Daftar Dokumen 2 Minggu Kedepan

JOB 289-CTR 022 & CTR 039


PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

1 BMH-FED-SYN-00-G0-SW-001 Scope Of Work EPC RIFR PMT 30-May-23 0.00%


2 BMH-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
3 BMH-FED-SYN-00-P0-PID-002 P&ID Firewater system RIFR PRO 30-May-23 0.00%
4 BMH-FED-SYN-00-P0-PID-003 P&ID Firewater Mainring RIFR PRO 30-May-23 0.00%
5 BMH-FED-SYN-00-P1-CA-005 Hydraulic Calculation (Firewater, Water Spray , Foam) RIFR SAF 30-May-23 0.00%
6 BMH-FED-SYN-00-P1-DW-007 Fire & Gas Detection Layout (Section Plan 1) IFR Outstanding PRO 30-May-23 0.03%
7 BMH-FED-SYN-00-P1-DW-008 Fire & Gas Detection Layout (Section Plan 2) IFR Outstanding PRO 30-May-23 0.03%
8 BMH-FED-SYN-00-P1-RE-002 HAZOP Study Report (SP BMH) IFR 1W SAF 30-May-23 0.01%
9 BMH-FED-SYN-00-P1-RE-003 HAZID Study Report (SP BMH) IFR 1W SAF 30-May-23 0.01%
10 BMH-FED-SYN-00-P1-RE-004 HAZOP Study Report (BS Cilamaya) IFR 1W SAF 30-May-23 0.01%
11 BMH-FED-SYN-00-P1-RE-005 HAZID Study Report (BS Cilamaya) IFR 1W SAF 30-May-23 0.01%
12 BMH-FED-SYN-00-P1-RE-006 HAZOP Study Report (SKG Cilamaya) IFR 1W SAF 30-May-23 0.01%
13 BMH-FED-SYN-00-P1-RE-007 HAZID Study Report (SKG Cilamaya) IFR 1W SAF 30-May-23 0.01%
14 BMH-FED-SYN-00-M0-DS-012 Mechanical Datasheet for Fire Water Pump Package and Jockey Pump RIFR MEC 30-May-23 0.00%
15 BMH-FED-SYN-00-L0-CA-002 Pipe Stress Analysis IFR Outstanding PIP 30-May-23 0.19%
16 BMH-FED-SYN-00-L0-CA-003 Pipeline Stress Analysis (Gas Trunkline) - cesar IFR Outstanding PIP 30-May-23 0.14%
17 BMH-FED-SYN-00-L0-CA-004 Pipeline Stress Analysis (Liquid Trunkline) - cesar IFR Outstanding PIP 30-May-23 0.14%
18 BMH-FED-SYN-00-L0-DW-002 Key Plan Drawing IFR Outstanding PIP 30-May-23 0.14%
19 BMH-FED-SYN-00-L0-DW-003 Piping Plan & Pipe Support Location Drawing - Area 1 IFR Outstanding PIP 30-May-23 0.22%
20 BMH-FED-SYN-00-L0-DW-004 Piping Plan & Pipe Support Location Drawing - Area 2 IFR Outstanding PIP 30-May-23 0.22%
21 BMH-FED-SYN-00-L0-DW-005 Piping Plan & Pipe Support Location Drawing - Area 3 IFR Outstanding PIP 30-May-23 0.22%
22 BMH-FED-SYN-00-L0-DW-006 Piping Plan & Pipe Support Location Drawing - Area 4 IFR Outstanding PIP 30-May-23 0.22%
23 BMH-FED-SYN-00-L0-DW-007 Piping Plan & Pipe Support Location Drawing - Area 5 IFR Outstanding PIP 30-May-23 0.22%
24 BMH-FED-SYN-00-L0-DW-008 Piping Plan & Pipe Support Location Drawing - Area 6 IFR Outstanding PIP 30-May-23 0.22%
25 BMH-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Manual Valve Piping Bulk & Manual Valve IFR 1W PIP 30-May-23 0.07%
26 BMH-FED-SYN-00-J0-DS-021 Instrument Datasheet Temperature Gauge & Thermowell IFR Outstanding INS 30-May-23 0.02%
27 BMH-FED-SYN-00-J0-DW-001 Instrument Key Plan IFR 1W INS 30-May-23 0.04%
28 BMH-FED-SYN-00-J0-DW-002 Instrument Junction Box, Main Cable & Cable Tray Layout Plan (Overall Plan) IFR 1W INS 30-May-23 0.04%
29 BMH-FED-SYN-00-J0-DW-005 Shutdown Hierarchy - Emergency Shutdown System (2sheet) RIFR INS 30-May-23 0.00%
30 BMH-FED-SYN-00-J0-DW-006 Cause and Effect Diagram - sheet-1 IFR 1W INS 30-May-23 0.05%
