 Pasang langit - Langit Gypsump, Tebal 9mm 10.16 m1 44,122.00 448,279.52 346.26 m2 61,726.00 21,372,936.13
6 Pasang List Gypsump, t7 Cm 134.00 m2 108,872.00 14,589,030.29 287.90 m1 28,671.00 8,254,380.90
7 #REF! 43.05 m1 109,174.00 4,699,776.81 #REF! #REF! #REF! #REF!
8 #REF! 41.00 m1 76,326.00 3,129,366.00 #REF! #REF! #REF! #REF!
9 #REF! 12.66 m1 133,711.00 1,692,231.59 #REF! #REF! #REF! #REF!
Jumlah III 53,538,713.87 Jumlah III #REF!
4 PEKERJAAN PLAFOND
1 #REF! 113.22 m2 5,803.00 657,015.66 #REF! #REF! #REF! #REF!
2 #REF! 113.22 m2 127,495.00 14,434,983.90 #REF! #REF! #REF! #REF!
3 #REF! 113.22 m2 65,733.00 7,442,290.26 #REF! #REF! #REF! #REF!
4 #REF! 123.52 m1 21,975.00 2,714,242.13 #REF! #REF! #REF! #REF!
Jumlah IV 25,248,531.95 Jumlah IV #REF!
5 PEKERJAAN LANTAI
1 #REF! 1.00 Ls 735,930.00 735,930.00 #REF! #REF! #REF! #REF!
2 Pek. Lantai Keramik Granit Anti Slip Uk. 20 Cmx20Cm 4.62 m2 143,861.00 664,637.82 7.15 m2 143,861.00 1,027,886.85
3 #REF! 70.20 m2 200,527.00 14,076,995.40 #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF!
Jumlah V 15,477,563.22 Jumlah V #REF!
### #REF!
1 #REF! 17.20 m2 99,623.00 1,713,515.60 #REF! #REF! #REF! #REF!
2 Pek. Pasangan 1/2 Bata 17.20 m2 132,453.00 2,278,191.60 387.34 m2 132,453.00 51,304,874.83
3 Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm 47.40 m2 61,573.00 2,918,560.20 774.69 m2 61,573.00 47,699,864.22
4 Pek. Acian 47.40 m2 36,312.00 1,721,188.80 774.69 m2 36,312.00 28,130,470.66
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris 4.00 Unit 3,754,546.00 15,018,184.00 2.00 Unit 3,754,546.00 7,509,092.00
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize + Asesoris 1.00 Unit 2,946,737.00 2,946,737.00 8.00 Unit 2,946,737.00 23,573,896.00
11 Pas.Bouvenlight Type (BV2) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris 2.00 Unit 1,475,061.00 2,950,122.00 2.00 Unit 918,396.00 1,836,792.00
13 Pek. Dinding Partisi Type 1 23.10 m2 293,897.00 6,789,020.70 1.00 Unit 14,348,498.00 14,348,498.00
Jumlah VI 60,866,734.90 Jumlah VI #REF!
1 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories 20.00 m1 17,462.00 349,240.00 42.40 m1 17,462.00 740,388.80
2 #REF! 2.00 Bh 34,180.00 68,360.00 #REF! #REF! #REF! #REF!
3 #REF! 2.00 Bh 37,487.00 74,974.00 #REF! #REF! #REF! #REF!
4 #REF! 1.00 Bh 1,336,500.00 1,336,500.00 #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF!
Jumlah VII 1,829,074.00 Jumlah VII #REF!
Lembar 25
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
KONTRAK REALISASI
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH
Rp. Rp. Rp. Rp.
### #REF!
1 #REF! 77.85 m2 14,332.00 1,115,803.53 #REF! #REF! #REF! #REF!
2 #REF! 389.27 m2 15,376.00 5,985,415.52 #REF! #REF! #REF! #REF!
3 #REF! 113.22 m2 29,033.00 3,287,116.26 #REF! #REF! #REF! #REF!
4 #REF! 6.15 m2 65,006.00 399,786.90 #REF! #REF! #REF! #REF!
Jumlah VIII 10,788,122.21 Jumlah VIII #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL 1.00 Ls 1,800,000.00 1,800,000.00 1.00 bh 1,320,300.00 1,320,300.00
2 #REF! 3.00 Bh 20,900.00 62,700.00 #REF! #REF! #REF! #REF!
3 #REF! 3.00 Bh 20,900.00 62,700.00 #REF! #REF! #REF! #REF!
4 #REF! 6.00 Bh 82,500.00 495,000.00 #REF! #REF! #REF! #REF!
Jumlah IX 2,420,400.00 Jumlah IX #REF!
JUMLAH TOTAL 186,001,855.11 #REF!
PPN 10 % 18,600,185.51 #REF!
Jumlah Total 204,602,040.62 #REF!
Di Bulatkan 204,602,000.00 #REF!
Lembar 26
LAMPIRAN BERTA ACARA TAMBAH KURANG
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek 1.00 m2 300,822.00 300,822.00 - Ls 750,000.00 - - Ls 750,000.00 - 1.00 Ls 750,000.00 750,000.00
2 Dokumentasi, Asbult Drawing dan Pelaporan 1.00 Ls 700,000.00 700,000.00 - Ls 4,000,000.00 - - Ls 4,000,000.00 - 1.00 Ls 4,000,000.00 4,000,000.00
Jumlah I 1,000,822.00 Jumlah I - Jumlah I - Jumlah I 4,750,000.00
C PEKERJAAN BETON
1 Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor 1.86 m3 5,081,681.00 9,451,926.66 3.29 m3 1,127,741.00 3,708,012.41 - 3.29 m3 1,127,741.00 - 3,708,012.41 5.15 m3 1,127,741.00 5,805,610.67
2 Plat Talang Beton Beton K-225, Tebal= 12 Cm aula 0.41 m3 5,452,331.00 2,251,812.70 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 0.64 m3 4,887,740.00 3,128,153.60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah II 14,831,892.96 Jumlah II #REF! Jumlah II #REF! Jumlah II #REF!
