ENGINEER’S STICKER: CONTRACTOR’S STICKER:

A FOR APPROVAL JMM PBG DAP 11-02-2019


‫تنقيح‬ ‫سبب اإلصدار‬ ‫بواسطة‬ ‫راجعها‬ ‫وافق عليها‬ ‫التاريخ‬
REV. ISSUED FOR PREPARED CHECKED APPROVED DATE

‫المملكة العربيـــة الســـــعوديــــة‬


KINGDOM OF SAUDI ARABIA
‫المؤسسة الـعـامـــة لتحليــة الميـــاه المالحـــــة‬
SALINE WATER CONVERSION CORPORATION (SWCC)
‫ المرحلة الثالثة‬- ‫نـظـام نـقـل ميـاه الجـبيل للمنطقة الشرقية‬
‫رقم المشروع‬
PROJECT NO
20SWCG00041
JUBAIL TO EASTERN PROVINCE WATER TRANSMISSION
SYSTEM PHASE-III

‫المهندس‬ Fichtner Engineering and Consulting


ENGINEER
Al-Rashid Trading & Contracting Co.
‫المقـــاول‬
CONTRACTOR
13.8/0.4 KV DISTRIBUTION TRANSFORMER

DOCUMENT NO: Sheet Rev.


- - - - - - - - - - - - - 1 of 3 A

‫المقاول بالباطن‬ ECO Limited Arabia contracting Comp.


SUBCONTRACTOR
AL-JUBAIL SWRO DESALINATION PLANT PHASE 2

Subject: PRE-COMMISSIONING ITP FOR ELECTRICAL EQUIPMENT OF Page No.:


SWRO PLANT 2 of 6
Doc.No.: 19SWCG30204-1-200-R00ZAA-KT0-IT-800100 Rev. 001

REVISION INDEX

001 APPROVED FOR CONSTRUCTION (COMPLY WITH CRS_02) 29-Aug-2022


000 ISSUED FOR CONSTRUCTION (COMPLY WITH CRS_01) 21-Sep-2021
00A ISSUED FOR APPROVAL 26-Aug-2021
Rev Description of Changes/Revision Date
AL-JUBAIL SWRO DESALINATION PLANT PHASE 2

Subject: PRE-COMMISSIONING ITP FOR ELECTRICAL EQUIPMENT OF Page No.:


SWRO PLANT 3 of 6
Doc. No.: 19SWCG30204-1-200-R00ZAA-KT0-IT-800100 Rev. 001

INSPECTION AND TEST PLAN FOR ELECTRICAL EQUIPMENT TESTING AND


PRE-COMMISSIONING
Sr.
ITP Description Page
No
ITP FOR 13.8/0.4 KV DISTRIBUTION TRANSFORMER
1 1-2
PRECOMMISSIONING TEST
Document ID No: 3741.04
Saline Water Conversion Corporation
Page: 1 of 2

Rev. No.: 3.0


QA/QC Inspections: Inspection Test Plan Template
Date of Issue: August 2019

Consultant:

Company:

Project name: AL-JUBAIL SWRO DESALINATION PLANT PHASE 2

Project Code: 19SWCG30204

ITP no: 19SWCG30204-1-200-R00ZAA-KT0-IT-800100

Rev No: Vendor Fabrication Shop Site Construction

Date: Rev 001

Type of ITP Site Construction

Item Description Pre-Commissioning ITP for Electrical Equipment of SWRO Plant

Manufacturer Voltech Manufacturing Company Ltd.


Inspection by
sub
Activity Inspectio Acceptance Specification/ Technical
Activity Activity/ Inspection Frequency Record Sub- Consu. Remark
Number n/ Test criteria drawings documents Con
Sepco3
ltant
SWCC
Number

1. 13.8/0.4 KV DISTRIBUTION TRANSFORMER PRECOMMISSIONING TEST


DOCUMENT REVIEW
Approved final revision Document Documents IFC Drawings / Before the work starts Project Requirements / Approved
1 1.1 Shop drawings H R R R
from Contractor Review Project and revisions if required Concept Drawings Document

Documents Project Before the work starts Approved Procedure / Project Project Approved
1.2 Approval of Method Statement H R R R
Review Specifications and revisions if required Specs Specifications Document

PRECOMMISSIONING TEST

Physical inspection test as per Visual Factory test Factory test report/ Rated
2 2.1 Each item Vendor manual Test report H W W R
approved drawing inspection report name plate data/ MOS
Name plate details checks as per Visual Factory test Factory test report/ Rated
2.2 Each item Vendor manual Test report H W W R
approved drawing inspection report name plate data/ MOS
Visual Factory test Factory test report/ Rated
2.3 Oil Leakage Test Each item Vendor manual Test report H W W R
inspection report name plate data/ MOS
Factory test report/ Rated
2.4 Winding Insulation Resistance test Test IEC 76-1 Each item Vendor manual Test report H W W R
name plate data/ MOS
Factory test report/ Rated
2.5 Polarization Index Test IEC 76-1 Each item Vendor manual Test report H W W R
name plate data/ MOS
IEC 76-1 Factory test report/ Rated
2.6 Winding Resistance Test (all taps) Test Each item Vendor manual Test report H W W R
Clause 10.2 name plate data/ MOS
Factory test report/ Rated
2.7 Turn Ratio Test Test IEC 60076 Each item Vendor manual Test report H W W R
name plate data/ MOS
Factory test report/ Rated
2.8 Current Transformer Test Test IEC 76-1 Each item Vendor manual Test report H W W R
name plate data/ MOS
Power Factor Factory test report/ Rated
2.9 Test IEC 76-1 Each item Vendor manual Test report H W W R
(Tan-Delta, HV side only) name plate data/ MOS
Factory test report/ Rated
2.10 Dielectric (BDV Testing) Test IEC 76-1 Each item Vendor manual Test report H W W R
name plate data/ MOS
Factory test report/ Rated
2.11 Mechanical Protection Relay Test Test IEC 76-1 Each item Vendor manual Test report H W W R
name plate data/ MOS
Scheme Checks/ Loop checks (to Factory test report/ Rated
2.12 Test IEC 76-1 Each item Vendor manual Test report H W W R
be carried with Switchgear testing) name plate data/ MOS
Factory test report/ Rated
2.13 OTI and WI Calibration Test - Each item Vendor manual Test report H W W R
name plate data/ MOS

FINAL ACCEPTANCE
Test equipment manual / Project
Factory test
3 3.1 Final acceptance of work done Test Result 100% Approved Manufacturer final Specifications RFI H W R R
report/ MOS
revision Drawings /Standards

Page 2 of 2