31 BMH-FED-SYN-00-J0-DW-007 Cause and Effect Diagram - sheet-2 IFR 1W INS 30-May-23 0.05%
32 BMH-FED-SYN-00-J0-DW-008 Cause and Effect Diagram - sheet-3 IFR 1W INS 30-May-23 0.05%
33 BMH-FED-SYN-00-J0-DW-009 Cause and Effect Diagram - sheet-4 IFR 1W INS 30-May-23 0.05%
34 BMH-FED-SYN-00-J0-DW-010 Cause and Effect Diagram - sheet-5 IFR 1W INS 30-May-23 0.05%
35 BMH-FED-SYN-00-J0-DW-011 Cause and Effect Diagram - sheet-6 IFR 1W INS 30-May-23 0.05%
36 BMH-FED-SYN-00-J0-DW-012 Cause and Effect Diagram - sheet-7 IFR 1W INS 30-May-23 0.05%
37 BMH-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%

30-May-23
38 BMH-FED-SYN-00-E0-SR-001 Load Flow Study IFR Outstanding ELE 0.08%
39 BMH-FED-SYN-00-E0-LS-003 Electrical Power and Control Cable Schedule IFR Outstanding ELE 30-May-23 0.04%
40 BMH-FED-SYN-00-E0-SR-002 Short circuit calculation IFR Outstanding ELE 30-May-23 0.07%
41 BMH-FED-SYN-00-E0-SR-003 Motor Starting Study IFR Outstanding ELE 30-May-23 0.07%
42 BMH-FED-SYN-00-E0-DW-009 Earthing and Lightning Protection Plan IFR Outstanding ELE 30-May-23 0.04%
43 BMH-FED-SYN-00-E0-DW-007 Electrical Power and Control Cable Layout IFR Outstanding ELE 30-May-23 0.04%
44 BMH-FED-SYN-00-E0-MT-001 Electrical Material Take Off (MTO) IFR 1W ELE 30-May-23 0.05%
45 BMH-FED-SYN-00-A0-CA-003 Foundation Calculation for All Compressor Package IFR 1W CIV 30-May-23 0.04%
46 Foundation Calculation for Fuelfor
GasPumps
Scrubber 30-May-23 0.00%
BMH-FED-SYN-00-A0-CA-006 Typical Foundation Calculation (Include : Firewater and Jockey Pump, RIFR CIV
47 BMH-FED-SYN-00-A0-CA-011 All Transfer Pumps, All Drain Pumps, and Service Pumps) IFR Outstanding CIV 30-May-23 0.04%
48 BMH-FED-SYN-00-A0-CA-014 Foundation Calculation for Custody Gas Metering IFR 1W CIV 30-May-23 0.03%
49 BMH-FED-SYN-00-A0-CA-015 Foundation Calculation for Air Compressor Package RIFR CIV 30-May-23 0.00%
50 BMH-FED-SYN-00-A0-CA-017 Foundation Calculation for Flare Tip Package IFR 1W CIV 30-May-23 0.02%
51 BMH-FED-SYN-00-A0-CA-020 Calculation for Firewater Pond IFR Outstanding CIV 30-May-23 0.02%
52 BMH-FED-SYN-00-A0-CA-021 Calculation for Closed Drain Pit IFR Outstanding CIV 30-May-23 0.02%
53 BMH-FED-SYN-00-A0-CA-022 Foundation Calculation for K.O Drum RIFR CIV 30-May-23 0.00%
54 BMH-FED-SYN-00-A0-CA-023 Structures and Foundation Calculation for Control Room and MCC Building IFR 1W CIV 30-May-23 0.04%
55 BMH-FED-SYN-00-A0-CA-026 Structures and Foundation Calculation for Firewater Pump Shelter IFR Outstanding CIV 30-May-23 0.04%
56 BMH-FED-SYN-00-A0-CA-027 Foundation Calculation for Flare Stack IFR 1W CIV 30-May-23 0.05%
57 BMH-FED-SYN-00-A0-CA-028 Foundation Calculation for Vent Stack IFR 1W CIV 30-May-23 0.05%
58 BMH-FED-SYN-00-A0-CA-029 Foundation Calculation for Lightning Protection IFR 1W CIV 30-May-23 0.05%
59 BMH-FED-SYN-00-A0-CA-030 Foundation Calculation for Lighting Pole IFR 1W CIV 30-May-23 0.05%
60 BMH-FED-SYN-00-A0-DW-005 Instrument Air Compressor Package Foundation (sheet 1) IFR 1W CIV 30-May-23 0.04%
61 BMH-FED-SYN-00-A0-DW-014 Windshock Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