3 PEKERJAAN ATAP
1 Pasang Rangka Atap Baja ringan 76.27 m2 31,245.00 2,383,160.96 274.73 m2 220,000.00 60,440,885.27 - 274.73 m2 220,000.00 - 60,440,885.27 351.00 m2 220,000.00 77,221,023.26
2 Pasang Rangka Langit-langit Besi Hollow 93.80 m2 116,877.00 10,963,199.59 252.45 m2 121,544.00 30,684,248.06 - 252.45 m2 121,544.00 - 30,684,248.06 346.26 m2 121,544.00 42,085,217.72
3 #REF! 1.80 m3 6,483,018.00 11,697,739.59 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! 0.69 m3 5,722,675.00 3,935,929.52 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 Pasang langit - Langit Gypsump, Tebal 9mm 10.16 m1 44,122.00 448,279.52 336.10 m2 61,726.00 20,745,799.97 - 336.10 m2 61,726.00 - 20,745,799.97 346.26 m2 61,726.00 21,372,936.13
6 Pasang List Gypsump, t7 Cm 134.00 m2 108,872.00 14,589,030.29 153.90 m1 28,671.00 4,412,418.89 - 153.90 m1 28,671.00 - 4,412,418.89 287.90 m1 28,671.00 8,254,380.90
7 #REF! 43.05 m1 109,174.00 4,699,776.81 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
8 #REF! 41.00 m1 76,326.00 3,129,366.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 #REF! 12.66 m1 133,711.00 1,692,231.59 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah III 53,538,713.87 Jumlah III #REF! Jumlah III #REF! Jumlah III #REF!
4 PEKERJAAN PLAFOND
1 #REF! 113.22 m2 5,803.00 657,015.66 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! 113.22 m2 127,495.00 14,434,983.90 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 113.22 m2 65,733.00 7,442,290.26 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! 123.52 m1 21,975.00 2,714,242.13 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah IV 25,248,531.95 Jumlah IV #REF! Jumlah IV #REF! Jumlah IV #REF!
5 PEKERJAAN LANTAI
1 #REF! 1.00 Ls 735,930.00 735,930.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 Pek. Lantai Keramik Granit Anti Slip Uk. 20 Cmx20Cm 4.62 m2 143,861.00 664,637.82 m2 143,861.00 - - 2.53 m2 143,861.00 - 363,249.03 7.15 m2 143,861.00 1,027,886.85
3 #REF! 70.20 m2 200,527.00 14,076,995.40 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah V 15,477,563.22 Jumlah V #REF! Jumlah V #REF! Jumlah V #REF!
### #REF!
1 #REF! 17.20 m2 99,623.00 1,713,515.60 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 Pek. Pasangan 1/2 Bata 17.20 m2 132,453.00 2,278,191.60 370.14 m2 132,453.00 49,026,683.23 m2 132,453.00 - 387.34 m2 132,453.00 51,304,874.83
3 Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm 47.40 m2 61,573.00 2,918,560.20 727.29 m2 61,573.00 44,781,304.02 m2 61,573.00 - 774.69 m2 61,573.00 47,699,864.22
4 Pek. Acian 47.40 m2 36,312.00 1,721,188.80 727.29 m2 36,312.00 26,409,281.86 m2 36,312.00 - 774.69 m2 36,312.00 28,130,470.66
5 #REF! 1.00 Unit 6,197,970.00 6,197,970.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
6 #REF! 1.00 Unit 5,364,677.00 5,364,677.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 #REF! 1.00 Unit 3,141,278.00 3,141,278.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize +
8 4.00 Unit 3,754,546.00 15,018,184.00 - 2.00 Unit 3,754,546.00 - 7,509,092.00 2.00 Unit 3,754,546.00 7,509,092.00 2.00 Unit 3,754,546.00 7,509,092.00
Kaca 5mm+ Asesoris
Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize +
9 1.00 Unit 2,946,737.00 2,946,737.00 7.00 Unit 2,946,737.00 20,627,159.00 - 7.00 Unit 2,946,737.00 - 20,627,159.00 8.00 Unit 2,946,737.00 23,573,896.00
Asesoris
10 #REF! 2.00 Unit 4,454,447.00 8,908,894.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12 #REF! 1.00 Unit 918,396.00 918,396.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 23.10 m2 293,897.00 6,789,020.70 - 22.10 Unit 14,348,498.00 - 317,101,805.80 22.10 Unit 14,348,498.00 317,101,805.80 1.00 Unit 14,348,498.00 14,348,498.00
Jumlah VI 60,866,734.90 Jumlah VI #REF! Jumlah VI #REF! Jumlah VI #REF!
1 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories 20.00 m1 17,462.00 349,240.00 22.40 m1 17,462.00 391,148.80 - 22.40 m1 17,462.00 - 391,148.80 42.40 m1 17,462.00 740,388.80
2 #REF! 2.00 Bh 34,180.00 68,360.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 2.00 Bh 37,487.00 74,974.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! 1.00 Bh 1,336,500.00 1,336,500.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah VII 1,829,074.00 Jumlah VII #REF! Jumlah VII #REF! Jumlah VII #REF!
Lembar 27
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
NO. URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH VOLUME SAT. HARGA SAT. JUMLAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
### #REF!
1 #REF! 77.85 m2 14,332.00 1,115,803.53 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! 389.27 m2 15,376.00 5,985,415.52 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 113.22 m2 29,033.00 3,287,116.26 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! 6.15 m2 65,006.00 399,786.90 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah VIII 10,788,122.21 Jumlah VIII #REF! Jumlah VIII #REF! Jumlah VIII #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL 1.00 Ls 1,800,000.00 1,800,000.00 - bh 1,320,300.00 - - bh 1,320,300.00 - 1.00 bh 1,320,300.00 1,320,300.00
2 #REF! 3.00 Bh 20,900.00 62,700.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! 3.00 Bh 20,900.00 62,700.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! 6.00 Bh 82,500.00 495,000.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah IX 2,420,400.00 Jumlah IX #REF! Jumlah IX #REF! Jumlah IX #REF!
JUMLAH TOTAL 186,001,855.11 #REF! #REF! #REF!
PPN 10 % 18,600,185.51 #REF! #REF! #REF!
Jumlah Total 204,602,040.62 #REF! #REF! #REF!
Di Bulatkan 204,602,000.00 #REF! #REF! #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginering
Lembar 28
PAJAK DAERAH MINERAL BUKAN LOGAM DAN BATUAN
Program : Peningkatan Sarana dan Prasarana Aparatur Pemerintah
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Pekerjaan : Rehabilitasi Sedang/Berat Gedung Kantor Kelurahan Pananjung
Lokasi Pekerjaan : Kantor Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut
Tahun Anggaran : 2020
Koefisien Jumlah
1 Plat Lantai Beton K-225, Tebal= 12 Cm Lantai Dak Kantor 5.15 m3 0.499 0.776 - 2.57 3.99
2 Plat Talang Beton Beton K-225, Tebal= 12 Cm aula #REF! m3 0.499 0.776 #REF! #REF! #REF!
3 #REF! #REF! m3 0.499 0.776 #REF! #REF! #REF!
4 Pas. Dinding bata 1:5 387.34 M2 0.045 - 17.43 -
5 Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm 774.69 M2 0.03 - 20.14 -
6 Pas. Lantai keramik 30 x 30 #REF! M2 0.045 #REF! #REF! #REF!
7 Pas. Rabat Beton #REF! m3 0.638 0.761 #REF! #REF! #REF!
Jumlah Total #REF! #REF! #REF!
