Method of Statement Lighting System
Method of Statement Lighting System
PE-104
PE-104-NBTC-PE-T-0606 11 Apr 20 PE-104-PE-NBTC-T-1731 31-Mar-20 3 58-99-97-7871 ITP for Installation of Lighting System 2
DISCIPLINE: ELECTRICAL
2.
3.
4.
5.
6.
7.
8.
Page 1 of 1
Code - 1
Praveen Kumar
18/04/2020
HOLDS
1. SCOPE.............................................................................................................................. 4
2. REFERENCES .................................................................................................................. 4
3. DEFINITIONS.................................................................................................................... 4
4. ATTACHMENTS ............................................................................................................... 9
This Inspection and Test Plan is applied to sub-contractor activities related to Installation of Lighting
system, Inspection and testing activities as per project specification & relevant codes and standard.
2. REFERENCES
3. DEFINITIONS
This document and referenced ITR’s shall be applied to Construction/Inspection & test activities carried out on
Qusahwira Phase-II Project sites.
This document is based on widely used international codes, standards and good engineering practice that is
applied in oil & Gas projects and is intended to highlight the minimum tests and inspections that ensure quality
requirements are fulfilled within the scope of the document.
In case of any conflict between documents, the project specification shall take precedence over this QCP and applicable
ITR’s.
This ITP serves primarily as a plan and it shall not be used to obtain signatures. Acceptance signatures shall be
obtained on the referenced inspection and test record, which shall form part of generic records to be handed
over to the client.
Company signature is optional for review and surveillance points.
The referenced inspection and test records (ITR’s) are controlled independently. Therefore, the latest revision
of these ITRs, at the time of initiation, shall be utilized.
Inspection Codes: SC: Sub-Contractor PE: Petrofac Emirates C : Company/Client TP: Third Party
R: Document/Report Review S: Surveillance RR: Random Review
H: Hold Point (Notification required & presence is mandatory) W: Witness Point (Notification required but presence is not mandatory)
PE Electrical QC
a. Review & verify validity of
Inspector
Control of Inspection calibration certificates, Identification Manufacturer’s data sheet Good mechanical and Calibration
PEC Site
1.0 Test & Measuring Number/Sticker 58-99-90-7987 electrical condition Certificate/ IM&TE H H S N/A
Supervisor
Equipment b. Verify condition of the test Project Spec. Valid calibration certificate Register
SC Electrical QC
equipment
Inspector
a. Visual inspection to ensure no PE Electrical QC
Purchase Order No damage and materials
Material Inspection physical damages, all materials are Inspector
Delivery Note are correct as per Purchase Order
(subject to provisions of in accordance with project SC Material
2.0 Data Sheet requirement Delivery Note H H W N/A
Project Material requirements Controller
Project Material Receiving Confirms to storage and Data Sheet, MTC
Receiving Procedures) b. Storage and preservation (e.g. long SC Electrical QC
Procedure, MTC preservation requirements
term outdoor storage at site) Inspector
a. Review of applicable
PE Electrical
drawings/documents and ensure Complies with AFC
List of latest revision of QC Inspector
Drawings and that latest revision is available at document register
applicable drawings PEC Site
3.0 Documents status site (e.g.: Location layout, SLD, Complies with AFC NIL H R R N/A
AFC drawings and Supervisor
Review of work procedures, Method drawings, applicable
Specifications SC Electrical
Statements, QC Procedures and standards and Specifications
QC Inspector
other related documents etc.)
PE Electrical
a. Check against applicable data QC Inspector
Lighting Fixture rating Installation details and
sheet/drawings Complies with installation PEC Site ITR-E-0801A
4.0 and specification Layout drawings H W W N/A
b. Where applicable, verify hazardous Project Spec. details and layout drawing Supervisor
checks
area classification and IP rating SC Electrical
QC Inspector
Page 6 of 9
EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE-II NASER M. AL-BADDAH &
ADNOC
PROJECT PARTNER GEN. CONT. CO.
