SIDDHARTH CONSTRUCTION

SUB CONTRACT WORK BILL SUMMARY


For Payment to Sub Contractor by Siddharth Construction
1.1 Work Order No. & Date (original) 1009/VCIPL-SC(JV)/WO/2019/05 Date : 19.03.2019
1.3 Work Order Approval Status Approval level : Site Approved
1.4 SC Work Period - From and To 25.01.2019 to 30.03.2019
2.1 Name of the Sub Contractor M/s SANJAY
Vill AlagatpurBROTHERS
PO-Suras Camperirganj
2.2 Address of the Sub Contractor Gorakhpur
2.3 PAN # of Sub Contractor ACTPY4488M
2.4 GSTIN # of Sub Contractor 09ACTPY4488M3Z3
3.1 Bill Period : From 25.01.2019 to 30.03.2019
3.2 Running Bill Detail : Bill No. 1 Bill Date 30.03.2019
Sl Upto Previous For This Upto date
Description Reference
No Bill Amount Bill Amount Bill Amount
4.01 Value of Sub Contract Work Measured Bill Detail - 805,560 805,560
4.02 Add CGST 9% Gov. Norms - 72,500 72,500
4.02 Add SGST 9% Gov. Norms - 72,500 72,500
4.04 Gross Total Value - 950,561 950,561
4.05 TDS @ 2% Gov. Norms 16,111 16,111
4.06 Recoveries in Debit Notes Debit Notes - 118,420 118,420
4.07 Recovery of Work Advance Accounts Dept. - 200,000 200,000
4.08 Recovery WCT @ 4% On 4.01 - - -
4.09 Recovery of Retention @ 5% On 4.01 WO - 40,278 40,278
4.10 Net Total Value - 575,752 575,752
Total In Words Rs Five Lakhs Seventy Five Thousand Seven Hundred Fifety Two Only

Accepted for Sub Contractor For Siddharth Construction


Prepared by Certified by Verified by Approved by

Chief Pjoject Co-


Authorized Signatory
Manager -QS SPM Ordinator Managing Director
Document No. 01 Distribution : S/C Copy Siddharth Cons.
SIDDHARTH CONSTRUCTION

Four laining laning of Jungle -kaudiya To Mohaddipur Chowk Road Section of NH-24
from km 81.420 to km 98.935

SUB CONTRACT RA BILL -01/Final


1 Work Order No. & Date 1009/VCIPL-SC(JV)/WO/2019/05 19.03.2019

2 Type of Sub Contract Construction of Earthwork

3 SC Work Period - From and To 25.01.2019 To 30.03.2019


4 Name of the Sub Contractor M/s SANJAY BROTHERS
Vill Alagatpur PO-Suras Camperirganj
5 Address of the Sub Contractor Gorakhpur

Contact No. 9452817772


6 PAN # of Sub Contractor ACTPY4488M
7 GSTIN # of Sub Contractor 09ACTPY4488M3Z3
SUMMARY MEASUREMENTS
Sl Item Description Unit Length Width Depth Quantity Rate Amount
1 Supply of approved material from borrow pits with all lifts
and leads transporting to site for earthwork in CUM - - -
embankment
81+920 To 82+140 LHS CUM 220.00 9.00 1.70 3,366.00 140.00 471,240.00
82+140 To 82+620 LHS CUM 480.00 8.00 0.50 1,920.00 140.00 268,800.00
83+300 To 83+360 LHS CUM 60.00 4.50 0.40 108.00 140.00 15,120.00
83+400 To 83+520 LHS CUM 120.00 8.00 0.20 192.00 140.00 26,880.00
83+570 To 83+690 LHS CUM 120.00 7.00 0.20 168.00 140.00 23,520.00
2 Supply of approved material from borrow pits with all lifts
and leads transporting to site for earthwork in Subgrade CUM - - - - 140.00 -
Top
Note:- This Bill May Be Considerd as RA BILL for payments To contrator on prelimary basis any
amount in excess paid will adjusted from next RA Bill.
Total Value Of Wortk Done 805,560.00
Accepted for Sub Contractor For Siddharth Construction
Prepared by Certified by Verified by Approved by

Chief Project
Authorized Signatory DPM-Highway SPM
Coordinator
Manager -QS
Document No. 1 Distribution : S/C Copy Siddharth Cons.
SIDDHARTH CONSTRUCTION
Debit Note
R.N. TRADERS
Debit For Desiel Issued
Sr No. Date Qty.( Liters) Rate Amount. Remarks
1 3/11/2019 400 66.33 26532
2 3/17/2019 400 66.06 26424
3 3/25/2019 600 65.50 39300
4 3/28/2019 400 65.41 26164

Total To be Debited INR 118,420.00