VETTING REPORT
NAME OF PROJECT: PLOT- 13, TYPE SB, SECTOR-Z, SUB
SECTOR – II, GULSHAN-E-MAYMAR,
SCHEME NO - 45, KARACHI.
DATE:
1
Sindh Building Control Authority (SBCA)
When a work of vetting/ proof checking is awarded to any proof structure section of SBCA shall hand over
following documents to Vetting Engineer.
On receipt of above documents from structure section, vetting engineer shall thoroughly proof check the
design and drawings or make individual calculations wherever required. The vetting engineers should also
ensure the compatibility of structural drawings with approved architectural concept plan. In case vetting
engineer observe any discrepancy in design & drawing provided by the original designer. He should inform
in writing to original design for rectification along with a copy to structure section.
On compilation of job vetting consultants is required to submit vetting report on prescribed format. This
report will summarized the approached adopted and certify it by stamping and signing the final structural
drawing as VETTED drawings for submission in SBCA. By certifying and signing the vetting report and
vetted drawing and design the vetting engineer would assure equal responsibility with original design
engineer for the adequacy of structural design as required by code.
The following documents are required to be submitted along with vetting report in SBCA by vetting
Engineer.
Six sets of Structural Drawings dully Vetted and Signed by all Professionals and Owner of the Project.
Two sets of Structural Calculations dully Vetted and Signed by Structural Engineer and Proof Engineer.
Two sets of Soil Investigation Report with verified copy of Soil certificate.
4. Two copies of Vetting Report on the prescribe format dully signed and stamped by the proof Engineer
and structural Engineer.
5. Verified copy of the approved concept architecture plan provided by the SBCA.
2
SECTION – 1
OWNER/PLOT INFORMATION
3
SECTION – 2
ARCHITECTURAL INFORMATION
c) Type of Occupancy OK
COMMERCIAL
4
SECTION – 3
STRUCTURAL DESIGNER’S INFORMATION
5
SECTION – 4
DESIGN DATA AND PARAMETERS
UBC-97 OK
6
Parameter/Details to be Filled To be Filled by Remarks By
By Original Structural Designer Original Structural Designer Proof Engineer
-------------------------------------------
-------------------------------------------
-------------------------------------------
7
Parameter/Details to be Filled To be Filled by Remarks By
By Original Structural Designer Original Structural Designer Proof Engineer
8
Parameter/Details to be Filled By To be Filled by Remarks By
Original Structural Designer Original Structural Designer Proof Engineer
9
Parameter/Details to be Filled By To be Filled by Remarks By
Original Structural Designer Original Structural Designer Proof Engineer
g) Frame Geometry
i) Beams Span to Column Height Ratio
Max. And Min.0.4
10
Parameter/Details to be Filled By To be Filled by Remarks By
Original Structural Designer Original Structural Designer Proof Engineer
11
Parameter/Details to be Filled By To be Filled by Remarks By
Original Structural Designer Original Structural Designer Proof Engineer
12
Parameter/Details to be Filled By To be Filled by Remarks By
Original Structural Designer Original Structural Designer Proof Engineer
13
SECTION – 5
PROOF ENGINEER’S VETTING PROCEDURE
REF.
Fulfilled all SBCA Structural
SECTION – 4
Requirements. Yes
□ No, If No Explain (Brief Summary)
14
ARE ALL COMMENTS AND
PROOF
DRAWING RECOMMENDATION
TITLE OF DRAWING ENGINEER’S
NO. INCORPORATED IN FINAL
COMMENTS
SUBMISSION DESIGN
1 00 TITLE PAGE
12 S-11 MUMTY ROOF BEAM ELEVATION & OVER HEAD WTER TANK PLAN
15
16
NAME OF PROJECT: MIDWAY COMMERCIAL
The Structural Design and Drawings have been Checked and Vetted by
me and hereby recommended for approval of Structural NOC.
_________________________________ _________________________
ORIGINAL STRUCTURE DESIGNER PROOF ENGINEER
Sign: _____________________ Sign:__________________
Name: ENGR. SULEHA KISHWAR Name: ENGR. M.KAMIL DEHLVI
SBCA Regd. No. SBCA Regd. No.
as Structural Engineer: SE-06-311 as Proof Engineer: VE-A/3
Date: Date:_____________
17
We undersigned hereby certify that, we have physically inspected the site the
4. Rear: PLOT-176-B
In existence of above explained position of the plot we undertake that there is no dangerous
for excavation of proposed building, all excavation to be done as per excavation plan.
18