Project number Request number This request covers work completed through
601-6758-1901-0301
9 August 19, 2021
Project name
LASAM MEETINGHOUSE
Contractor Certificate Amount can be changed only by contractor; changes must be initialed and dated.
Starting date Contract days Original completion C.O. days Revised completion Amount of this request based on attached
date date schedule of values:
$ 1,622,851.08
14/10/2019 300 387
09/08/2020 31/08/2021
I, the contractor, certify that the above amount is true and correct, that it is due, and that all just and lawful offsets, payments and credits have been allowed.
Signature of contractor Title Date
Address
Caritan Norte
City State Zip
I, the architect, certify that the above named contractor on this project is entitled to payment of this amount: $ 1,622,851.08
Signature of architect/consultant Date
Owner's Approval
Project Manager
Next level supervisor's signature if applicable Title Date
Finance Information
$ Amount (s) GL BU Dept. Id. Account Project # Res Type Res Cat
1,803,167.86 CPB01 1831 601-6758-1901-0301 T30 C31
-180,316.79 CPB01 2114 601-6758-1901-0301 T00 C32
CPB01 1831 601-6758-1901-0301 T30 C60
CPB01
CPB01
Controllers Signature Date
Summary
Previous
Original Contract Change Orders Adjusted Contract Complete to Date % This Application Balance
Applications
24,407,771.00 24,407,771.00 15,083,732.03 0.62 30,877,004.69 1,803,167.86 9,324,038.97
Less retention / deficiencies -1,508,373.20 -1,328,056.42 -180,316.79 Choose method of Retention
Less liquidated damages for # of days Enter Amount
I, the architect, certify that the above named contractor on this project is entitled to payment of this amount: PHP 1,622,851.08
Signature of architect/consultant Date
Owner's Approval
Project Manager
Next level supervisor's signature if applicable Title Date
PHP Amount (s) GL BU Dept ID Account Product Project ID Activity ID Resource Type Resource Category
Summary
Previous
Original Contract Change Orders Adjusted Contract Complete to Date % This Application Balance
Applications
24,407,771.00 0.00 24,407,771.00 15,083,732.03 61.80% 13,280,564.17 1,803,167.86 9,324,038.97
Less retention / deficiencies
Less liquidated damages for # of days
Other Deductions
Other Additions
Amount approved and due to contractor this request
Explanation of other additions and deductions
Project: LASAM MEETINGHOUSE Project # 601-6758-1901-0301 Request # 9 Vicente "Vicson" Soriano Jr.
Change Order Adjusted Contract
Div. Item Description of Work Contract Amount Previous Application This Application Completed to Date % Complete Balance
Totals Amount
31 1 Off-site Earthwork 893,209.00 893,209.00 568,727.00 190,500.65 759,227.65 0.85 133,981.35
33 2 Off-Site Utilities
32 3 Off-Site Asphalt/Concrete Paving
32 4 Off-Site Concrete
01 5 Temporary Site Fencing
02 6 Demolition
01 7 Engineering
31 8 Earthwork - Grading & Pad 4,063,848.54 4,063,848.54 3,657,463.68 284,469.40 3,941,933.09 0.97 121,915.46
33 9 Site Utilities (to within 5' of wall) 4,155,812.72 4,155,812.72 1,246,743.82 415,581.27 1,662,325.09 0.40 2,493,487.63
32 10 Asphalt/Concrete Paving 2,067,420.77 2,067,420.77 1,635,269.91 1,635,269.91 0.79 432,150.86
31 11 Termite Control
32 12 Site Concrete 1,093,313.58 1,093,313.58 163,997.04 163,997.04 0.15 929,316.54
10 13 Site Signage
32 14 Fencing (Site & Screen walls)
26 15 Site Lighting
32 16 Landscape / Irrigation 446,506.00 446,506.00 446,506.00
31 17 Footing. Excavation/Backfill
03 18 Reinforcing Steel
03 19 Concrete Ftg/Stems/Slab
07 20 Bituminous Damp proofing
04 21 Masonry 495,855.02 495,855.02 483,978.66 11,876.36 495,855.02 1.00 0.00
04 22 Stone Sign
04 23 Cut Stone 50,054.69 50,054.69 50,054.69
06 24 Fiberglass
05 25 Structural & Misc. Steel 3,564,013.89 3,564,013.89 3,492,733.61 71,280.27 3,564,013.89 1.00 0.00
06 26 Rough Carpentry, Labor/Material. 596,706.88 596,706.88 59,670.69 59,670.69 0.10 537,036.20
06 27 Wood Trusses & Joists
07 28 Laminated Vapor Retarder
07 29 Insulation 47,945.73 47,945.73 47,945.73 47,945.73 1.00 0.00
07 30 Air Infiltration Barrier
07 31 EIFS
