Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
30 views

Quality Management System Diffusion Matrix - Remarks

The document is a quality management system diffusion matrix that lists over 50 documents related to quality management. It provides details for each document such as the document code, latest edit date, date of implementation, and any remarks. The matrix is used to track key quality documents, ensure they are up to date, and note important information like locations documents are filed and who is responsible for filling out reports.

Uploaded by

Elias Jarjoura
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Quality Management System Diffusion Matrix - Remarks

The document is a quality management system diffusion matrix that lists over 50 documents related to quality management. It provides details for each document such as the document code, latest edit date, date of implementation, and any remarks. The matrix is used to track key quality documents, ensure they are up to date, and note important information like locations documents are filed and who is responsible for filling out reports.

Uploaded by

Elias Jarjoura
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

QUALITY MANAGEMENT SYSTEM

DIFFUSION MATRIX

Date of Remarks
Document of record title Code Latest Implemen- Include all your remarks:
edit" tation 1- Filled document location
2- Who is filling the report
3- Frequency of filling
4- Any other remark you might notice
once you do the handover with
Charbel
Process Map QM-F0 1 01/04/2018
Policy QM-F1 1 01/07/2009
Control of Documents M1P1 1 01/07/2009
Diffusion Matrix M1P1-F1 1 01/07/2009
Change-review-cancel M1P1-F2 1 01/07/2009
documents
Change-review-cancel M1P1-F3 1 01/07/2009
documents LIST
Documents transfer M1P1-F4 1 01/07/2009
evidence

Control of records M1P2 1 01/07/2009


List of external M1P2-F1 1 01/07/2009
documents
1 01/07/2009

Managing Internal M1P4 1 01/07/2009


Quality audit
List of Internal Quality M1P4-F1 1 01/07/2009
Auditors
Internal Audit Plan M1P4-F2 1 01/07/2009
Internal Audit M1P4-F3 1 01/07/2009
questionnaire
NC description Form M1P4-F4 1 01/07/2009
Internal Audit report M1P4-F5 1 01/07/2009

Managing of corrective M1P5 1 01/07/2009


& preventive actions
Improvement action form M1P5-F1 3 01/07/2018
IAF log M1P5-F2 1 01/07/2009

Management Review M1P6 1 01/07/2009


Management review M1P6-F1 1 01/07/2009
invitation
Management review M1P6-F2 1 01/07/2009
minutes
Management review M1P6-F3 1 01/07/2009
decisions follow up

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009


QUALITY MANAGEMENT SYSTEM
DIFFUSION MATRIX

Date of Remarks
Document of record title Code Latest Implemen-
edit" tation

Customer Satisfaction M1P7 1 01/07/2009


Evaluation
Guide satisfaction M1P7-G1 1 01/07/2009
information analysis
Complaint and request M1P7-F1 1 01/07/2009
data form
Complaint and request M1P7-F2 1 01/07/2009
log
Complaint request M1P7-F3 1 01/07/2009
answer
Customer satisfaction M1P7-F4 1 01/07/2009
evaluation questionnaire

Quality Control System M1P8 1/1 08/01/2010


Product Quality plan M1P8-F1 1/1 08/01/2010
Quality Control register M1P8-F2a 2 03/01/2018
form_raw material
Quality control register M1P8- 1 01/07/2009
form_preparing circle F2b
Quality control register M1P8-F2c 1 01/07/2009
form_company info
Quality control register M1P8- 1 01/07/2009
form_half cylinder F2d
Quality control register M1P8-F2e 1 01/07/2009
form_base welding
Quality control register M1P8-F2f 1 01/07/2009
form_ventre cylinder
Quality control register M1P8- 1 01/07/2009
form_fire cylinder F2g
Quality control register M1P8- 1 01/07/2009
form_water pressure F2h
cylinder
Quality control register M1P8-F2i 1 01/07/2009
form_painting cylinder
Quality control register M1P8-F2j 1 01/07/2009
form_air pressure
cylinder
Quality control register M1P8- 1 01/07/2009
form_weight batch F2k
cylinder
Quality control register M1P8- 1 01/07/2009
form_calibration sheet F2L
Quality control register M1P8- 1 01/07/2009
form_Burst test F2m

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009


QUALITY MANAGEMENT SYSTEM
DIFFUSION MATRIX

Date of Remarks
Document of record title Code Latest Implemen-
edit" tation

Quality control register M1P8- 1 01/07/2009


form_Tensile test F2n
Quality control register M1P8- 1 01/07/2009
form_Bend Test F2o
Quality control Paint M1P8- 1 01/07/2018
Test F2P
Test report form_Final M1P8-F3 1 01/07/2009
product
List of Quality M1P8-F4 01/07/2009
controllers
System quality plan M1P8-F5 01/07/2009
Processes Quality & M1P8-F6 1 01/07/2009
Efficiency Performance
Status
Risk Assessment M1P9 0 01/04/2018
Risk Assesment LOG M1P9-F1 1 01/04/2018
Product design and P1P1 1 01/04/2018
production planning
Product design form P1P1-F1 1 01/07/2009
Product design register P1P1-F2 1 01/07/2009
Weekly production plan P1P1-F4 2 01/01/2018
Production report form P1P1- 2 01/04/2018
F7A-E