62 BMH-FED-SYN-00-A0-DW-015 Liquid Transfer Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
63 BMH-FED-SYN-00-A0-DW-016 Fire Water Pump Package & Jokey Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
64 BMH-FED-SYN-00-A0-DW-018 Closed Drain Pumps Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
65 BMH-FED-SYN-00-A0-DW-019 Open Drain Pumps Foundation(sheet 1) IFR 1W CIV 30-May-23 0.02%
66 BMH-FED-SYN-00-A0-DW-020 Deep Well Pump Foundation (sheet 1) IFR 1W CIV 30-May-23 0.02%
67 BMH-FED-SYN-00-A0-DW-026 Dehydration Unit (DHU) Package Foundation (sheet 1) RIFR CIV 30-May-23 0.00%
68 BMH-FED-SYN-00-A0-DW-028 Chemical Injection Package Foundation (sheet 1) IFR Outstanding CIV 30-May-23 0.02%
69 BMH-FED-SYN-00-A0-DW-032 K.O Drum Pump
Foundation Plan ( 2 sheet ) Foundation Detail Drawing, Elevation, IFR 1W CIV 30-May-23 0.04%
Firewater Shelter Structure and
70 BMH-FED-SYN-00-A0-DW-046 and Section (sheet 1) IFR 1W CIV 30-May-23 0.04%
71 BMH-FED-SYN-00-A0-DW-047 Firewater Pump Shelter Structure and Foundation Plan, Elevation, and Section IFR 1W CIV 30-May-23 0.04%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

72 BMH-FED-SYN-00-A0-DW-058 Fence and Gate Drawing (3 sheet) IFR Outstanding CIV 30-May-23 0.05%
73 BMH-FED-SYN-00-A0-DW-059 Foam tank Foundation (sheet 1) IFR Outstanding CIV 30-May-23 0.02%
74 BMH-FED-SYN-00-A0-DW-061 Rigid Road, Paving and Site Grading Drawing (3 sheet) RIFR CIV 30-May-23 0.00%
75 BSC-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
76 BSC-FED-SYN-00-P0-UFD-001 UFD Modification / demolished (1 Sheet) IFR Outstanding PRO 30-May-23 0.03%
77 BSC-FED-SYN-00-L0-LS-001 Tie-In List IFR Outstanding PIP 30-May-23 0.05%
78 BSC-FED-SYN-00-L0-DS-001 Datasheet for Manual Valve IFR Outstanding PIP 30-May-23 0.03%
79 BSC-FED-SYN-00-L0-DS-002 Datasheet for Piping Specialty Item IFR Outstanding PIP 30-May-23 0.04%

80 30-May-23 0.19%
BSC-FED-SYN-00-L0-CA-001 Pipe Stress Analysis (For Tank, Pump) IFR 1W PIP
81 BSC-FED-SYN-00-L0-DW-002 Piping Plan Tank Area IFR Outstanding PIP 30-May-23 0.22%
82 BSC-FED-SYN-00-L0-DW-003 Pipe Support Location Tank Area IFR Outstanding PIP 30-May-23 0.22%
83 BSC-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Piping Bulk, Pipe Support & Manual Valve IFR 1W PIP 30-May-23 0.07%
84 BSC-FED-SYN-00-J0-DS-003 Instrument Data Sheet Level Transmitter (D/P type) IFR Outstanding INS 30-May-23 0.03%
85 BSC-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%
86 BSC-FED-SYN-00-E0-DW-001 Electrical One Line Diagram IFR Outstanding ELE 30-May-23 0.04%
87 BSC-FED-SYN-00-E0-LS-001 Electrical Power and Control Cable Schedule IFR Outstanding ELE 30-May-23 0.04%
88 BSC-FED-SYN-00-E0-CA-002 Lightning Protecting System Study IFR Outstanding ELE 30-May-23 0.04%
89 BSC-FED-SYN-00-E0-CA-001 Lightning Illumination Calculation IFR Outstanding ELE 30-May-23 0.02%
90 BSC-FED-SYN-00-E0-DW-001 Electrical Cable Routing & Tray Layout IFR Outstanding ELE 30-May-23 0.03%
91 BSC-FED-SYN-00-E0-DW-002 Grounding and Lightning Protection Plan IFR Outstanding ELE 30-May-23 0.04%
