Agreement: Wosen Melese General Contractor G+3 Three Bed Rooms Typology BUILDING Construction

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

Agreement

THIS AGREEMENT made the __10th_ day of January , 2018 between THADISO HOUSING
COOPRATION (hereinafter “the Employer”), of the one part, and WOSEN MELESE GENERAL
CONTRACTOR (hereinafter “the Contractor”), of the other part:
Whereas the Employer is desirous that the Contractor execute G+3 THREE BED ROOMS TYPOLOGY
BUILDING Construction (hereinafter called “the Works”) and the Employer has accepted the Bid by the
Contractor for the execution and completion of such Works and the remedying of any defects therein for the
Contract Price of the equivalent of Ethiopian Birr 13,143,933.09 without VAT or 15,115,523.06 (Fifteen
million One hundred Fifteen Thousand Five Hundred Twenty Three Birr and Zero Six Cents) including
VAT.
NOW THIS AGREEMENT WITNESS AS FOLLOWS:

1. In this Agreement, words and expressions shall have the same meanings as are respectively assigned to
them in the Contract referred to.
2. In consideration of the payments to be made by the Employer to the Contractor as hereinafter mentioned, the
Contractor hereby covenants with the Employer to execute and complete the Works and remedy any defects
therein in conformity in all respects with the provisions of the Contract.
3. The Employer hereby covenants to pay the Contractor in consideration of the execution and completion
of the Works and the remedying of defects therein the Contract Price or such other sum as may become
payable under the provisions of the Contract at the times and in the manner prescribed by the Contract.
4 The Contract Price or such other sum as may be payable shall be paid in Ethiopian Birr.
IN WITNESS whereof the parties thereto have caused this Agreement to be executed in accordance with the law
specified in the Special Conditions of Contract on the day, month and year indicated above.

Signed by ___________________________ (for the Employer)


Name:______________________________ Position:__________________________
Signed by ___________________________ (for the Contractor)
Name:______________________________ Position:___________________________

Witnesses
1. -------------------
2. -------------------
3._____________

January 2018 1
January 2018 2
CONSTRACTION AGREEMENT

This agreement made


b/n p.o box
Tele (her in after the employer) of the one part
And p.o box Tele
(here in after the contraction whose p.o box
Whose register office at of the other part
Whereas the employers is desirous to having constructed completed and maintained As

Maintained in the documents enumerated and referred to in clause 2 hear(hear in after called the work)
Whereas the contractor has agreed to under tack the construction works as per the terms and conditions of
the contract documents enumerated in clause 2 below.

NOW THE DOR PROVISONS


A) in the agreement work and expression have the same meaning is are respectively assigned to them in the
condition of contract referred in causes 2 below.
B)for the consideration her in after mentioned the contract will upon and subject to condition her to an next
to execute and completely the work shown up the side drawing and described or after to the side bill of
quantities specification and the side conditions.

CONTRACT DOCUMENT
It is agreed understood that the following document
A) The construction agreement and appendices there to
B) The standard instruction bidders for budding construction work is used by bat coda January 1998
C) The practical project incrimination
D) Signed tender proposal of contractor and appendices
E) Technical specification and methods of measurement
F) Signed priced bill of quantities and
G) Standard condition of contract for constriction of civil works project December 1994 quantities and
H) standard condition of contract for constriction or civil worker project December 1994 shall be known as
the contractor document and are present that agreement b/n the employer and the contract and that there is
no other agreement of any other document relating to or in any way affecting this stage and this document
supersede all the other agreement and drawing prior to data here of ,

January 2018 3
3. Agreement
In consideration of the payment to be made by the employed the contract here by covenants will the
employer to execute and complete the works and defects there conforming in all respects will the provisions
of the contract and the employer here by convents to pay the contractor in consideration of the execution
and completion of the work s and he remedying of defects in there the total contract price. Birr

And in the manner prescribed by the contract document


4. CONTRACT ADEMINRTION
The Duly delegated by
The employer shall be responsible for interpreting and administering the contract I accordance with the
agreement as here under.
5. STSTUS CONTRACT
It is agreed and understands that the said contract documents shall be interpreted acieration to Ethiopian
low.
6. LANGUE OF CONTRACT
This language of the contract is the English language
7. COMING INTO FORCE
This contract shall come in to force when the contractor submit the performance bond.
Un wasteness where PF the parties have caused respective common seals to be here on to affixed on the day
and year first above written

For the employer for contractor

Authorized signature Authorized signature


Name witness signature
1.
2.
3.

January 2018 4
January 2018 5