Royal Commission For Jubail and Yanbu 021-C19: Document No: Rev. I C - 0 3 3 0 - F - 1 0 2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

ENGINEER’S STICKER: CONTRACTOR’S STICKER:

A Issued for Approval MJ MJ AR 6.11.18


‫تنقيح‬ ‫سبب اإلصدار‬ ‫راجعهاا‬ ‫وافق‬ ‫التاريخ‬
‫بواسطة‬
REV. ISSUED FOR
PREPARED BY
CHECKED ‫عليها‬APPROVE DATE
D
Client: CUSTOMER:

ROYAL COMMISSION FOR JUBAIL AND YANBU


CONTRACT NO:
021-C19
Contractor:

CHINA GEO.ENGINEERING CORPORATION


(SAUDI) BRANCH

Subcontractor:
PROJECT TITLE:
DPS & MMPS FOR SITE DEVELOPMENT OF
UTILITIES FOR BUFFER ZONE

DOCUMENT TITLE:

Voltage Elements Industrial


CO. SAT PROCEDURE (Instruments, Switch Rack)

DOCUMENT NO : Sheet Rev.


I C - 0 3 3 0 - F - 1 0 2 1 of 12 A
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 2 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

TABLE OF CONTENTS

1. INTRODUCTION 3

2. ABBREVIATIONS 4
3. SCOPE 5

4. HARDWARE PHYSCIAL CHECK 6


5. FUNCTIONALLITY CHECK 8

6. CONSOLIDATED FAT POINTS (PUNCH LIST SUMMARY) 11

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 3 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

1. INTRODUCTION

This document provides description for Site Acceptance Test (FAT) to be carried out for
the Instruments and Switch Rack for Lift Stations.

The objective of SAT is to demonstrate the equipment is configured and operating as


per client requirements.

ABB level transmitter, pressure transmitters, level switcher and Flow meter are used in
this project.

The test shall involve Switch rack and instruments functionality tests. All the transmitters
and Switch rack shall be tested as per attached procedure.

Following are the reference documents for SAT:

Switch Rack Drawings


Instrument Data sheet and manuals

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 4 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

2. ABBREVIATIONS

PLC Programmable Logic Controller

CPU Central Processing Unit

DO Digital Output

AI Analog Input

PS Power Supply

mA Milli Ampere

I/O Input / Output

ET Expansion Terminal

TB Terminal Block

Add Address

IP Class Ingress Protection Class

LED Light Emitting Diode

ES Engineering Station

OS Operator Station

PG Programming Device

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 5 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

3. SCOPE

The scope of this SAT test is to verify all the instruments and switch rack
are up to the client requirements and shall be grouped into following
phase

1. Switch Rack and Instruments Physical Check


2. Functionality Check

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 6 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

4. HARDWARE PHYSCIAL CHECK

CHECK
SN DESCRIPTION REMARKS
PASS FAIL

1 Check Overall dimensions of the switch rack are


as per the requirement/drawings.
2
Completeness of assembly and finishing
3 Layout arrangement of breaks and instruments
controller are proper.
4 Ratting of breaker and measuring instruments as
required.
5
Busbar size and cable size as required.
6
Screw/bolts & nuts joints are adequate contact
7
Proper crimping of terminal lugs and ferrule.
8
Clearance and creepage distance.
9 Effectiveness of door lock, draw out and shutter
mechanism.
10
Proper protective panel earthing.
11
Proper relay, breaker and terminals installed.
12
Proper cable interconnection and termination.
Verify Level transmitters and installed properly
13
with in suitable location as the transmitters are
not fouling with any materials inside the tank.
Verify the pressure transmitters are installed
14 properly with proper accessories like gasket and
flushing rings (if required)

Remarks (If any):

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 7 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

CLIENT : MARAFIQ

ENGINEER NAME / SIGNATURE __________________________

CLIENT : ROYAL COMMISSION

ENGINEER NAME / SIGNATURE __________________________

CONTRACTOR : CGC

ENGINEER NAME / SIGNATURE __________________________

SUB-CONTRACTOR : VEICO

ENGINEER NAME / SIGNATURE __________________________

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 8 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

Functionality CHECK

In order to perform functionality as precaution, please ensure the following


• Power source is turned on.
• All pump protection beakers are on
• No system trip available
• Level controllers are configured with proper Low, LowLow, High and High
High set points.

