Knowled ge Assessment Re port

Said Zian i
h .,ment: Drilling Operations, Supervisor, Surface
Assessment Date: March 25, 2021 12:37 PM
Score: 94%

Instructions
Thank you for completing the IADC Well Control Knowledge Assessmen t for the course. You scored 94 percent
on this knowledge assessment and, therefore, passed the course. If you passed your skills assessment you
will be given your Certificate of Completion by your instructor, who will also review your missed questions with
you .
After your instructor reviews your exam resu lts with you , you may choose to return to your computer to
review each test question you m issed on today's exam. To launch the review feature, log in using the same
code you used at the beginning of the exam.
Once you complete your review and you have received your Certificate, you are to log out of the testing
system and may leave the testing center.
Your company will be notified of your test results and be sent a copy of your Certificate of Completion

Topics for Review

Equipment:
o BOP stack, Stack Valves, and Wellhead Components
• Expla in the purpose of the key components of equipment on the BOP Stack (for example, the
annular, pipe rams, Variable Bore Rams (VBR), blind/shear rams, casing rams, test rams,
rubber goods, locking devices, HCR valves, drilling spool, choke and kill fine connections, and
wellhead connector/casing head).
Kick Detection:
0 Well Flow with Pumps....Qff
• Explain the term "flow check. "
IADC
WELLSHARP
Knowled ge Assessment Re port

Nan Sa id Ziani
Asses:.. .. ..:nt: Drilling Operations, Supervisor, Surface
Assessment Date: March 25, 2021 12:37 PM
Score: 94%

Instructions
Thank you for completing the IADC Well Control Know ledge Assessment for the course. You scored 94 percent
on this knowledge assessment and , t herefore, passed the course. I f you passed your skills assessment you
will be given your Certificate of Com plet ion by your instructor, who will also review your missed questions wit h
you.

After your instructor reviews your exam resu lts wit h you, you m ay choose to retu rn t o your compute r t o
review each test question you missed on today 's exam . To launch the rev iew feature, log in using the same
code you used at the beginning of the exam .
Once you complete your rev iew and you have received your Certificate, you are to log out of the testi ng
system and may leave the testing cent er.

You r company will be notified of yo ur test resu lts and be sent a copy of your Certificate of Complet ion

Topics for Review

Equipment:
0 BOP Stack, Stack Valves. and Wellhead Components
• Explain the purpose of the key components of equipment on the BOP Stack (for example, the
annular, pipe rams, Variable Bore Rams (VBR), blind/shear rams, casing rams, test ram s,
rubber goods, locking devices, HCR valves, drilling spool, choke and kill line connections, and
wellhead connector/casing head).
Kick Detection:
o Well Flow with Pumps Off
• Explain the term "flow check."
~T1'!. IADC
WELLSHARP
'L i l
Knowled ge Assessment Re port
I IVIIIC.UI 1119 CX: N\.C.IWII.IC.::» .

sis of Shut-I n Condit ions


Explain Shut-In Dri/lpipe Pressure (SIDPP) and Shut -I n Casing Pressure (SICP).
Risk Management :
0 Handling Kill Problems and Effect of Incorrect Procedures
Identify problems that can happen during a well control operation (for example, plugging;
washouts; losses; equipment issues) .

Missed Questions
• Which of the following parameters will affect the value of the Shut In Casing Pressure?
Vj mxig
Answered : Choke line length
Correct: Annulus capacity per foot

• When testing a surface stack set of rams at a weekly BOP test, you are informed that t he
weep-hole is leaking wellbore fluid. What action would you take?
f8dqkS
Answered: Ram top seals are leaking and shou ld be replaced
Correct: Piston rod mud seal is leaking and should be replaced and re-tested

• The results of a flow check are inconclusive due to the small volume of returns from the
well. Which of the following is the most accurate way to determine if the well is f lowing?
6PhTLM
Answered: Close in the well and line up through the mud-gas separator and monitor for flow at the
Shakers
Correct: Line up to the trip tank and monitor for gains or losses

• While circulating out an influx, no increase in casing pressure or pit volume is observed.
W hat could potentially be occuring?
AJ PLBE
Answered: Pumps are failing
Correct: A liquid influx is in the well