4 REFERENCE DOCUMENTS
5 RESPONSIBILITIES
5.1 General
a. The QA/QC Department shall develop and revise “Site Inspection and Testing Procedure”, the
various ITPs and Inspection & Test Records (ITRs), and be responsible for supervising, monitoring,
03 directing the execution of site inspection and testing activities. The QA/QC department shall also
Page 6 of 24