Shic A 0008
Shic A 0008
Shic A 0008
01 23-Feb-22
LOCATION
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP.
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A REMARKS
No.
A General
Schedule "Q"
All quality test and sampling shall be performed by independent Approved
A1 Attachment I Section
laboratory facilities and testing Agency.
3.1
The Geotechnical Contractor shall comply with all aspects of the Saudi
A3 Aramco Construction Safety Manual and all safety programs and policies of SACSM
Saudi Aramco.
Inspect penetrometer tip before and after soundings for damage, soil ingress
and wear. Upon complete withdrawal of the penetrometer, inspect the
A4 ASTM D5778
penetrometer tip for proper operation. Friction sleeve should be able to be
rotated through 360 degrees by hand without detectable binding.
Attachment IV to
A5 All equipments/gauges shall have valid Calibration Certificates.
Schedule Q
To ensure the stability of the CPT equipment and trafficability, the top ASTM D-5778/
B1 surface of soil shall be leveled with a maximum acceptable slope of 5 %after Method Statement,
each phase of RIC/DC Section 9
For all cone penetration calibration, testing and data reporting, ASTM D5778
B4 ASTM D-5778
shall be followed.
Page 1 of 3
(Standards Cutoff - 30 Jun 2020) Rev. 01 23-Feb-22
When the graph of post-Cone Penetration Test reports show failure in any of
Method Statement,
B5 the test points conducted in a grid box, Saudi Aramco shall be notified of
Sec.12
such failure.
Page 2 of 3
(Standards Cutoff - 30 Jun 2020) Rev. 01 23-Feb-22
Test failure shall be investigated and area shall be recompacted using again Method Statement,
B6
RIC/DC Compaction, and re-testing shall be performed. Sec.12
REMARKS:
REFERENCE DOCUMENTS:
1 - Method Statement RIC/DC
3 - ASTM D-420, ASTM D-5778
Page 3 of 3