92 BSC-FED-SYN-00-E0-MT-001 Electrical Material Take Off (MTO) IFR 1W ELE 30-May-23 0.05%
93 BSC-FED-SYN-00-A0-CA-003 Calculation for Pipe Sleeper IFR Outstanding CIV 30-May-23 0.03%
94 BSC-FED-SYN-00-A0-DW-004 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.02%
95 BSC-FED-SYN-00-A0-MT-001 MTO for Civil IFR 1W CIV 30-May-23 0.05%
96 BSC-FED-SYN-00-A0-MT-002 MTO for Structure IFR 1W CIV 30-May-23 0.05%
97 SKG-FED-SYN-00-G0-RE-001 Site Survey Report RIFR PMT 30-May-23 0.00%
98 SKG-FED-SYN-00-L0-LS-001 Tie-In List IFR Outstanding PIP 30-May-23 0.05%
99 SKG-FED-SYN-00-L0-DS-001 Datasheet for Piping Specialty Item IFR Outstanding PIP 30-May-23 0.04%
100 SKG-FED-SYN-00-L0-CA-001 Pipe Stress Analysis IFR 1W PIP 30-May-23 0.19%
101 SKG-FED-SYN-00-L0-CA-002 Pipe Wall Thickness Calculation IFR Outstanding PIP 30-May-23 0.05%
102 SKG-FED-SYN-00-L0-DW-001 Overall Plant Layout IFR Outstanding PIP 30-May-23 0.14%
103 SKG-FED-SYN-00-L0-DW-002 Piping Plan & Pipe Support Location Drawing - Area 1/Area Pig Receiver IFR Outstanding PIP 30-May-23 0.22%
104 SKG-FED-SYN-00-L0-DW-003 Piping Plan & Pipe Support Location Drawing - Area 2/Area Tei-in IFR Outstanding PIP 30-May-23 0.22%
105 SKG-FED-SYN-00-L0-MT-001 Material Take Off (MTO) - Piping Bulk & Manual Valve IFR 1W PIP 30-May-23 0.07%
106 SKG-FED-SYN-00-J0-MT-001 MTO - Instrument IFR 1W INS 30-May-23 0.08%
107 SKG-FED-SYN-00-A0-CA-001 Foundation Calculation for Liquid Pig Receiver IFR 1W CIV 30-May-23 0.02%
108 SKG-FED-SYN-00-A0-CA-002 Structure and Foundation Calculation for Pipe Support IFR 1W CIV 30-May-23 0.03%
109 SKG-FED-SYN-00-A0-CA-003 Foundation Calculation for Pipe Sleeper IFR 1W CIV 30-May-23 0.03%
110 SKG-FED-SYN-00-A0-DW-001 Foundation for Liquid Pig Receiver IFR Outstanding CIV 30-May-23 0.02%
111 SKG-FED-SYN-00-A0-DW-002 Pipe Sleeper Foundation Drawing IFR Outstanding CIV 30-May-23 0.02%
112 SKG-FED-SYN-00-A0-DW-003 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.05%
113 SKG-FED-SYN-00-A0-MT-001 MTO for Civil IFR 1W CIV 30-May-23 0.05%
114 SKG-FED-SYN-00-A0-MT-002 MTO for Structure IFR 1W CIV 30-May-23 0.05%
115 BMH-FED-SYN-00-A0-CA-034 Calculation for Culvert Road & Railway Crossing for Flowline - Trunkline IFR Outstanding CIV 30-May-23 0.04%
116 BMH-FED-SYN-00-A0-CA-035 Calculation for Pipe Bridge River Crossing (for typical river crossing) IFR Outstanding CIV 30-May-23 0.04%
117 BMH-FED-SYN-00-A0-DW-064 Box Culvert Road Crossing Drawing (3 Sheet) IFR 1W CIV 30-May-23 0.05%
118 BMH-FED-SYN-00-A0-DW-065 IFR 1W
Steel Bridge Structure for River Crossing Drawing (for typical river crossing) (3sheet) CIV 30-May-23 0.06%
119 BMH-FED-SYN-00-A0-MT-003 MTO for Civil IFR 1W CIV 30-May-23 0.05%
120 BMH-FED-SYN-00-A0-MT-004 MTO for Structure IFR 1W CIV 30-May-23 0.05%
121 BMH-FED-SYN-00-L0-CA-010 Onshore Pipeline River Crossing Analysis (Trunkline Gas) IFR Outstanding PL 30-May-23 0.07%
122 BMH-FED-SYN-00-L0-CA-011 Onshore Pipeline River Crossing Analysis (Trunkline Liquid) IFR Outstanding PL 30-May-23 0.07%
123 BMH-FED-SYN-00-L0-DW-025 Pipeline River Crossing List (Flowline) IFR Outstanding PL 30-May-23 0.06%
