Saudi Aramco Pre-Commissioning Form: Instrument and Control Cables
Saudi Aramco Pre-Commissioning Form: Instrument and Control Cables
Saudi Aramco Pre-Commissioning Form: Instrument and Control Cables
Insulation
PAIR/ CORE TO CORE TO CORE SHIELD Resistance
CABLE TAG NO. CORE TO CORE RESULT VALUE RESULT
TRIAD SHIELD) ARMOR (MΩ) CONTINUITY CONTINUITY Between OS &
ARMOR (MΩ)
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and
deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
APPROVALS
Signature & Date Md Mutiur Rehman Mr. RALLA NOVIE Mr. WASIM ANWER
FORM # J-015 (6/17)
MEGGERING
Insulation
PAIR/ CORE TO CORE TO CORE SHIELD Resistance
CABLE TAG NO. CORE TO CORE RESULT VALUE RESULT
TRIAD SHIELD) ARMOR (MΩ) CONTINUITY CONTINUITY Between OS &
ARMOR (MΩ)
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and
deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.
APPROVALS
Signature & Date MD ZAHID RAFIQUE Mr. RALLA NOVIE Mr. WASIM ANWER