RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

SITE INSPECTION AND TESTING PROCEDURE


Doc No: 9686-6150-PR-000-0029 Rev. 03 Doc. Class 1 /Cat: 2

4 REFERENCE DOCUMENTS

ISO 9001:2015 : Quality Management Systems-Requirements


5440-8820-SP-000-0014 : Sub-Phase 1.1, EPC Package 1.1.1 - Summary Scope of Work
5440-8820-SP-000-0015 : Sub-Phase 1.1, EPC Package 1.1.2 - Summary Scope of Work
9686-6150-PR-000-0001 : Project Quality Plan
9686-6110-PR-000-0002 : Project Execution Plan

03 9686-8820-PR-000-9002 : Engineering Execution Plan


9686-6130-PR-000-0003 : Construction and Fabrication Execution Plan
9686-8130-PR-000-0002 : Commissioning and Start-Up Plan
9686-6150-PR-000-0011 : Procedure for Punch List Management
9686-8130-SP-000-0001 Specification for Commissioning Management System
9686-6130-PR-000-0021 : Mechanical Completion procedure
9686-6110-IF-000-0001 : Interface management plan
9686-8820-PR-000-9001 : Design Deviation Concession Request Authorization (DCA)
Procedure
9686-6180-PR-000-0001 : Document Numbering Procedure
9686-6150-PR-000-0003 : Internal & External Audit Procedure
9686-6150-PR-000-0004 : Procedure of Nonconforming Product Control
9686-6150-PR-000-0005 : Corrective and Preventive Action Control Procedure
9686-6150-PR-000-0006 : Material Identification and Traceability Procedure
9686-6150-PR-000-0007 Procedures for Control of Inspection, Measuring and Test
:
Equipment
9686-6150-SH-000-0001 : Project Audit Schedule
9686-8470-SP-000-4004 : Specification for Positive Material Identification
9686-8230-SP-000-5012 : Specification for Colour Coding and Marking
9686-6120-PR-000-0003 : Shop Inspection & Testing Procedure
9686-6120-PR-000-0005 : Material Handling and Storage Procedure

5 RESPONSIBILITIES

5.1 General

a. The QA/QC Department shall develop and revise “Site Inspection and Testing Procedure”, the
various ITPs and Inspection & Test Records (ITRs), and be responsible for supervising, monitoring,
03 directing the execution of site inspection and testing activities. The QA/QC department shall also