Phases of Agile Model
Phases of Agile Model
Phases of Agile Model
2. Design the requirements: When you have identified the project, work with
stakeholders to define requirements. You can use the user flow diagram or the
high-level UML diagram to show the work of new features and show how it
will apply to your existing system.
4. Testing: In this phase, the Quality Assurance team examines the product's
performance and looks for the bug.
5. Deployment: In this phase, the team issues a product for the user's work
environment.
6. Feedback: After releasing the product, the last step is feedback. In this, the
team receives feedback about the product and works through the feedback.
o Scrum Master: The scrum can set up the master team, arrange the
meeting and remove obstacles for the process
o Product owner: The product owner makes the product backlog,
prioritizes the delay and is responsible for the distribution of
functionality on each repetition.
o Scrum Team: The team manages its work and organizes the work to
complete the sprint or cycle.
eXtreme Programming(XP)
This type of methodology is used when customers are constantly changing
demands or requirements, or when they are not sure about the system's
performance.
Crystal:
There are three concepts of this method-
1. Time Boxing
2. MoSCoW Rules
3. Prototyping
1. Pre-project
2. Feasibility Study
3. Business Study
4. Functional Model Iteration
5. Design and build Iteration
6. Implementation
7. Post-project
1. Eliminating Waste
2. Amplifying learning
3. Defer commitment (deciding as late as possible)
4. Early delivery
5. Empowering the team
6. Building Integrity
7. Optimize the whole
When to use the Agile Model?
o When frequent changes are required.
o When a highly qualified and experienced team is available.
o When a customer is ready to have a meeting with a software team all
the time.
o When project size is small.