ONSHORE LLC
PROJECT / ORDER NO : P14395 ITP NO: 58-99-97-7871
Inspection and Test Plan
CONTRACTOR JOB NO: 16559.01 Installation of Lighting System DATE: 08-Apr-2020 REV: 3
Inspection Codes: SC: Sub-Contractor PE: Petrofac Emirates C : Company/Client TP: Third Party
R: Document/Report Review S: Surveillance RR: Random Review
H: Hold Point (Notification required & presence is mandatory) W: Witness Point (Notification required but presence is not mandatory)
Page 7 of 9
EPC FOR QUSAHWIRA FIELD DEVELOPMENT PHASE-II NASER M. AL-BADDAH &
ADNOC
PROJECT PARTNER GEN. CONT. CO.
ONSHORE LLC
PROJECT / ORDER NO : P14395 ITP NO: 58-99-97-7871
Inspection and Test Plan
CONTRACTOR JOB NO: 16559.01 Installation of Lighting System DATE: 08-Apr-2020 REV: 3
Inspection Codes: SC: Sub-Contractor PE: Petrofac Emirates C : Company/Client TP: Third Party
R: Document/Report Review S: Surveillance RR: Random Review
H: Hold Point (Notification required & presence is mandatory) W: Witness Point (Notification required but presence is not mandatory)
PE Electrical
QC Inspector
Installation details and
Circuit list and labels a. Verify labels against applicable Correct labels as per PEC Site ITR-E-0801A
9.0 Layout drawings H W S N/A
installed drawings drawings Supervisor
Project Spec.
SC Electrical
QC Inspector
Inspection Codes: SC: Sub-Contractor PE: Petrofac Emirates C : Company/Client TP: Third Party
R: Document/Report Review S: Surveillance RR: Random Review
H: Hold Point (Notification required & presence is mandatory) W: Witness Point (Notification required but presence is not mandatory)
4. ATTACHMENTS
Page 9 of 9
INSPECTION & TEST RECORD-ELECTRICAL
ITR No: E-0801A
SHELTER / BUILDING, HIGH-MAST &
COLUMN MOUNTED LIGHTING CIRCUIT
INSTALLATION AND TEST RECORD
E-0801A
Project No.: Record No:
Tag No:
Location: Sub-System No:
DB No: Circuit No. Lighting Type:
Light Fixture Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Jn. Boxes Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Lighting Layout Drawing No: Dist. Drawing/Schedule No:
Haz. Area Classification Drawing No: Haz.Area Class:
A GENERAL REQUIREMENTS
5 All fittings solidly and correctly mounted and not obstructed by other services.
8 All name plates / warning labels are correct and securely attached, readable and not obscured.
All fittings, lamps and junction boxes undamaged, clean and all spare entries blanked off with
9
correct plugs.
Verify cable termination and glanding at each junction box and lighting fitting to ensure
10
compliance with drawing/specification.
Verify earth connections/bonding are in accordance with standard drawing and record
11
resistance to earth: ( Ω).
Insulation resistance and continuity test of complete Phase – Neutral: MΩ
circuit: (Ensure to disconnect lighting fixtures during Neutral-Earth: MΩ
12 IR test.) Phase – Earth: MΩ
E-0801A
Project No.: Record No:
Tag No:
Location: Sub-System No:
DB No: Circuit No. Lighting Type:
Light Fixture Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Jn. Boxes Ex. Protection Type: Gas Group: Temp. Class: IP Rating:
Lighting Layout Drawing No: Dist. Drawing/Schedule No:
Haz. Area Classification Drawing No: Haz.Area Class:
IR& Continuity test/termination of internal cables prior to lifting the pole (MΩ)
Pole. No: 1 2 3 4 5 6 7 8 9 10
P-N
6 P-E
N-E
Continuity
Termination
Test Equipment Type Make Model Sl. No. Cal Due Date
Remarks:
E-1401A
Project No.: Record No:
Bulk Tag No:
Sub-System No:
Service: Location:
Name
Signature
Date
Rev.3 Page 1 of 1 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-d”, “Ex-e” & “Ex-n”
Installations E-1401A: Table-1
Exn
Sl. No: Exe
“x” Required,” #” Recommended, “+” By Commissioning 1 2 3 4 5 6 7 8 9 10
A. Equipment
Equipment is appropriate to the EPL/Zone requirements of
A1 x x x
the location
A2 Equipment group is correct x x x
A3 Equipment temperature class is correct x x x
A4 Equipment maximum surface temperature is correct
Degree of protection (IP grade) of equipment is appropriate
A5 x x x
for the level of protection/group conductivity
