Emily-1 Project Fuel Terminal and Jetty Compaction Inspection Report
Emily-1 Project Fuel Terminal and Jetty Compaction Inspection Report
PTD-GEN-TPT9750-BPN-30007-FORM
EMILY-1 PROJECT FUEL TERMINAL AND JETTY
client( Rev. A
subcon(
)logo Date
)logo COMPACTION INSPECTION REPORT Page. of
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0003
REFERENCES :
EQUIPMENT
Total Unit : 1 pc(s)
M Saoki
QC Inspector Date Date Date
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0003
REFERENCES :
Dewatering
COMMENT
Muhammad Saoki
Doc. no. PTD-GEN-TPT9750-BPN-3003-FORM
Job No : 9750
Main Contractor : PT. TRIPATRA Engineers & Constructors Report No. : 9750-QC-MRR-BCI-0004
REFERENCES :
Item Name : Elevation Top Subgrade Location : Control Room & MCC Building
Coordinate Elevation
No. DESCRIPTION Difference Remarks
Plan Actual Difference Plan Actual
mm
E = East
N = North
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki
QC Inspector
EMILY-1 PROJECT FUEL TERMINAL & Doc No. PTD-GEN-TPT9750-BPN-30007-FORM
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki
QC Inspector
EMILY-1 PROJECT FUEL TERMINAL & Doc No. PTD-GEN-TPT9750-BPN-30007-FORM
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki
QC Inspector
EMILY-1 PROJECT FUEL TERMINAL & Doc No. PTD-GEN-TPT9750-BPN-30007-FORM
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki
QC Inspector
EMILY-1 PROJECT FUEL TERMINAL & Doc No. PTD-GEN-TPT9750-BPN-30007-FORM
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki
QC Inspector
EMILY-1 PROJECT FUEL TERMINAL & Doc No. PTD-GEN-TPT9750-BPN-30007-FORM
JETTY Rev.
DYNAMIC CONE PENETROMETER TEST Date
( ASTM D 6951 ) Page
Remarks:
Minimum Requirement CBR ≥ 5 %
Acceptance:
Allow contractor to implement proceeding construction works ok Not ok
Muhammad Saoki