07 32 Roof Tiles or Shingles
07 33 Flashing and Sheet Metal
07 34 Fire stopping
07 35 Joint Sealants
10 36 Steeple
06 37 Millwork & Finish Carpentry
06 38 Doors, Frames & Hardware 222,428.66 222,428.66 22,242.87 22,242.87 0.10 200,185.79
08 39 Access Doors & Panels 555,348.75 555,348.75 277,674.38 55,534.87 333,209.25 0.60 222,139.50
08 40 Sect. Overhead Doors
08 41 Storefronts
08 42 Windows 175,858.46 175,858.46 140,686.77 17,585.84 158,272.61 0.90 17,585.85
09 43 Gypsum Drywall 535,751.34 535,751.34 140,902.60 234,123.34 375,025.94 0.70 160,725.40
09 44 Ceramic Tile 552,400.59 552,400.59 552,400.59
09 45 Acoustical Ceiling Tile 677,047.77 677,047.77 677,047.77
09 46 Wood Flooring
09 47 Resilient Flooring & Base
09 48 Floor Preparation
09 49 Acoustical Wall Panels
Page 3 of 4
09 50 Paint & Wall Coverings 1,069,071.47 1,069,071.47 320,721.45 320,721.45 0.30 748,350.03
09 51 Chalk/Tack/Appliances/Rost/Sign Labor 260,035.78 260,035.78 260,035.78
10 52 Metal Toilet Partitions & Accessories
10 53 Fire Extinguishers
10 54 Accordion Folding Partitions
10 55 Misc. Specialties 89,416.32 89,416.32 89,416.32
11 56 Athletic Equipment
12 57 Draperies
01 58 Test, Adjust & Balance Mechanical 85,972.67 85,972.67 85,972.67
21 59 Fire Suppression 19,462.51 19,462.51 19,462.51
22 60 Plumbing 293,102.61 293,102.61 205,171.83 205,171.83 0.70 87,930.78
23 61 HVAC 69,063.32 69,063.32 69,063.32
26 62 Electrical 904,942.85 904,942.85 271,482.86 45,247.14 316,730.00 0.35 588,212.85
27 63 Sound & Satellite Systems 312,181.09 312,181.09 312,181.09
00 64 General Conditions 1,111,000.00 1,111,000.00 996,233.70 25,886.30 1,022,120.00 0.92 88,880.00
00 65 Insurance
00 66 Payment & Performance Bonds
67 Building Permits
68 Taxes paid on behalf of Owner
69 Fees paid on behalf of Owner
70 Other Reimbursable Costs
71 Contractor's Fee
Total 24,407,771.00 24,407,771.00 13,280,564.17 1,803,167.86 15,083,732.03 0.62 9,324,038.97
Page 4 of 4
ROGELIO M. DIMAANDAL CONSTRUCTION
Caritan Norte – Atulayan Boundary,
Tuguegarao City, Cagayan Email Add: rmdc47@yahoo.com
Tel No. (078) 846-3978
Tel Fax. (078) 846-4794
To : FINANCE DEPARTMENT
The Area Pres CJCLDS., Phils., Inc.
#13 Temple Drive cor Whiteplains, Greenmeadows
Quezon City, Metro Manila
The undersigned respectfully request for 9th Billing for Lasam new meetinghouse facility in
the amount of One Million Eight Hundred Three Thousand One Hundred Sixty-Seven
and 86/100 (Php 1,803,167.86) for 61.80% Accomplishment.
RHYAN C. DIMAANDAL
AGM
THE CHURCH OF MANILA ADMINISTRATION OFFICE
Temple Drive, Cor. White Plains Avenue Greenmeadows, Quezon City
JESUS CHRIST 1100
OF LATTER-DAY SAINTS Tel. No. 635-9169, 635-9164 (Direct Line)
Fax No. 635-9131 (Auto Fax)
E. Retention
1. Invoice
2. Check Requisition
3. Letter to release retention
4. Utility Clearance from FM
5. Warranty Bond
6. Final Acceptance Certicifate
7. Project tracker
: Make sure that all requirements are attached. Billings with incomplete requirement(s) will not be processed until
NOTE it is complied.
REMARKS
EXTENSION OF COVER
==================
FROM: OCTOBER 14, 2019 - AUGUST 09, 2020
TO: AUGUST 09, 2020 - AUGUST 31, 2021
In view thereof, there is additional premium amounting Php 59,769.81 (inclusive of taxes)
EXCEPT AS HEREIN VARIED, ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
Attached to and forming part of EN-EAR-HO-19-0000595-00 Page 2 of 2
14,378.34
Important:
NOTE: Should the policy be cancelled or endorsed to a lower value, the insured is still liable to pay the full amount
of the documentary stamps as stipulated in the policy prior to cancellation/endorsement.
This is a system generated form and if issued without any alteration, this does not require signature.
KHERNA - 05/05/2021
9
INVOICE
8,496.50
Important:
NOTE: Should the policy be cancelled or endorsed to a lower value, the insured is still liable to pay the full amount
of the documentary stamps as stipulated in the policy prior to cancellation/endorsement.
This is a system generated form and if issued without any alteration, this does not require signature.
KHERNA - 05/05/2021
5