Garut,..............................................2015
Mengetahui,
Kuasa Pengguna Anggaran
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! - #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! - #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! - #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! 1.00 #REF! 1.00 #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - 42.40 0.08 42.40 0.08
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D BULAN BULAN S/D BULAN
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - 1.00 0.15 1.00 0.15
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 100.00
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 13
PERIODE BULAN JULI - AGUSTUS
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! 1.00 #REF! #REF! 1.00 #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 42.40 0.08 - 42.40 0.08
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 1.00 0.15 - 1.00 0.15
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 100.00
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 12
PERIODE BULAN JULI - AGUSTUS
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! 1.00 #REF! #REF! 1.00 #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 42.40 0.08 - 42.40 0.08
2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - 1.00 0.15 1.00 0.15
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 99.33
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 11
PERIODE BULAN JULI - AGUSTUS
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! 1.00 #REF! #REF! 1.00 #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - 42.40 0.08 42.40 0.08
2 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 97.56
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 10
PERIODE BULAN JULI - AGUSTUS
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! 1.00 #REF! 1.00 #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 93.29
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN BULAN KE - 2
PERIODE BULAN JUNI - JULI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! 2.00 #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! 8.00 #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! - #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - - -
2 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D BULAN BULAN S/D BULAN
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - - -
2 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! - #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 87.74
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 9
PERIODE BULAN JUNI - JULI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! 2.00 #REF! #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! 8.00 #REF! #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 87.74
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 8
PERIODE BULAN JUNI - JULI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! 2.00 #REF! 2.00 #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! 8.00 #REF! 8.00 #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! #REF! #REF! #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 79.50
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 7
PERIODE BULAN JUNI - JULI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 52.09
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 6
PERIODE BULAN JUNI - JULI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 27.12
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN BULAN KE - 1
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! #REF! - #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! #REF! - #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! #REF! - #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
5 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D BULAN BULAN S/D BULAN
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
2 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! - #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 12.10
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 5
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 12.10
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 4
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 7.70
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 3
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 4.84
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 2
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! - #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! - #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! - #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - - -
2 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! - #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 1.98
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT
PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jln. Raya Samarang N0. 1 3 Tlp. (0262) 541850 Fax 238041 Garut 44151
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
DAFTAR KUANTITAS
LAPORAN KEMAJUAN MINGGU KE - 1
PERIODE BULAN MEI - JUNI
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Unit 2.00 #REF! #REF! #REF! - #REF!
Annodize + Kaca 5mm+ Asesoris
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Unit 8.00 #REF! #REF! #REF! - #REF!
Annodize + Asesoris
10 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
13 Pek. Dinding Partisi Type 1 Unit 1.00 #REF! #REF! #REF! - #REF!
Jumlah VI #REF! #REF! #REF! #REF!
1.00 PEKERJAAN JARINGAN AIR BERSIH
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 42.40 0.08 - - - -
2 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
5 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
Jumlah VII #REF! #REF! #REF! #REF!
S/D MINGGU MINGGU S/D MINGGU
REALISASI