Sales & Delivery P2P1 1 01/07/2009


Sales request form P2P1-F1 1 01/07/2009
Sales request log form P2P1-F2 1 01/07/2009
Stock availability request P2P1-F3 1 01/07/2009
answer form
Manufacturing Procedure P3P1 1 01/07/2009
and guidelines

Recruitment & Perform S1P1 1/1 21/09/2010


evaluation
Guide company jobs S1P1-G1 1 01/07/2009
description

Date of
Document of record title Code Latest Implemen-
edit" tation

Organizational Chart S1P1-F0 3 01/04/2018


Form
Request for personnel S1P1-F1 1 01/07/2009
recruitment

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009


QUALITY MANAGEMENT SYSTEM
DIFFUSION MATRIX
Job description form S1P1-F2 1 01/07/2009
Recruitment status log S1P1-F3 1 01/07/2009
Memo Personnel S1P1-F4 1 01/07/2009
Recruitment publication
Employee Evaluation S1P1-F5 2 01/01/2018
Form
Attendance S1P1-F6a- 1 01/01/2018
b
Employee Rotation Sheet S1P1-F7 0 01/02/2018
Table of Deputies S1P1-F8 0 01/02/2018
Employee Satisfaction S1P1-F9 0 01/02/2018
Survey And Auto-
Evaluation

Employees Training S1P2 1 01/07/2009


Identification of training S1P2-F1 1 01/07/2009
needs
Employees Training Plan S1P2-F2 1 01/07/2009
Employee training S1P2-F3 1 01/07/2009
Course nomination
Training course S1P2-F4 1 01/07/2009
employee evaluation
Training course S`P2-F5 1 01/07/2009
employee benefit

Purchasing & supplier S2P1 2 01/01/2018


evaluation
Supplier register S2P1-F1 1 01/07/2009
Suppliers approved list S2P1-F2 1 01/07/2009
Supplier evaluation sheet S2P1-F3 2 01/04/2018

Maintenance S3P1 1/1 13/10/2010


Equipment status S3P1-F1 1 01/07/2009
Machine Data Card S3P1-F2 1 01/07/2009
Machine maintenance S3P1-F3 1 01/07/2009
record
Annual Maintenance S3P1-F4 1 01/07/2009
Program
Machine Maintenance 3P1-F5 1 01/07/2009
Request

Values and Context MG-VC 0 01/04/2018


Control of changes 0 01/04/2018
request MG-VC-
F1

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009


QUALITY MANAGEMENT SYSTEM
DIFFUSION MATRIX
Date of Remarks
Document of record title Code Latest Implemen-
edit" tation
Storing S3P2 1/1 17/09/2010
Equipment Request S3P2-F1 1 01/07/2009
Receipt
Material request form S3P2-F2 1 01/07/2009
Loss of material or S3P2-F3 1 01/07/2009
equipment minutes
Weekly stock (steel) S3P2-F4a 1 17/09/2010
Weekly stock (Raw Material) S3P2-F4b 1 17/09/2010
Weekly stock (LPG Cylinders) S3P2-F4c 1 17/09/2010
Monthly stock (steel) S3P2-F5a 1 17/09/2010
Monthly stock (Raw Material) S3P2-F5b 1 17/09/2010
Monthly stock (LPG Cylinders) S3P2-F5c 1 17/09/2010
Annually stock (steel) S3P2-F6a 1 17/09/2010
Annually stock (Raw Material) S3P2-F6b 1 17/09/2010
Annually stock (LPG S3P2-F6c 1 17/09/2010
Cylinders)
Tensile testing procedure QC1P1 1 01/01/2016
Tensile testing Report QC1P1-F1 1
Guided Bend Testing Procedure QC1P2 1 01/01/2016
Guided Bend Testing Report QC1P2-F1 1
Macro-etching Procedure QC1P3 1 01/01/2016
Job Description for weld 1
QC1P3-F1
personnel
Procedure for Batch Sampling 1
and Dimensional Inspection
QC1P4 01/01/2016
Dimensional Inspection Report QC1P4-F1 1
Visual Inspection Procedure QC1P5 1 01/01/2016
Weld map-Traceability sheet - 1
QC1P5-F1
Visual Welding Inspection
Radiographic testing procedure QC1P6 1 01/01/2016
Liquid penetrant Procedure QC1P7 1 01/01/2016
Magnetic Particle Procedure QC1P8 1 01/01/2016
Pressure Testing Procedure QC1P9 1 01/01/2016
Mig Welding Machine 1
Calibration Procedure
QC1P10 01/01/2016
Post weld Heat treatment 1
(PWHT)
QC1P11 01/01/2016

* Definitions and Abbreviations

O= Owner P = Participant I = Informed

BOD = DG = Director General VDG= Vice Director


Board of Dirctors General
TQM = PM = Production Manager HRM = Human

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009


QUALITY MANAGEMENT SYSTEM
DIFFUSION MATRIX
Technical and Resources Sales
Quality Manage Purchasing Manager
MM = Maintenance SM = Storing Manager SEM = Section
Manager Manager
SPM = Sales and
Purchasing Manager

Ref.: M1P1-F1 Rev.:1 Date:01/07/2009

You might also like