A6 Equipment circuit identification is correct x x x
A7 Equipment circuit identification is available x x x
Enclosure glass parts and glass-to-metal sealing gaskets
A8 x x x
and/or compounds are satisfactory
A9 There are no damage or unauthorized modifications x x x
A10 There is no evidence of unauthorized modifications x x x
Bolts, cable entry devices (direct and indirect) and blanking
A11 elements are of the correct type and complete and tight x x x
(Physical and visual checks)
Threaded covers on enclosures are of the correct type, are
A12 x
tight and secured (Physical and visual checks)
Joint surfaces are clean and undamaged and gaskets, if any,
A13 x
are satisfactory and positioned correctly
A14 Condition of enclosure gasket is satisfactory x x x
There is no evidence of ingress of water or dust in the
A15 x x x
enclosure in accordance with the IP rating
Name
Signature
Date
Rev.3 Page 1 of 3 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-d”, “Ex-e” & “Ex-n”
Installations E-1401A: Table-1
Exd
Exn
Exe
Sl. No:
“x” Required,” #” Recommended, “+” By Commissioning 1 2 3 4 5 6 7 8 9 10
Name
Signature
Date
Rev.3 Page 2 of 3 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-d”, “Ex-e” & “Ex-n”
Installations E-1401A: Table-1
Exd
Exn
Exe
Sl. No. “x” Required,” #” Recommended, “+” By Commissioning 1 2 3 4 5 6 7 8 9 10
Name
Signature
Date
Rev.3 Page 3 of 3 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-i” Installations
E-1401A: Table-2
Area: Location:
A. Equipment
Circuit and/or Equipment documentation is appropriate to the
A1 x
EPL/Zone requirements of the location
A2 Equipment installed is that specified in the documentation x
A3 Circuit and/or Equipment category and group are correct x
A4 IP rating of equipment is appropriate to the Group III material present x
A5 Equipment temperature class is correct x
Ambient temperature range of the apparatus is correct for the
A6 x
installation
Service temperature range of the apparatus is correct for the
A7 x
installation
A8 Installation is clearly labeled x
Enclosure glass parts and glass-to-metal sealing gaskets and/or
A9 x
compounds are satisfactory
Cable glands and blanking elements are the correct type, complete
A10 x
and tight (Physical and visual checks)
A11 There are no damage or unauthorized modifications x
A12 There is no evidence of unauthorized modifications x
Diode safety barriers, galvanic isolators, relays and other energy
A13 limiting devices are of the approved type, installed in accordance with x
the certification requirements and securely earthed where required
Name
Signature
Date
Rev.3 Page 1 of 2 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-i” Installations
E-1401A: Table-2
Exi
Checks to be performed Result (Yes, No, NA)
Sl. No:
“x” Required,” #” Recommended, “+” By Commissioning 1 2 3 4 5 6 7 8 9 10
Name
Signature
Date
Rev.3 Page 2 of 2 Ref. ITP No. 58-99-97-7871
HAE Inspection Check List for “Ex-p” Installations
E-1401A: Table-3
Project No.: Record No:
Attachment to ITR No. E-1401A
Sub-System No:
Area: Location:
Exp
Sl. No:
“x” Required,” #” Recommended, “+” By Commissioning 1 2 3 4 5 6 7 8 9 10
A. Equipment
Equipment is appropriate to the EPL/Zone requirements of the
A1 x
location
A2 Equipment group is correct x
Equipment temperature class is correct
A3 x
or surface temperature is correct
A4 Equipment circuit identification is correct x
A5 Equipment circuit identification is available x
Enclosure glass parts and glass-to-metal sealing gaskets and/or
A6 x
compounds are satisfactory
A7 There are no damage or unauthorized modifications x
A8 There is no evidence of unauthorized modifications x
A9 Lamp type, rating and position are correct x
B. Installation
B1 Type of cable is appropriate x
B2 There is no obvious damage to cables x
Earthing connections including any supplementary earth bonding
B3 connections are satisfactory (e.g. connections are tight, and x
conductors are of sufficient cross section)- Physical and visual checks
Name
Signature
Date
Exp
Sl. No: Checks to be performed
1 2 3 4 5 6 7 8 9 10
Name
Signature
Date