124 BMH-FED-SYN-00-L0-DW-026 Pipeline River Crossing List (Trunkline) IFR Outstanding PL 30-May-23 0.06%
125 BMH-FED-SYN-00-L0-DW-027 Pipeline Road Crossing List (Flowline) IFR Outstanding PL 30-May-23 0.06%
126 BMH-FED-SYN-00-L0-DW-028 Pipeline Road Crossing List (Trunkline) IFR Outstanding PL 30-May-23 0.06%
127 BMH-FED-SYN-00-L0-DW-029 Cathodic Protection Drawing (Flowline) IFR 1W PL 30-May-23 0.03%
128 BMH-FED-SYN-00-L0-DW-030 Cathodic Protection Drawing (Trunkline ) IFR 1W PL 30-May-23 0.03%
129 BMH-FED-SYN-00-L0-MT-002 Material Take Off (MTO) for Flowline BMH-INF1 IFR 1W PL 30-May-23 0.05%
130 BMH-FED-SYN-00-L0-MT-003 Material Take Off (MTO) for Flowline BMH-01 IFR 1W PL 30-May-23 0.05%
131 BMH-FED-SYN-00-L0-MT-004 Material Take Off (MTO) for Flowline BMH-STOA IFR 1W PL 30-May-23 0.05%
132 BMH-FED-SYN-00-L0-MT-005 Material Take Off (MTO) for Flowline BMH-STOB IFR 1W PL 30-May-23 0.05%
133 BMH-FED-SYN-00-L0-MT-006 Material Take Off (MTO) for Flowline CLS-INF IFR 1W PL 30-May-23 0.05%
134 BMH-FED-SYN-00-L0-MT-007 Material Take Off (MTO) for Gas Trunkline IFR 1W PL 30-May-23 0.05%
135 BMH-FED-SYN-00-L0-MT-008 Material Take Off (MTO) for Liquid Trunkline IFR 1W PL 30-May-23 0.05%
136 BMH-FED-SYN-00-L0-DS-005 Datasheet for Manual Valve (If Required) IFR Outstanding PIP 30-May-23 0.03%
137 BMH-FED-SYN-00-L0-DS-006 Datasheet for Piping Specialty Item (If Required) IFR Outstanding PIP 30-May-23 0.04%
138 BMH-FED-SYN-00-L0-DW-031 Piping Plan - (Typical 5 flowline) IFR Outstanding PIP 30-May-23 0.22%
139 BMH-FED-SYN-00-L0-MT-009 Material Take Off (MTO) - Piping Bulk, Pipe Support & Manual Valve IFR 1W PIP 30-May-23 0.07%
140 BMH-FED-SYN-00-A0-DW-066 Pipe Support Structure and Foundation Drawing IFR Outstanding CIV 30-May-23 0.03%
141 BMH-FED-SYN-00-A0-MT-005 MTO for Civil IFR 1W CIV 30-May-23 0.05%
142 BMH-FED-SYN-00-P0-SR-006 Flare Network Hydraulic Study IFA Outstanding PRO 30-May-23 0.08%
143 BMH-FED-SYN-00-P0-CA-021 KO Drum Pump Calculation Report IFA Outstanding PRO 30-May-23 0.03%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

144 BMH-FED-SYN-00-P0-CA-024 Utility Consumption Study Report IFA Outstanding PRO 30-May-23 0.03%
145 BMH-FED-SYN-00-P0-CA-030 Service Water Pump Calculation Report IFA Outstanding PRO 30-May-23 0.00%
146 BMH-FED-SYN-00-P0-LS-001 Line List of Fire Protection (Hydrant, Fire Cabinet, CO2 Extinguesher, Fire IFA Outstanding PRO 30-May-23 0.03%
Datasheet
147 BMH-FED-SYN-00-P1-DS-001 Extinguish System, and Foam Cabinet) IFA 1W SAF 30-May-23 0.00%

148 BMH-FED-SYN-00-P1-DS-002 Datasheet of Safety Equipment IFA 1W SAF 30-May-23 0.00%


149 BMH-FED-SYN-00-P1-DS-003 Datasheet of Foam System IFA 1W SAF 30-May-23 0.00%
150 BMH-FED-SYN-00-P1-DS-004 Datasheet of CO2 Snuffing System IFA 1W SAF 30-May-23 0.00%
151 BMH-FED-SYN-00-P1-DW-006 Fire & Gas Detection Layout (Overall Layout) IFA Outstanding PRO 30-May-23 0.02%
152 BMH-FED-SYN-00-M0-CA-001 Mechanical Strength Calculation For Pressure Vessel ( Exclude Package Vendor) IFA 1W MEC 30-May-23 0.03%
