Objective Question Bank For Practice Subject - Control System Target Group-Electronics Engineering Final Year Sixth Semester
Objective Question Bank For Practice Subject - Control System Target Group-Electronics Engineering Final Year Sixth Semester
Objective Question Bank For Practice Subject - Control System Target Group-Electronics Engineering Final Year Sixth Semester
1) Which terminology deals ANSWER: (b) Automatic 9) The output signal is fed
with the excitation or electric iron back at the input side from
stimulus applied to the the _________point
system from an external 5) How is an output a. Summing
source for the generation of represented in the control b. Differential
an output? systems? c. Take-off
a. Input signal a. r(t) d. All of the above
b. Output signal b. c(t) ANSWER: (c) Take-off
c. Error signal c. x(t)
d. Feedback signal d. y(t) 10) In a parallel
ANSWER: (a) Input signal ANSWER: (b) c(t) combination, the direction of
flow of signals through
2) Which among the 6) The output is said to be blocks in parallel must
following is not an advantage zero state response because resemble to the main _______
of an open loop system? ______conditions are made a. Forward
a. Simplicity in construction equal to zero. b. Feedback
& design a. Initial c. Opposite
b. Easy maintenance b. Final d. Diagonal
c. Rare problems of stability c. Steady state ANSWER: (a) Forward
d. Requirement of system d. Impulse response
recalibration from time to ANSWER: (a) Initial 11) While shifting a take-off
time 7) Basically, poles of transfer point after the summing
ANSWER: (d) Requirement of function are the laplace point, which among the
system recalibration from transform variable values following should be added?
time to time which causes the transfer a. Summing point in series
function to become ___________ with take-off point
3) Which notation a. Zero b. Summing point in parallel
represents the feedback path b. Unity with take-off point
in closed loop system c. Infinite c. Block of reciprocal transfer
representation? d. Average value function
a. b(t) ANSWER:(c) Infinite d. Block of inverse transfer
b. c(t) function
c. e(t) 8) By equating the ANSWER: (a) Summing point
d. r(t) denominator of transfer in series with take-off point
ANSWER: (a) b(t) function to zero, which
among the following will be 12) Consider the assertions
4) Which among the obtained? related to block diagram.
following represents an a. Poles Which among them
illustration of closed loop b. Zeros represents the precise
system? c. Both a and b condition?
a. Automatic washing d. None of the above A. Block diagram is used for
machine ANSWER: (a) Poles analysis & design of control
b. Automatic electric iron system.
c. Bread toaster B. Block diagram also
d. Electric hand drier provides the information
OBJECTIVE QUESTION BANK FOR PRACTICE
SUBJECT – CONTROL SYSTEM
TARGET GROUP-ELECTRONICS ENGINEERING FINAL YEAR SIXTH SEMESTER