Perkiraan LALU Perkiraan INI Perkiraan INI
NO. URAIAN PEKERJAAN SAT BOBOT BOBOT BOBOT BOBOT
VOLUME
% % % %
#REF! #REF! Kuantitas Kuantitas Kuantitas
1 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
2 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
Jumlah VIII #REF! #REF! #REF! #REF!
B PEKERJAAN ELEKTRIKAL
1 Pemasangan KWH meter 1 PH R. PANEL bh 1.00 0.15 - - - -
2 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
3 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
4 #REF! #REF! #REF! #REF! #REF! #REF! - #REF!
Jumlah IX #REF! #REF! #REF! #REF!
A JUMLAH TOTAL #REF! #REF! #REF! #REF!
B PROGRES RENCANA KOMULATIF 0.99
C SELISIH #REF!
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN
Jln. Raya Samarang N0. 113 Tlp. (0262) 541850 Fax 238041 Garut 44151
DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
REKAPITULASI TIME SCHEDULE ( JADWAL WAKTU PELAKSANAAN )
III PEKERJAAN ATAP 28.78 0.64 0.64 2.86 2.86 2.86 3.77 7.02 6.45
VI PEKERJAAN DINDING, KUSEN, PINTU DAN JENDELA 32.72 - - - - 1.53 11.25 8.14 8.14
A PROGRES RENCANA 100.00 0.99 0.99 2.86 2.86 4.39 15.02 24.98 27.41
B PROGRES RENCANA KOMULATIF - 0.99 1.98 4.84 7.70 12.10 27.12 52.09 79.50
C PROGRES REALISASI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
B PROGRES REALISASI KOMULATIF - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KETERANGAN :
RENCANA
REALISASI
KETERANGAN
NI-JULI BULAN JULI-AGUSTUS
KE - MINGGU KE -
9 10 11 12 13
20-Jul-15 27-Jul-15 3-Aug-15 10-Aug-15 17-Aug-15
- - - - 0.19 100 %
- - - - -
90 %
80 %
- - 1.68 - -
70 %
- - - - -
60 %
6.41 1.51 - - -
50 %
1.82 1.82 - - - 40 %
- - 0.98 - - 30 %
10 %
- - - - 0.27
0%
8.24 5.55 4.27 1.77 0.67
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
PEMERINTAH KABUPATEN GARUT PEMERINTAH KABUPATEN GARUT
DINAS SUMBER DAYA AIR DAN PERTAMBANGAN
Jln. Raya Samarang N0. 113 Tlp. (0262) 541850 Fax 238041Garut 44151
DINAS TANAMAN PANGAN DAN HORTIKULTURA
Jl. Pembangunan No. 183 Garut Telp. ( 0262 ) 233152 Fax. 233152
TIME SCHEDULE ( JADWAL WAKTU PELAKSANAAN )
KETERANGAN
BULAN MEI - JUNI BULAN JUNI-JULI BULAN JULI-AGUSTUS
BOBOT MINGGU KE - MINGGU KE - MINGGU KE -
NO. URAIAN PEKERJAAN SAT KONTRAK 1 2 3 4 5 6 7 8 9 10 11 12 13
% 25-May-15 1-Jun-15 8-Jun-15 15-Jun-15 22-Jun-15 29-Jun-15 6-Jul-15 13-Jul-15 20-Jul-15 27-Jul-15 3-Aug-15 10-Aug-15 17-Aug-15
31-May-15 7-Jun-15 14-Jun-15 21-Jun-15 28-Jun-15 5-Jul-15 12-Jul-15 19-Jul-15 26-Jul-15 2-Aug-15 9-Aug-15 16-Aug-15 22-Aug-15
I PEKERJAAN PERSIAPAN
100 %
1 Pek. Papan Nama Proyek m2 1.00 0.16 0.16
2 Pek.Rangka Atap Kayu Kls. II, 70% m2 93.80 5.89 1.18 1.18 1.18 1.18 1.18
3 Pek. Konstruksi Kuda-kuda, kayu kelas II, 55% m3 1.80 6.29 1.26 1.26 1.26 1.26 1.26
4 Pek. Konstruksi Gordeng, kayu kelas II, 60% m3 0.69 2.12 0.42 0.42 0.42 0.42 0.42 80 %
5 Pek. Papan Ruiter m1 10.16 0.24 0.24
9 Pek. talang 1/2 D-15 cm , seng plat BJLS 30 lebar 45 cm m1 12.66 0.91 0.91
Sub Jumlah 3 28.78 0.64 0.64 2.86 2.86 2.86 3.77 7.02 6.45 - - 1.68 - - 70 %
IV PEKERJAAN PLAFOND
2 Pek. Lantai Keramik Anti Slip Uk. 20 Cmx20Cm m2 4.62 0.36 0.36
5 Pas. Pintu Panel dan Jendela Type (PJ1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 1.00 3.33 1.11 1.11 1.11
6 Pas. Pintu Panel dan Jendela Type (PJ2) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 1.00 2.88 0.96 0.96 0.96
7 Pas. Pintu Panel dan Jendela Type (PJ3) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 1.00 1.69 0.56 0.56 0.56 40 %
8 Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 4.00 8.07 2.69 2.69 2.69
9 Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize + Asesoris Unit 1.00 1.58 0.53 0.53 0.53
10 Pas. Jendela Type (J1) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 2.00 4.79 1.60 1.60 1.60
11 Pas.Bouvenlight Type (BV1) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 2.00 1.59 0.53 0.53 0.53
12 Pas.Bouvenlight Type (BV2) Alumunium 4" Warna Black Annodize + Kaca 5mm+ Asesoris Unit 1.00 0.49 0.16 0.16 0.16
13 Pek. Batu Alam Templek Warna Kuning m2 23.10 3.65 1.82 1.82 30 %
Sub Jumlah 6 32.72 - - - - 1.53 11.25 8.14 8.14 1.82 1.82 - - -
1 Instalasi Air Bersih Pipa PVC 3/4"+ Acsessories m1 20.00 0.19 0.19
3 Pek.Pas. Kran tembok lokal, dia 1/2 " Bh 2.00 0.04 0.04
1 Pek. Mengikis atau Mengerok Permukaan Cat Tembok Lama m2 77.85 0.60 0.60
IX PEKERJAAN ELEKTRIKAL
A PROGRES RENCANA 100.00 0.99 0.99 2.86 2.86 4.39 15.02 24.98 27.41 8.24 5.55 4.27 1.77 0.67
B PROGRES RENCANA KOMULATIF - 0.99 1.98 4.84 7.70 12.10 27.12 52.09 79.50 87.74 93.29 97.56 99.33 100.00
C PROGRES REALISASI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
B PROGRES REALISASI KOMULATIF - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
D SELISIH #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KETERANGAN :
RENCANA
REALISASI
Di Periksa Oleh :
KONSULTAN PENGAWAS
PT. BINARTHAMA KHARISMA
Ismail, ST
Site Enginer
BACKUP VOLUME
No. Item Pekerjaan B atas p T L Volume Sat. Keterangan
II PEKERJAAN PONDASI
1 Pek. Plat Lantai Beton K-225, Tebal= 12 Cm 2.9 x 4.3 x 0.12 1.50 m3
10.1 x 0.3 x 0.12 0.36 m3
1.86 m1
134.00 m2
Panjang Kuda -
3 Pek. Konstruksi Kuda-kuda, kayu kelas II, 55% 3.575 / Cos 30 0.866 = 4.12817552
Kuda
4.128176 x 2 x 0.015 0.12 m3 K1 kuda-kuda
7.15 x 0.015 0.11 m3 K1 Balok Tarik
1.2 x 0.015 0.02 m3 K1 Balok Kunci
2.17 2 x 0.015 0.07 m3 K1 Balok Sokong
2.04 x 0.015 0.03 m3 K1 Tiang Kuda - Kuda
1.35 4 x 0.0096 0.05 m3 K1 Balok Gapit
0.40 m3
JUMLAH KUDA KUDA K1 3 1.19 m3
Panjang Kuda -
1.625 / Cos 30 0.866 = 1.876443418
Kuda
1.876443 x 2 x 0.015 0.06 m3 K2 kuda-kuda
3.25 x 0.015 0.05 m3 K2 Balok Tarik
1 x 0.015 0.02 m3 K1 Balok Kunci
0.6 2 x 0.015 0.02 m3 K2 Balok Sokong
0.95 x 0.015 0.01 m3 K2 Tiang Kuda - Kuda
0.15 m3
JUMLAH KUDA KUDA K2 1 0.15 m3
Panjang Kuda -
1.625 / Cos 30 0.866 = 1.876443418