153 BMH-FED-SYN-00-M0-CA-002 Mechanical Strength Calculation For Storage Tank ( Exclude Package Vendor) IFA 1W MEC 30-May-23 0.03%
154 BMH-FED-SYN-00-M0-DS-008 Mechanical Datasheet for Liquid Transfer Pump IFA 1W MEC 30-May-23 0.03%
155 BMH-FED-SYN-00-M0-DS-010 Mechanical Datasheet for Flare Tip Package IFA 1W MEC 30-May-23 0.02%
156 BMH-FED-SYN-00-M0-DS-011 Mechanical Datasheet for Gas Engine Generator Set IFA 1W MEC 30-May-23 0.04%
157 BMH-FED-SYN-00-M0-DS-013 Mechanical Datasheet for Chemical Injection Pump IFA 1W MEC 30-May-23 0.02%
158 BMH-FED-SYN-00-L0-DS-001 Datasheet for Manual valve IFA Outstanding PIP 30-May-23 0.02%
159 BMH-FED-SYN-00-L0-CA-001 Pipe Wall Thickness Calculation IFA Outstanding PIP 30-May-23 0.03%
160 BMH-FED-SYN-00-J0-LS-003 Instrument Power Consumption List IFA 1W INS 30-May-23 0.02%
161 BMH-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Safety Valve IFA 1W INS 30-May-23 0.02%
162 BMH-FED-SYN-00-J0-DS-002 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.02%
163 BMH-FED-SYN-00-J0-DS-003 Instrument Data Sheet Pressure Transmitter IFA 1W INS 30-May-23 0.02%
164 BMH-FED-SYN-00-J0-DS-005 Instrument Data Sheet Temperature Gauge IFA 1W INS 30-May-23 0.01%
165 BMH-FED-SYN-00-J0-DS-006 Instrument Data Sheet Temperature Transmitter IFA 1W INS 30-May-23 0.01%
166 BMH-FED-SYN-00-J0-DS-007 Instrument Data Sheet Turbine Flowmeter IFA 1W INS 30-May-23 0.01%
167 BMH-FED-SYN-00-J0-DS-008 Instrument Data Sheet Level Gauge IFA 1W INS 30-May-23 0.02%
168 BMH-FED-SYN-00-J0-DS-009 Instrument Data Sheet Differential Pressure Level Transmitter IFA 1W INS 30-May-23 0.02%
169 BMH-FED-SYN-00-J0-DS-010 Instrument Data Sheet Control Valve & Controller IFA 1W INS 30-May-23 0.02%
170 BMH-FED-SYN-00-J0-DS-011 Instrument Data Sheet Shutdown Valve/Blowdown Valve IFA 1W INS 30-May-23 0.02%
171 BMH-FED-SYN-00-J0-DS-012 Instrument Data Sheet Tank Breather Valve & Emergency Relief Valve IFA 1W INS 30-May-23 0.00%
172 BMH-FED-SYN-00-J0-DS-013 Instrument Data Sheet Pressure Regulator and Reducing Data Sheet IFA 1W INS 30-May-23 0.01%
173 BMH-FED-SYN-00-E0-LS-001 Electrical Load List IFA 1W ELE 30-May-23 0.03%
174 BMH-FED-SYN-00-E0-CA-003 Lighting Illumination Calculation IFA Outstanding ELE 30-May-23 0.03%
175 BMH-FED-SYN-00-E0-DW-001 Overall One Line Diagram IFA 1W ELE 30-May-23 0.02%
176 BSC-FED-SYN-00-P0-CA-001 Process Calculation for Production Tank IFA Outstanding PRO 30-May-23 0.02%
177 BSC-FED-SYN-00-P1-RE-003 Fire & Gas Detector Mapping Study (2D) IFA 1W SAF 30-May-23 0.08%
178 BSC-FED-SYN-00-P0-PFD-001 Process Flow Diagram (PFD) Tie in to Facility existing IFA Outstanding PRO 30-May-23 0.02%
179 BSC-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Indicator & Transmitter IFA 1W INS 30-May-23 0.02%
180 BSC-FED-SYN-00-J0-DS-004 Instrument Data Sheet Breather Valve IFA 1W INS 30-May-23 0.00%
181 BSC-FED-SYN-00-J0-DS-005 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.01%
182 BSC-FED-SYN-00-J0-DS-006 Instrument Data Sheet Temperature Gauge & Thermowell IFA 1W INS 30-May-23 0.01%
183 BSC-FED-SYN-00-J0-DS-007 Instrument Data Sheet Level Gauge IFA 1W INS 30-May-23 0.01%
