Bedessa Interim Payment 01
Bedessa Interim Payment 01
Bedessa Interim Payment 01
01
Amount (Birr)
Project : Bedessa Chat Terminal Market Center Main Contract 4,972,321.20
Client : Oromia Marketing Development Agency Supplementary Contract -
Consultant : Engineering Corporation of Oromia Variation orders -
Prime Contractor-1 : Oromia Construction Corporation
Prime Contractor-2 : Anwar Seid General Contractor Others -
Sub Contractor : EHAT Construction PLC
Total sum 4,972,321.20
As per the attached measurement the value of work executed and/or materials supplied to date is :- 917,883.51
137,682.53
With Vat (15%) 1,055,566.04
Amount ( Birr)
Cert. No. Date Including
VAT Deductions Amount (Birr)
adv 300,000
1- Previous Payment -
2- Penalty -
4- Retention 5%
5- Others -
Total 150,000.00
Net Sum due to the Contractor 905,566.04
Amount of Advance
Taken Birr 300,000
Amount of Advance
refund to-date Birr 150,000
Remaining Advance 150,000 We certify that the contractor is now entitled to the sum of :- 905,566.04
Nine Hundered Five Thousand Five Hundred Sixty Six and 04/100 Birr only
_____________________ ____________________
Prepared by Approved by
(Sub Contractor) (Prime Contractor)
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
ConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsultaConsulta
Consultant : Engineering Corporation of Oromia
BEDESA CHAT TERMINAL CENTER
Project : Bedessa Chat Terminal Market Center Block Name G+1 Shade 3
A. SUB STRUCTURE
B. SUPER STRUCTURE
Previous
This Period Previous Executed This Period Executed To Date Executed
Item no Description Unit Contract Qty Executed Rate Contract Amount
Qty
Executed Qty Amount Amount Amount
A. SUB STRUCTURE
1. EXCAVATION & EARTHWORKS
Trench excavation in ordinary soil to a depth of 1000mm from reduced
1.30 m³ 680.00 - 147.20 90.0 61,200.00 - 13,248.00 13,248.00
ground level.
Pit excavation in ordinary soil to a depth not exceeding 1500mm from
1.40 m3 1,327.20 - 20.00 100.0 132,720.00 - 2,000.00 2,000.00
reduced ground level.
Fill under hard core, around foundation and buildings with imported
1.60 selected material from quarry waste well rolled and compacted in layers M3 4,546.39 - 5,321.87 115.0 522,834.85 - 612,015.05 612,015.05
not exceeding 200 mm thick.
250mm thick sound basaltic ir equivalent stone hard-core finished and
1.80 m² 1,500.00 - 35.0 52,500.00 - - -
blinded with crushed stone.
Provide, cut and fix in position wooden or metal formwork that should
be strong enough to resist the pressure of fresh concrete and painted with
2.30 - - -
approved type of mould oil before any placement of concrete is carried
out.
Previous
This Period Previous Executed This Period Executed To Date Executed
Item no Description Unit Contract Qty Executed Rate Contract Amount
Qty
Executed Qty Amount Amount Amount
3. MASONRY WORKS
Hard basaltic or equivalent stone masonry wall foundation below and
3.10 M3 340.00 - - 300.0 102,000.00
above NGL under grad beam bedded in cement sand mortar (1:3)
Total carried to summary 102,000.00 - - -
Sub Structure (A) 2,376,466.26 - 917,883.51 917,883.51
BILL OF QUANTITY
Previous
This Period Previous Executed This Period Executed To Date Executed
Item no Description Unit Contract Qty Executed Rate Contract Amount
Qty
Executed Qty Amount Amount Amount
B. SUPER STRUCTURE
1. CONCRETE WORKS
Reinforced concrete class C-25,with minimum cement content of
1.10 360kg/m3 filled into form work and vibrated around steel reinforcement.
Steel and form work measured separately.
a) elevation columns M3 131.60 600.0 78,960.00
b) Intermidate beam M3 52.50 600.0 31,500.00
c) floor beam M3 62.13 450.0 27,956.25
d)In 15cm thick Floor slab M2 1,500.00 500.0 750,000.00
e) stair case & landing M3 10.00 500.0 5,000.00
f) Top tie beam M3 53.25 600.0 31,950.00
Provide, cut and fix in position wooden or metal that should be strong
1.20 enough to resist the pressure of fresh concrete and painted with approved
type of mould oil before any placement of concrete is carried out.
Previous
This Period Previous Executed This Period Executed To Date Executed
Item no Description Unit Contract Qty Executed Rate Contract Amount
Qty
Executed Qty Amount Amount Amount
2. Block Work
F2 16 2.7 10 1 10 27.0
(2.2*2.2*0.4) 16 2.7 10 1 10 27.0
F3 16 2.9 8 2 16 46.4
(2.4*1.6*0.4) 16 2.1 11 2 22 46.2
F4 16 2.9 8 1 8 23.2
(2.4*1.7*0.4)
REBAR ON 16 2.2 11 1 11 24.2
FOOTING
PADS
F5 16 3.3 9 1 9 29.7
(2.8*1.7*0.4) 16 2.2 14 1 14 30.8
F6 16 2.1 8 1 8 16.8
(1.6*1.6*0.4) 16 2.1 8 1 8 16.8
F7 16 3.1 8 2 16 49.6
(2.6*1.6*0.4) 16 2.1 12 2 24 50.4
F8 16 3.2 9 3 27 86.4
(2.7*1.7*0.4) 16 2.2 13 3 39 85.8
C1
(40*40cm)
16 4.91 8 74 592 2,907
C1
Striups
8 1.52 28 74 2,072 3,149
C2
(40*40cm)
16 4.91 12 8 96 471
Foundation C2
columns Striups
8 1.52 28 8 224 340
C3
(40*40cm)
16 4.91 10 1 10 49
C3
Striups
8 1.52 28 1 28 43