Start filling the tank with water from zero level and check the following.

CHECK
SN DESCRIPTION REMARKS
PASS FAIL

1 Make sure level sensors are sensing properly and


displaying proper level readings.
2 Check level controllers are reading health value
identical to its level sensors.
Check both the discharge pressure transmitters
3
are reading zero value when the pump is not
running.
Check the relay R1 of the relay control panel is
4
ON when the water in the tank is less than
LowLow level.
Check the Relay R2 of the relay control panel
5
turns ON the water in tank raises above low
level.
6 Check the duty pump starts running when the
relay R2 of the relay control panel turs ON.
7 Check the discharge pressure transmitter shows
healthy value when the pump runs.
8 Check the duty pump go OFF with the tank level
LowLow is attained.
Check the second duty pump starts running
9 when the relay R3 of the relay control panel
turns ON, and the water level raises above High
level in Auto mode.
Check the relay R4 of the relay control panel is
10
turns ON and check the beacon lamp turn on
with the level of the tank go above HighHigh

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 9 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

SN DESCRIPTION CHECK REMARKS

level.
Stop filling the tank and turn on the power
11 supply of the pumps, the pump shall start run
and check the beacon lamp go off when the level
of the tank go below high high level.
Once the level reach Low level and R2 is on only
12 one duty pump should be running, so check the
duty selector to chose which pump need to be
run on Auto mode.
Check the ODOR removal system Functionality
13
and the ODER Blower is running Auto once the
pumps run, and off once the pumps off.
14 Check the flow water reading coming from the
flow meter (if required)
15
Check the pin stock Functionality
16
Check the Jib crane Functionality

Remarks (If any):

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 10 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

CLIENT : MARAFIQ

ENGINEER NAME / SIGNATURE __________________________

CLIENT : ROYAL COMMISSION

ENGINEER NAME / SIGNATURE __________________________

CONTRACTOR : CGC

ENGINEER NAME / SIGNATURE __________________________

SUB-CONTRACTOR : VEICO

ENGINEER NAME / SIGNATURE __________________________

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 11 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

5. CONSOLIDATED FAT POINTS (PUNCH LIST SUMMARY)

Sl. No. Description Remarks / Comments


1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.
CLIENT : MARAFIQ

ENGINEER NAME / SIGNATURE __________________________

CLIENT : ROYAL COMMISSION

ENGINEER NAME / SIGNATURE __________________________

CONTRACTOR : CGC

ENGINEER NAME / SIGNATURE __________________________

SUB-CONTRACTOR : VEICO

ENGINEER NAME / SIGNATURE __________________________

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH
SITE DEVELOPMENT OF UTILITIES FOR BUFFER ZONE Page: 12 of 12

Subject: SAT PROCEDURE (Instruments, Switch Rack) PO NO. CGC-(021-C19)-PO


Revision

First Rev. A Document Number


Index

Issue Date: 6.11.18 IC-0330-F-102

ACCEPTANCE CERTIFICATE

We, the undersigned, hereby declare that upon SAT is tests specified in this SAT Document,
and the proper disposition of all properly documented witnessed discrepancies, resulting from
tests specified in this procedure, the system tested & witnessed is functionally acceptable and
ready for the installation at site.

CLIENT : MARAFIQ

ENGINEER NAME / SIGNATURE __________________________

CLIENT : ROYAL COMMISSION

ENGINEER NAME / SIGNATURE __________________________

CONTRACTOR : CGC

ENGINEER NAME / SIGNATURE __________________________

SUB-CONTRACTOR : VEICO

ENGINEER NAME / SIGNATURE __________________________

Contractor/Client Sub Contractor


CHINA GEO.ENGINEERING CORPORATION (SAUDI)
VEICO Ltd.
BRANCH