GENERAL NOTES

1. FOR GENERAL NOTE, SYMBOLS, AND PIPING DETAIL


SEE P&ID NUMBERS 26071-100-M6-000-00001 THROUGH 26701-100-M6-000-00065.

NOTES
1. FOR STANDARD SYMBOLS AND DETAILS SEE DRG. NO. 50-DA-09.

2. PLANT 8B LINES ARE FLAGGED TO 8A-DA-5 SERIES P&ID's WHICH ARE


IDENTICAL FOR PLANT 8B.

3. INSTRUMENT TO BE PREFIXED :
08A FOR PLANT 8A
08B FOR PLANT 8B

4. LINES 8P54, 21P562, 21P563, 21P564, 8A-P58 AND 8B-P-58 TO BE TRAPPED


AS STEAM HEADERS.

HOLD LIST

REFERENCE DRAWINGS
8-DA-6 SHEET 6 OF 8 REV 4 PLANT No.8 - HYDROCRACKER UNIT BATTERY LIMITS - PROCESS LINES

00A 29 NOV 19 ISSUED FOR REVIEW FF/RY/NF/THH HH/IP/J.H.KIM C.J.LEE/Y.D.KIM

REV DATE DESCRIPTION DRAWN CHK'D APP'D

THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
BY PT PERTAMINA (PERSERO).

PROJECT :

RDMP RU V BALIKPAPAN
CONTRACTOR :

RDMP BALIKPAPAN JO
OWNER :
PT PERTAMINA
PERTAMINA
BALIKPAPAN, INDONESIA
TITLE :
PIPING AND INSTRUMENT DIAGRAM
PLANT NO. 8 - HYDROGEN UNIT BATTERY LIMITS
PROCESS LINES
PERTAMINA DRAWING NO. REV.
NONE 26071 26071-203-M6-000-01011 1 OF 1
00A
SCALE JOB NO. DOCUMENT NO. SHT NO.