184 BSC-FED-SYN-00-J0-DS-009 Instrument Data Sheet Pig Signal IFA 1W INS 30-May-23 0.00%
185 BSC-FED-SYN-00-A0-CA-002 Foundation Calculation for Production Tank/Test Tank IFA 1W CIV 30-May-23 0.03%
186 BSC-FED-SYN-00-A0-CA-004 Calculation for Pipe Sleeper IFA 1W CIV 30-May-23 0.02%
187 SKG-FED-SYN-00-P0-PFD-001 Process Flow Diagram (PFD) Tie in to Facility existing IFA Outstanding PRO 30-May-23 0.02%
188 SKG-FED-SYN-00-J0-DS-001 Instrument Data Sheet Pressure Safety Valve IFA 1W INS 30-May-23 0.02%
189 SKG-FED-SYN-00-J0-DS-002 Instrument Data Sheet Pressure Gauge IFA 1W INS 30-May-23 0.02%
190 SKG-FED-SYN-00-J0-DS-003 Instrument Data Sheet Temperature Gauge IFA 1W INS 30-May-23 0.01%
191 SKG-FED-SYN-00-J0-DS-004 Instrument Data Sheet Pig Signal IFA 1W INS 30-May-23 0.00%
192 BMH-FED-SYN-00-L0-BD-002 Pipeline Design Basis IFA Outstanding PL 30-May-23 0.00%
193 BMH-FED-SYN-00-L0-SP-002 Specification for Field Joint Coating IFA Outstanding PL 30-May-23 0.03%
194 BMH-FED-SYN-00-L0-SP-003 Specification for Anti Corrosion Coating IFA Outstanding PL 30-May-23 0.01%
195 BMH-FED-SYN-00-L0-DS-003 Anti Corrosion Coating Data Sheet (Flowline) IFA 1W PL 30-May-23 0.02%
196 BMH-FED-SYN-00-L0-DS-004 Field Joint Coating Data Sheet (Trunkline) untuk trunkline dan flowline IFA 1W PL 30-May-23 0.02%
197 BMH-FED-SYN-00-L0-CA-012 Pipeline Cathodic Protection Design (Trunkline gas & Liquid) IFA Outstanding PL 30-May-23 0.04%
198 BMH-FED-SYN-00-L0-DW-009 General Field Layout (Flowline & Trunkline) IFA Outstanding PL 30-May-23 0.03%
199 BMH-FED-SYN-00-L0-DW-011 Onshore Pipeline Route Drawing for Flowline BMH-INF1 IFA 1W PL 30-May-23 0.04%
200 BMH-FED-SYN-00-L0-DW-012 Onshore Pipeline Route Drawing for Flowline BMH-01 IFA 1W PL 30-May-23 0.04%
201 BMH-FED-SYN-00-L0-DW-013 Onshore Pipeline Route Drawing for Flowline BMH-STOA IFA 1W PL 30-May-23 0.04%
202 BMH-FED-SYN-00-L0-DW-014 Onshore Pipeline Route Drawing for Flowline BMH-STOB IFA 1W PL 30-May-23 0.04%
203 BMH-FED-SYN-00-L0-DW-015 Onshore Pipeline Route Drawing for Flowline CLS-INF IFA 1W PL 30-May-23 0.04%
204 BMH-FED-SYN-00-L0-DW-016 Onshore Pipeline Route Drawing for Gas Trunkline IFA 1W PL 30-May-23 0.04%
205 BMH-FED-SYN-00-L0-DW-017 Onshore Pipeline Route Drawing for Liquid Trunkline IFA 1W PL 30-May-23 0.04%
206 BMH-FED-SYN-00-P0-SR-001 Process Operation Control and Shutdown Philosophy IFB Outstanding PRO 30-May-23 0.03%
207 BMH-FED-SYN-00-P0-SR-002 Material Selection Study Flowline and Trunkline IFB Outstanding PRO 30-May-23 0.05%
208 BMH-FED-SYN-00-P0-SR-003 Material Selection Study Main Equipment IFB Outstanding PRO 30-May-23 0.05%
209 BMH-FED-SYN-00-P0-SR-004 Material Selection Study Piping IFB Outstanding PRO 30-May-23 0.05%
210 BMH-FED-SYN-00-P0-SR-005 Relief and Depressuring Study IFB Outstanding PRO 30-May-23 0.05%
211 BMH-FED-SYN-00-P0-CA-006 KO Drum Calculation Report IFB Outstanding PRO 30-May-23 0.03%
212 BMH-FED-SYN-00-P0-CA-007 Closed Drain Vessel Calculation Report IFB Outstanding PRO 30-May-23 0.03%