Kuda
1.876443 x 1 x 0.015 0.03 m3 K2 kuda-kuda
1.625 x 0.015 0.02 m3 K2 Balok Tarik
1 x 0.015 0.02 m3 K1 Balok Kunci
0.6 1 x 0.015 0.01 m3 K2 Balok Sokong
0.95 x 0.015 0.01 m3 K2 Tiang Kuda - Kuda
0.09 m3
JUMLAH KUDA KUDA 1/2 K2 1 0.09 m3
Panjang Kuda -
1.5 / Cos 30 0.866 = 1.732101617
Kuda
1.732102 x 2 x 0.015 0.05 m3 K3 kuda-kuda
3 x 0.015 0.05 m3 K3 Balok Tarik
0.6 2 x 0.015 0.02 m3 K3 Balok Sokong
0.95 x 0.015 0.01 m3 K3 Tiang Kuda - Kuda
0.13 m3
JUMLAH KUDA KUDA K3 2 0.26 m3
Panjang Kuda -
1.5 / Cos 30 0.866 = 1.732101617
Kuda
1.732102 x 1 x 0.015 0.03 m3 K3 kuda-kuda
3 x 0.015 0.05 m3 K3 Balok Tarik
0.6 1 x 0.015 0.01 m3 K3 Balok Sokong
0.95 x 0.015 0.01 m3 K3 Tiang Kuda - Kuda
0.09 m3
JUMLAH KUDA KUDA 1/2 K3 1 0.09 m3
Panjang Kuda -
6.45 / Cos 30 0.866 = 7.448036952
Kuda
7.448037 x 1 x 0.015 0.11 m3 K1 kuda-kuda
5 x 0.015 0.08 m3 K1 Balok Tarik
2.17 2 x 0.015 0.07 m3 K1 Balok Sokong
2.04 x 0.015 0.03 m3 K1 Tiang Kuda - Kuda
1.35 2 x 0.0096 0.03 m3 K1 Balok Gapit
0.31 m3
JUMLAH KUDA KUDA JURAI K1 4 1.23 m3
Panjang Kuda -
3.7 / Cos 30 0.866 = 4.272517321
Kuda
4.272517 x 1 x 0.015 0.06 m3 K1 kuda-kuda
2.3 x 0.015 0.03 m3 K1 Balok Tarik
0.6 2 x 0.015 0.02 m3 K1 Balok Sokong
0.95 x 0.015 0.01 m3 K1 Tiang Kuda - Kuda
0.13 m3
JUMLAH KUDA KUDA JURAI K2 2 0.26 m3
JUMLAH TOTAL VOLUME KUDA KUDA 3.28 m3
4 Pek. Konstruksi Gordeng, kayu kelas II, 60% 1.95 x 0.0096 0.02 m3 Arah y Kanan k1
3.68 x 0.0096 0.04 m3
5.27 x 0.0096 0.05 m3
6.93 x 0.0096 0.07 m3
6 Pek. Penutup Atap Genteng Morando Sama Dengan Rangka Atap 134.00 m2
7 Pek. Bubungan Atap Genteng Morando / Cos 30 0.866
5.06 / 0.866 x 3 17.53 m1 Bubung Atap K1
1.5 / 0.866 x 1 1.73 m1
4.2 / 0.866 x 1 4.85 m1
2.3 / 0.866 x 2 5.31 m1 Bubung Atap K2
3.1 / 0.866 x 1 3.58 m1
2.1 / 0.866 x 2 4.85 m1 Bubung Atap K3
4.5 / 0.866 x 1 5.20 m1
43.05 m1
9 Pek. talang 1/2 D-15 cm , seng plat BJLS 30 lebar 45 cm Panjang Talang 3.54 / Cos 30 0.866 = 4.087759815 4.09 m1 belakang
IV PEKERJAAN PLAFOND
1 Pek.Bongkaran Plafond + Rangka 2 x 3.25 6.50 m2 Teras Depan
0.8 x 48 38.40 m2 Teras Selasar
3 x 3 9.00 m2 R. Tamu
3.8 x 6 22.80 m2 R. Rapat
4 x 3 12.00 m2 R. Kpl. UPTD
1 x 1.5 1.50 m2 R. Kpl. UPTD
2.9 x 2.85 8.27 m2 R. Staf
1.4 x 1.7 2.38 m2 WC 1
1.6 x 1.4 2.24 m2 WC 2
1.8 x 1.7 3.06 m2 Gudang
2.75 x 1.3 3.58 m2 Gudang
1 x 3.5 3.50 m2 Teras Belakang
113.22 m2
V PEKERJAAN LANTAI
1 Pek.Bongkaran Lantai 2 x 3.25 6.50 m2 Teras Depan
0.8 x 48 38.40 m2 Teras Selasar
3 x 3 9.00 m2 R. Tamu
3.8 x 6 22.80 m2 R. Rapat
4 x 3 12.00 m2 R. Kpl. UPTD
1 x 1.5 1.50 m2 R. Kpl. UPTD
2.9 x 2.85 8.27 m2 R. Staf
1.4 x 1.7 2.38 m2 WC 1
1.6 x 1.4 2.24 m2 WC 2
1.8 x 1.7 3.06 m2 Gudang
2.75 x 1.3 3.58 m2 Gudang
1 x 3.5 3.50 m2 Teras Belakang
113.22 m2
2 Pek. Lantai Keramik Anti Slip Uk. 20 Cmx20Cm 1.4 x 1.7 2.38 m2 WC 1
1.6 x 1.4 2.24 m2 WC 2
4.62 m2
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) ( Rp. )
A PEKERJAAN REHAB GEDUNG KANTOR UPTD PAMEUNGPEUK
I PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Proyek m2 1.00 300,822.00 300,822.00
2 Dokumentasi, Asbult Drawing dan Pelaporan Ls 1.00 700,000.00 700,000.00
Sub Jumlah 1 1,000,822.00
II PEKERJAAN PONDASI DAN BETON
1 Pek. Plat Lantai Beton K-225, Tebal= 12 Cm m3 1.86 5,081,681.00 9,451,926.66
2 Pek. Pondasi Telapak K-225 m3 0.41 5,452,331.00 2,251,812.70
3 Pek. Kolom Struktur 20/20 K-225 m3 0.64 4,887,740.00 3,128,153.60
Sub Jumlah 2 14,831,892.96
III PEKERJAAN ATAP
1 Pek.Bongkaran Atap m2 76.27 31,245.00 2,383,160.96
2 Pek.Rangka Atap Kayu Kls. II, 70% m2 93.80 116,877.00 10,963,199.59
3 Pek. Konstruksi Kuda-kuda, kayu kelas II, 55% m3 1.80 6,483,018.00 11,697,739.59
4 Pek. Konstruksi Gordeng, kayu kelas II, 60% m3 0.69 5,722,675.00 3,935,929.52
5 Pek. Papan Ruiter m1 10.16 44,122.00 448,279.52
6 Pek. Penutup Atap Genteng Morando m2 134.00 108,872.00 14,589,030.29
7 Pek. Bubungan Atap Genteng Morando m1 43.05 109,174.00 4,699,776.81
8 Pek. Pas. List plank 3/30 m1 41.00 76,326.00 3,129,366.00
9 Pek. talang 1/2 D-15 cm , seng plat BJLS 30 lebar 45 cm m1 12.66 133,711.00 1,692,231.59
Sub Jumlah 3 53,538,713.87
IV PEKERJAAN PLAFOND
1 Pek.Bongkaran Plafond + Rangka m2 113.22 5,803.00 657,015.66
2 Pek.Pas.Rangka Plafond Kayu Kls. II m2 113.22 127,495.00 14,434,983.90
3 Pas. Langit-langit Triplek 4mm m2 113.22 65,733.00 7,442,290.26
4 Pas. List Langit KayuProfil m1 123.52 21,975.00 2,714,242.13
Sub Jumlah 4 25,248,531.95
V PEKERJAAN LANTAI
1 Pek.Bongkaran Lantai Ls 1.00 735,930.00 735,930.00
2 Pek. Lantai Keramik Anti Slip Uk. 20 Cmx20Cm m2 4.62 143,861.00 664,637.82
4 Pek. Lantai Keramik Uk. 30Cm x 30 Cm m2 70.20 200,527.00 14,076,995.40
Sub Jumlah 5 15,477,563.22
VI PEKERJAAN DINDING, KUSEN, PINTU DAN JENDELA
1 Pek. Bongkaran Tembok 1/2 Bata m2 17.20 99,623.00 1,713,515.60
2 Pek. Pasangan 1/2 Bata m2 17.20 132,453.00 2,278,191.60
3 Pek. Pasangan Plesteran 1PC : 5 Ps t=1,5 Cm m2 47.40 61,573.00 2,918,560.20
4 Pek. Acian m2 47.40 36,312.00 1,721,188.80
Pas. Pintu Panel dan Jendela Type (PJ1) Kusen Alumunium 4" Warna Black
5 Unit 1.00 6,197,970.00 6,197,970.00
Annodize + Kaca 5mm+ Asesoris
Pas. Pintu Panel dan Jendela Type (PJ2) Kusen Alumunium 4" Warna Black
6 Unit 1.00 5,364,677.00 5,364,677.00
Annodize + Kaca 5mm+ Asesoris
Pas. Pintu Panel dan Jendela Type (PJ3) Kusen Alumunium 4" Warna Black
7 Unit 1.00 3,141,278.00 3,141,278.00
Annodize + Kaca 5mm+ Asesoris
Pas. Pintu Panel Type (P1) Kusen Alumunium 4" Warna Black Annodize +
8 Unit 4.00 3,754,546.00 15,018,184.00
Kaca 5mm+ Asesoris
Pas. Pintu Panel Type (P2) Kusen Alumunium 4" Warna Black Annodize +
9 Unit 1.00 2,946,737.00 2,946,737.00
Asesoris
Pas. Jendela Type (J1) Alumunium 4" Warna Black Annodize + Kaca 5mm+
10 Unit 2.00 4,454,447.00 8,908,894.00
Asesoris
..........................................
