Concrete Cube Test Report Submission: CPRC Maldives Pte. LTD
Concrete Cube Test Report Submission: CPRC Maldives Pte. LTD
LTD
Project: RAH FALHU HURAA MALDIVES, RESORT ISLAND 3
Project No.: RFHISL3
CONCRETE CUBE TEST REPORT SUBMISSION
Transmitted For:
Method of Transmission:
Hand Mail Email Courier X Upload via Procore
Details of Testing
Test Method: : BS 1881
Location : 1BLV05
No of Samples : 3