FYP 2 Project Closure Form

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Project Closure Form

(Two pages, please print both pages)

TAYLOR’S UNIVERSITY

SCHOOL OF ENGINEERING

PROJECT TITLE:

SUPERVISOR’S NAME:

PART NAME DATE OF CHECKED BY DATE


RETURN

Lab housekeeping:

1. Cleanliness

All rubbish and used parts have been disposed from bench tops and floors, machines (blades,
cutting jigs, etc) cleaned and returned to original state

Yes No

2. Properties

All lab equipment, books, catalogues, etc borrowed by students have been returned

Yes No

Prepared by Dr Siow Chun Lim Version 4 (March 2015)


Taylor’s University
3. Safety

All safety measures has been taken, i.e. no liquid spills, machines turned off, power switched off,
sharp objects removed / covered to avoid injury, liquid bottles sealed and kept in designated
storage area, no obstructing items that can cause trips / falls, etc.

Yes No

Checked by

LAB MANAGER:………………………………………………………………

DATE:…………………………

4. CD

CD containing the softcopy of your thesis and all tests results, raw data, graphs, tables

etc. for the supervisor.

Yes No

Verified by

SUPERVISOR:……………………………………………….

DATE:………………………….

Prepared by Dr Siow Chun Lim Version 4 (March 2015)


Taylor’s University