Direktur
REKAPITULASI
RENCANA ANGGARAN BIAYA HASIL NEGOSIASI
JUMLAH
NO URAIAN PEKERJAAN
( RP.)
..........................................
Direktur
DAFTAR HARGA SATUAN UPAH
Program : Peningkatan Sarana dan Prasarana Aparatur
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor
Pekerjaan : Rehabilitasi Gedung Kantor UPTD TPH Kecamatan Pameungpeuk
Lokasi Pekerjaan : Kantor UPTD TPH Kecamatan Pameungpeuk
Tahun Anggaran : 2015
1 Pekerja Oh 85,000.00
2 Tukang Batu Oh 95,590.00
3 Kepala Tukang Batu Oh 111,320.00
4 Tukang Kayu Oh 95,590.00
5 Kepala Tukang Kayu Oh 95,590.00
6 Tukang Besi Profil/ Tukang Las Oh 102,850.00
7 Kepala Tukang Besi Profil/ Tukang Las Oh 111,320.00
8 Tukang Besi Beton Oh 95,590.00
9 Kepala Tukang Besi beton Oh 111,320.00
10 Tukang Cat Oh 102,850.00
11 Kepala Tukang Cat Oh 111,320.00
12 Tukang Gali Oh 95,590.00
13 Kepala Tukang Gali Oh 111,320.00
14 Tukang Pipa Oh 95,590.00
15 Kepala Tukang Pipa Oh 111,320.00
16 Tukang Las Oh 95,590.00
17 Kepala Tukang Las Oh 95,590.00
16 Mandor Oh 111,320.00
..........................................
Direktur
Halaman : 74
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT. BAHAN + UPAH
Rp.
1 2 3 4
M. ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)
1 Memasang 1 m2 lantai keramik ukuran (30 x 30) cm M2 200,527.00
2 Memasang 1 m2 lantai keramik ukuran (20 x 20) cm M2 143,861.00
3 Memasang 1 m2 dinding keramik ukuran (20 x 20) cm M2 236,749.00
4 Memasang 1 m2 dinding keramik ukuran (20 x 25) cm M2 234,046.00
5 Memasang 1 m2 lantai keramik ukuran (40 x 40) cm M2 205,903.00
6 Memasang 1 m2 lantai keramik Granit ukuran (60 x 60) cm M2 336,803.00
7 Memasang 1 m2 lantai keramik Granit ukuran (25 x 60) cm M2 145,733.00
8 Memasang 1 m2 lantai keramik ukuran (25 x 40) cm M2 161,211.00
9 1 m2 Pasangan Paving Blok Natural 6 cm M2 175,211.00
10 1 m2 Pasangan Batu Tempel Hitam M2 293,897.00
11 1 m2 Pasang Lantai Papan M2 142,788.00
O. MEKANIKAL
1 Lampu LED 13 watt bh 110,900.00
2 Pemasangan Saklar Tunggal M2 22,000.00
3 Kotak Kontak M2 22,000.00
4 Instalasi Penerangan M1 198,900.00
5 Instalasi Kotak Kontak M1 231,100.00
6 Instalasi Saklar Tunggal M1 231,100.00
7 Instalasi Telephone M2 248,500.00
8 Pemasangan KWH meter 1 PH R. PANEL bh 1,320,300.00
9 Instalasi Telephone kg 248,500.00
10 Penyambungan Daya PLN Unit 954,500.00
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT. BAHAN + UPAH
Rp.
1 2 3 4
..........................................