213 BMH-FED-SYN-00-P0-CA-008 Open Drain Vessel Calculation Report IFB Outstanding PRO 30-May-23 0.03%
214 BMH-FED-SYN-00-P0-CA-009 Fuel Gas Scrubber & Filter Calculation Report IFB Outstanding PRO 30-May-23 0.03%
Daftar Dokumen 2 Minggu Kedepan
JOB 289-CTR 022 & CTR 039
PT Pertamina EP ZONA 7
FEED SP Bambu Merah - Pembangunan Fasilitas Baru SP BMH

Target
NO. CTR / Drawing No. Deliverables Action Discipline Remark Weight
Submission

215 BMH-FED-SYN-00-P0-CA-010 IA and UA Receiver Calculation Report IFB Outstanding PRO 30-May-23 0.03%
216 BMH-FED-SYN-00-P0-CA-011 Prod Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
217 BMH-FED-SYN-00-P0-CA-012 Test Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
218 BMH-FED-SYN-00-P0-CA-013 Diesel Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
219 BMH-FED-SYN-00-P0-CA-015 Service Water Tank Calculation Report IFB Outstanding PRO 30-May-23 0.02%
220 BMH-FED-SYN-00-P0-CA-016 Transfer Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
221 BMH-FED-SYN-00-P0-CA-019 Closed Drain Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
222 BMH-FED-SYN-00-P0-CA-020 Open Drain Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
223 BMH-FED-SYN-00-P0-CA-022 Diesel Transfer Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
224 BMH-FED-SYN-00-P0-CA-023 Deep Well Pump Calculation Report IFB Outstanding PRO 30-May-23 0.03%
225 BMH-FED-SYN-00-P0-CA-025 Line Sizing Calculation IFB Outstanding PRO 30-May-23 0.03%
226 BMH-FED-SYN-00-P0-PFD-001 Process Flow Diagram (Header Manifold and Separation) IFB Outstanding PRO 30-May-23 0.02%
227 BMH-FED-SYN-00-P0-PFD-002 Process Flow Diagram (Storage & Transfer System) IFB Outstanding PRO 30-May-23 0.02%
228 BMH-FED-SYN-00-P0-PFD-003 Process Flow Diagram (Gas & DHU System) IFB Outstanding PRO 30-May-23 0.02%
229 BMH-FED-SYN-00-P0-PID-001 P&ID Drawing Index IFB Outstanding PRO 30-May-23 0.03%
230 BMH-FED-SYN-00-P0-UFD-001 UFD -Firewater System IFB Outstanding PRO 30-May-23 0.03%
231 BMH-FED-SYN-00-P0-UFD-002 UFD - Instrument Air IFB Outstanding PRO 30-May-23 0.03%
232 BMH-FED-SYN-00-P0-UFD-003 UFD -Fuel Gas System IFB Outstanding PRO 30-May-23 0.03%
233 BMH-FED-SYN-00-P0-UFD-004 UFD - Power Gen System IFB Outstanding PRO 30-May-23 0.03%
234 BMH-FED-SYN-00-P0-UFD-005 UFD For Drain & Flare System IFB Outstanding PRO 30-May-23 0.03%
235 BMH-FED-SYN-00-P0-UFD-006 UFD Instrument Air System at Wellhead Facilities IFB Outstanding PRO 30-May-23 0.03%
236 BMH-FED-SYN-00-P0-DW-003 Process SAFE Chart Sheet 1 IFB Outstanding PRO 30-May-23 0.02%
237 BMH-FED-SYN-00-P0-DW-004 Process SAFE Chart Sheet 2 IFB Outstanding PRO 30-May-23 0.02%
238 BMH-FED-SYN-00-P0-DW-005 Process SAFE Chart Sheet 3 IFB Outstanding PRO 30-May-23 0.02%
239 BMH-FED-SYN-00-P0-DW-006 Process SAFE Chart Sheet 4 IFB Outstanding PRO 30-May-23 0.02%
240 BMH-FED-SYN-00-P1-PS-004 Environmental Philosophy IFB Outstanding SAF 30-May-23 0.03%
241 BMH-FED-SYN-00-L0-BD-001 Piping Basis of Design IFB Outstanding PIP 30-May-23 0.15%
242 BMH-FED-SYN-00-L0-SP-001 Specification for Piping Flexibility Analysis IFB Outstanding PIP 30-May-23 0.02%

10.53%