Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Software Engineering MCQ

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

By OnlineInterviewQuestions.

com
Software Engineering MCQ Quiz

Take Software Engineering Quiz To test your Knowledge


We have listed below the best Software Engineering MCQ Questions that check your basic knowledge of
Software Engineering. This Software Engineering Test contains the 25 best Software Engineering MCQ.
You have to select the right answer to every question. You can also download the Software Engineering MCQ
PDF from the given link below.

Also, Read the Best Software Engineering Interview Questions.

Q1. “Software engineers shall -

A. act consistently with the public interest.”


B. act in a manner that is in the best interests of his expertise and favour.”
C. ensure that their products only meet the SRS.” d) all of the mentioned
D. all of the mentioned

Q2. “Software engineers should not use their technical skills to misuse other people’s
computers.”Here the term misuse refers to:

A. Unauthorized modification of computer material


B. Unauthorized access to computer material
C. Dissemination of viruses or other malware
D. All of the above

Q3. What is a Software ?

A. Software is documentation and configuration of data


B. Software is set of programs
C. Software is set of programs, documentation & configuration of data
D. None of the mentioned

Q4. Which of these software engineering activities are not a part of software processes ?
A. Software development
B. Software dependence
C. Software validation
D. Software specification

Q5. The fundamental notions of software engineering does not account for ?

A. Software Security
B. Software reuse
C. Software processes
D. Software Validation

Q6. Which one of the following models is not suitable for accommodating any change?

A. Prototyping Model
B. RAD Model
C. Build & Fix Model
D. Waterfall Model

Q7. SDLC stands for

A. System Development Life cycle


B. Software Design Life Cycle
C. Software Development Life Cycle
D. System Design Life Cycle

Q8. The spiral model was originally proposed by -

A. Barry Boehm
B. Pressman
C. Royce
D. Pressman

Q9. If you were to create client/server applications, which model would you go for?

A. Concurrent Model
B. Spiral Model
C. WINWIN Spiral Model
D. Incremental Model

Q10. Infrastructure software are covered under ?

A. Customised Products
B. Generic and Customised Products
C. Generic Products
D. None of the above

Q11. Build and Fix model has?

A. 1 Phases
B. 2 Phases
C. 3 Phases
D. 4 Phases

Q12. White box testing, a software testing technique is sometimes called ?

A. Graph Testing
B. Basic path
C. Glass box testing
D. Dataflow

Q13. Structured programming codes includes ?

A. alteration & iteration


B. multiple exit from loops
C. sequencing
D. only 1 and 3

Q14. The document listing all procedures and regulations that generally govern an
organization is the ?

A. Organizing manual
B. Personal poling bank
C. Administration policy manual
D. Procedure log
Q15. Which one of the following is NOT desired in a good Software Requirement
Specifications (SRS) document?

A. Non-Functional Requirements
B. Goals of Implementation
C. Functional Requirements
D. Algorithms for Software Implementation

Q16. COCOMO stands for ______ .

A. constructive cost Model


B. common control Model
C. composition cost Model
D. consumed cost Model

Q17. What is the most common measure for correctness?

A. Errors per KLOC


B. Defects per KLOC
C. $ per KLOC
D. Pages of documentation per KLOC

Q18. Line of code(LOC) of the product comes under which type of measures?

A. Direct measures
B. Coding
C. Indirect measures
D. None of the above

Q19. Line of code(LOC) of the product comes under which type of measures?

A. Direct measures
B. Coding
C. Indirect measures
D. None of the above

Q20. How many numbers of maturity levels in CMM are available?


A. 6
B. 5
C. 4
D. 3

Q21. Which of the following is the task of project indicators:

A. track potential risk


B. help in assessment of status of ongoing project.
C. both 1 and 2
D. none of the mentioned

Q22. Which of the following is not a direct measure of SE process?

A. Effort Applied
B. Efficiency
C. Effort Applied
D. All of the mentioned

Q23. In size oriented metrics, metrics are developed based on the ___

A. number of user inputs


B. number of lines of code
C. number of Functions
D. amount of memory usage

Q24. Usability can be measured in terms of:

A. Time required to become moderately efficient in system usage


B. Net increase in productivity
C. Intellectual skill to learn the system
D. All of the mentioned

Q25. What are attributes of good software?

A. Software functionality
B. Software maintainability
C. Software development
D. Both Software functionality & maintainability

Please Visit OnlineInterviewquestions.com to download more pdfs

You might also like