Direktur
No Diameter Berat Besi No Diameter Berat Besi
mm Kg / m1 mm Kg / m1
1. PONDASI TELAPAK 70 x 70 X 20
1. KOLOM PEDESTAL 30 x 30
Begisting
Jumlah Jumlah Total
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Muka Volume Satuan
Pedestal volume
1 Begisting 1 m1 x 0.3 m2 x 4 1.2 15 18 m2
Begisting
Jumlah Jumlah Total
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Muka Volume Satuan
Pedestal volume
1 Begisting 6.3 m1 x 0.3 m2 x 4 7.56 12 90.72 m2
Begisting
Jumlah Jumlah Total
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Muka Volume Satuan
Pedestal volume
1 Begisting 4.2 m1 x 0.15 m2 x 4 2.52 17 42.84 m2
1. SLOOF BETON 15 x 25
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 50.4 m1 x 6.000 bh x 0.62 187.488 Kg
2 Sengkang Ф 8 mm - 0.65 m1 x 253 bh x 0.40 65.78 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 50.4 m1 x 0.25 m2 x 2 25.2 m2
1. SLOOF BETON 15 x 20
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 45.24 m1 x 4.000 bh x 0.62 112.1952 Kg
2 Sengkang Ф 8 mm - 0.55 m1 x 227.2 bh x 0.40 49.984 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 45.24 m1 x 0.2 m2 x 2 18.096 m2
1. RING BALK 15 x 20
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 85.24 m1 x 4.000 bh x 0.62 211.3952 Kg
2 Sengkang Ф 8 mm - 0.55 m1 x 427.2 bh x 0.40 93.984 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 85.24 m1 x 0.2 m2 x 2 34.096 m2
1. RING BALK 15 x 25
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 50.4 m1 x 6.000 bh x 0.62 187.488 Kg
2 Sengkang Ф 8 mm - 0.65 m1 x 253 bh x 0.40 65.78 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 50.4 m1 x 0.25 m2 x 2 25.2 m2
1. BALOK LINTEL 10 x 10
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 66.01 m1 x 4.000 bh x 0.62 163.7048 Kg
2 Sengkang Ф 8 mm - 0.25 m1 x 331.05 bh x 0.40 33.105 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 66.01 m1 x 0.1 m2 x 2 13.202 m2
1. TALANG BETON T 12 cm
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 8 mm 27.60 m1 x 4.000 bh x 0.40 44.16 Kg
0.6 m1 x 185 bh x 0.40 44.4 Kg
2 Tulangan Siku - 4 -Ф 8 mm 0.7 m1 x 24 bh x 0.40 6.72 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 27.6 m1 x 1.5 m2 1 41.4 m2
27.6 m1 x 0.25 m2 x 1 6.9 m2
siku - siku 0.45 m1 x 0.25 m2 x 8 0.9 m2
Jumlah
No Pemakaian Besi Panjang Besi SAT x Jumlah Besi SAT x Berat Besi Satuan
Berat Besi
1 Tulangan 4 -Ф 10 mm 28.60 m1 x 10.000 bh x 0.62 177.32 Kg
1.65 m1 x 191.666666667 bh x 0.62 196.075 Kg
Begisting
Jml
No Uraian Pekerjaan Panjang Begisting SAT x Lebar Begisting SAT x Jumlah Satuan
Volume
1 Begisting 28.6 m1 x 1.5 m2 1 42.9 m2
28.6 m1 x 0.12 m2 x 1 3.432 m2
No Diameter Berat Besi No Diameter Berat Besi
mm Kg / m1 mm Kg / m1
1. RING BALK 15 x 20
Tulangan 4 -Ф 10 mm Berat = 0.62 kg/m'
Sengkang Ф 6 mm - 20 Berat = 0.22 kg/m'
Pemakaian Besi
- Tulangan -Ф 10 mm = 33.33 x 4 x 0.62 = 82.667 Kg
- Sengkang Ф 6 mm - = 33.33 : 0.2 = 166.6667
= 168 x 0.72 x 0.22 = 26.558 Kg
Jumlah = 109.225 Kg
Begisting
- Begisting = 33.33 x 0.3 = 10.000 m2
2. Sloof Beton 15 x 25
Tulangan 4 -Ф 10 mm Berat = 0.62 kg/m'
Sengkang Ф 6 mm - 20 Berat = 0.22 kg/m'
Pemakaian Besi
- Tulangan -Ф 10 mm = 26.67 x 4 x 0.62 = 66.133 Kg
- Sengkang Ф 6 mm - = 26.67 : 0.20 = 133.3333
= 134 x 0.82 x 0.22 = 24.234 Kg
Jumlah = 90.367 Kg
Begisting
- Begisting = 26.67 x 0.3 = 8.000 m2
0.5
3 Pas. Balok Lintel 10/10, K- 10 x 10
Tulangan 4 -Ф 10 mm Berat = 0.40 kg/m'
Sengkang Ф 6 mm - 20 Berat = 0.22 kg/m'
Pemakaian Besi
- Tulangan -Ф 10 mm = 100 x 4 x 0.4 = 160.000 Kg
- Sengkang Ф 6 mm - = 100 : 0.20 = 500
= 501 x 0.42 x 0.22 = 46.292 Kg
Jumlah = 206.292 Kg
Begisting
- Begisting = 50 x 0.24 = 12.000 m2
4 Kolom Beton 15 x 15
Tulangan 4 -Ф 8 mm Berat = 0.40 kg/m'
Pemakaian Besi
- Tulangan -Ф 8 mm = 44.44 x 4 x 0.40 = 71.111 Kg
- Sengkang Ф 6 mm - = 44.44 : 0.21 = 210.5263
= 212 x 0.62 x 0.22 = 28.852 Kg
Jumlah = 99.963 Kg
Begisting
- Begisting = 44.44 x 0.3 = 13.333 m2
5 Kolom Beton 30 x 30
Tulangan 8 -Ф 13 mm Berat = 1.04 kg/m'
Pemakaian Besi
- Tulangan -Ф 13 mm = 11.11 x 8 x 1.04 = 92.444 Kg
- Sengkang Ф 6 mm - = 11.11 : 0.20 = 55.55556
= 56.56 x 1.22 x 0.22 = 15.180 Kg
Jumlah = 107.624 Kg
Begisting
- Begisting = 11.11 x 0.6 = 6.667 m2
Pemakaian Besi
- Tulangan -Ф 10 mm = 8 x 16.24 x 0.395 = 51.318 Kg
- Sengkang 0 = 57 x 2.24 x 0.395 50.434
=
Jumlah = 101.752 Kg
Begisting
- Begisting = 8.333 x 1 = 8.333 m2
6 Pondasi Telapak T = 20 cm
Tulangan -Ф 10 mm Berat = 0.40 kg/m'
Pemakaian Besi
- Tulangan -Ф 10 mm = 8 x 16.24 x 0.395 = 51.318 Kg
- Sengkang 0 = 57 x 2.24 x 0.395 50.434
=
Jumlah = 101.752 Kg
Begisting
- Begisting = 8.333 x 1 = 8.333 m2
6 Kolom Pedestal 30 x 30
Tulangan -Ф 10 mm Berat = 0.40 kg/m'
Pemakaian Besi
- Tulangan -Ф 10 mm = 8 x 16.24 x 0.395 = 51.318 Kg
- Sengkang 0 = 57 x 2.24 x 0.395 50.434
=
Jumlah = 101.752 Kg
Begisting
- Begisting = 8.333 x 1 = 8.333 m2
DAFTAR HARGA BETON
Program : Peningkatan Sarana dan Prasarana Aparatur
Kegiatan : Rehabilitasi Sedang/Berat Gedung Kantor
Pekerjaan : Rehabilitasi Gedung Kantor UPTD TPH Kecamatan Pameungpeuk
Lokasi Pekerjaan : Kantor UPTD TPH Kecamatan Pameungpeuk
Tahun Anggaran : 2015
..........................................
Garut, ................................. 2015
CV./PT.......................................
..........................................
