RDMP Ru V Balikpapan: Piping and Instrument Diagram Plant No. 8 - Hydrogen Unit Battery Limits Process Lines
RDMP Ru V Balikpapan: Piping and Instrument Diagram Plant No. 8 - Hydrogen Unit Battery Limits Process Lines
RDMP Ru V Balikpapan: Piping and Instrument Diagram Plant No. 8 - Hydrogen Unit Battery Limits Process Lines
NOTES
1. FOR STANDARD SYMBOLS AND DETAILS SEE DRG. NO. 50-DA-09.
3. INSTRUMENT TO BE PREFIXED :
08A FOR PLANT 8A
08B FOR PLANT 8B
HOLD LIST
REFERENCE DRAWINGS
8-DA-6 SHEET 6 OF 8 REV 4 PLANT No.8 - HYDROCRACKER UNIT BATTERY LIMITS - PROCESS LINES
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF PT PERTAMINA (PERSERO) THIS DRAWING OR THE MATERIAL
DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR
OTHER THAN THE PURPOSE FOR IN ANY FORM OR MEDIUM TO THIRD PARTIES, OR USED FOR OTHER THAN THE PURPOSE
FOR WHICH IT HAS BEEN PROVIDED, IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY PERMITTED
BY PT PERTAMINA (PERSERO).
PROJECT :
RDMP RU V BALIKPAPAN
CONTRACTOR :
RDMP BALIKPAPAN JO
OWNER :
PT PERTAMINA
PERTAMINA
BALIKPAPAN, INDONESIA
TITLE :
PIPING AND INSTRUMENT DIAGRAM
PLANT NO. 8 - HYDROGEN UNIT BATTERY LIMITS
PROCESS LINES
PERTAMINA DRAWING NO. REV.
NONE 26071 26071-203-M6-000-01011 1 OF 1
00A
SCALE JOB NO. DOCUMENT NO. SHT NO.