Direktur
1. KUSEN
I PEKERJAAN PERSIAPAN
1 Mobilisasi bahan 1.00 ls 500,000.00 500,000.00
2 Pembersihan lokasi 1.00 ls 500,000.00 500,000.00
3 Bongkaran 1.00 ls 1,000,000.00 1,000,000.00
Jumlah 2,000,000.00
II PEKERJAAN UTAMA
2.1 PEKERJAAN LANTAI PAPAN
1 Lantai Papan Ruang Sekretariat 16.00 m2 142,788.00 2,284,608.00
2 Lantai Papan Ruang Pertemuan 44.00 m2 142,788.00 6,282,672.00
3 Lantai Papan Ruang Balkon 16.20 m2 142,788.00 2,313,165.60
Jumlah 10,880,445.60
2.1 PEKERJAAN DINDING BILIK
1 Dinding Bilik Corak 28.00 m2 234,483.00 6,565,524.00
2 Dinding Bilik Biasa 31.00 m2 183,049.00 5,674,519.00
3 Pemasangan Bambu 13.65 m2 82,137.00 1,121,170.05
3 Penambahan Tiang 0.22 m3 5,722,675.00 1,256,699.43
Jumlah 14,617,912.48
2.3 PEKERJAAN BETON
1 Pas. Plat Beton Tempat KomporTb. 10 cm K-175 0.16 m3 1,656,363.00 265,018.08
Jumlah 265,018.08
2.4 PEKERJAAN DINDING DAN PLESTERAN Dapur
1 Pas. Dinding bata 1:5 6.00 m2 132,453.00 794,718.00
2 Pas. Plesteran 1:5 + acian 12.00 m2 61,573.00 738,876.00
3 Pas. Dinding bata 1:5 Tempat Kompor 1.60 m2 132,453.00 211,924.80
Jumlah 1,533,594.00
2.5 PEKERJAAN KUSEN
1 Pas. Kusen Pintu Kayu Kelas 2 0.05 m3 7,378,886.00 354,186.53
2 Pas. Daun Pintu Kayu Kelas 2 1.60 m2 629,215.00 1,006,744.00
Jumlah 1,360,930.53
2.6 PEKERJAAN PLAFOND
1 Pas. Rangka Langit-langit 68.00 m2 127,495.00 8,669,660.00
2
2 Pas. Penutup Langit-langit Bilik Bambu 68.00 m 52,992.00 3,603,456.00
3 List Langit2 Kayu 48.00 m' 21,975.00 1,054,800.00
Jumlah 13,327,916.00
2.7 PEKERJAAN KRAMIK
1 Pas. Lantai Kramik Tempat Kompor. Uk. 20x20 cm 3.20 m2 143,861.00 460,355.20
Jumlah 460,355.20
2.8 PEKERJAAN GANTUNGAN
1 Pas. Kunci Tanam Biasa 1.00 bh 200,832.00 200,832.00
2 Pas. Engsel Pintu 2.00 bh 28,192.00 56,384.00
3 Pas. Engsel Jendela 4.00 bh 25,317.00 101,268.00
4 Pas. Kait Angin Jendela 2.00 bh 28,067.00 56,134.00
5 Pas. Sllot Pintu dan Jendela 3.00 bh 7,000.00 21,000.00
Jumlah 435,618.00
2.9 PEKERJAAN PENGECATAN
1 Pas. Plamir Tembok 21.00 m2 11,474.00 240,954.00
2 Pas. Pengecatan Dinding 21.00 m2 15,376.00 322,896.00
3 Pas. Pengecatan Plafond Bilik 68.00 m2 15,376.00 1,045,568.00
4 Pas. Mendempul Kayu 1.65 m2 27,342.00 45,059.62
5 Pas. Pengecatan Kayu 1.65 m2 13,386.00 22,060.13
6 Pas. Dinding Bilik Corak 28.00 m2 65,006.00 1,820,168.00
7 Pas. Dinding Bilik Biasa 31.00 m2 65,006.00 2,015,186.00
8 Pas. Bambu 13.65 m2 65,006.00 887,331.90
Jumlah 6,399,223.64
2.10 PEKERJAAN ATAP
1 Pas. Kontsruksi Kuda-kuda Kayu Kelas 2 3.40 m3 6,483,018.00 22,042,261.20
2 Pas. Rangka Atap Genteng 61.48 m2 101,433.00 6,236,386.98
2
3 Pas. Penutup Atap Genteng 61.48 m 70,482.00 4,333,432.19
4 Pas. Genteng Bubungan 18.00 m1 109,174.00 1,965,132.00
5 Pas. Papan Listplang 29.00 m1 76,326.00 2,213,454.00
Jumlah II 36,790,666.37
Jumlah Total 86,071,679.90
REKAPITULASI
Menyetujui
Kepala Dinas Perumahan Tata Ruang Dan Cipta Karya Kabupaten
Garut
I PEKERJAAN PERSIAPAN
1 Mobilisasi bahan 1.00 ls 250,000.00 250,000.00
2 Pembuatan Papan Proyek 1.00 ls 150,000.00 150,000.00
3 Pembersihan lokasi 1.00 ls 235,000.00 235,000.00
4 Administrasi dan perijinan 1.00 ls 350,000.00 350,000.00
5 Bongkaran tembok bata 1.00 ls 1,500,000.00 1,500,000.00
Jumlah 2,485,000.00
II PEKERJAAN TANAH
1 Galian tanah pondasi batu kali 11.04 m3 73,187.00 807,984.48
2 Galian tanah pondasi telapak 36.00 m3 89,661.00 3,227,796.00
3 Pek. Urugan Tanah Kembali 21.68 m3 24,396.00 528,905.28
3
4 Urugan pasir bawah Pondasi 1.80 m 293,275.00 527,895.00
5 Pek. Urugan tanah dipadatkan 27.38 m3 52,873.00 1,447,398.38
Jumlah 6,539,979.14
III PEKERJAAN PONDASI
1 Pas. Aanstamping 1.55 m3 512,362.00 795,442.01
3
2 Pas. Pondasi Batu kali 1 : 5 5.43 m 865,219.00 4,701,383.74
3 Pas. Pondasi Telapak K-225 4.88 m3 5,452,331.00 26,580,113.63
4 Pas. Kolom Pedestral 25/25, K-225 3.75 m3 4,887,740.00 18,329,025.00
Jumlah 50,405,964.37
IV PEKERJAAN BETON
1 Pas. Sloof Beton 15/20, K-175 4.34 m3 3,876,964.00 16,841,531.62
3
2 Pas. Balok Lintel 12/12, K-175 1.04 m 7,996,479.00 8,336,809.15
3 Pas. Kolom Struktur 25/25, K-225 8.64 m3 4,887,740.00 42,230,073.60
4 Pas. Ring Balk 15/20, K-175 6.75 m3 4,493,448.00 30,314,597.59
Jumlah 97,723,011.95
V PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata 1:5 217.20 m2 132,453.00 28,768,791.60
2 Pas. Plesteran 1:5 + acian 217.20 m2 61,573.00
Jumlah 28,768,791.60
VI PEKERJAAN ATAP DAN KUDA- KUDA
1 Pas. Kuda-kuda Rangka Baja Ringan 231.68 m2 200,000.00 46,336,000.00
Jumlah 46,336,000.00
REKAPITULASI
Jumlah 232,258,747.06
PPN 10% 23,225,874.71
Pajak Daerah Bahan Mineral bukan logam dan batuan 1,523,682.27
Jumlah 257,008,304.03
DIBULATKAN 257,008,000.00