Question Text:
A person is said to be not employed in the mine
Options:
(1) who works as a manager
(2) who works under appointment by the Manager
(3) who works in any office of the mine
(4) who works as a pump operator in a residential colony belonging to the mine
(5) who works in siding with in premises of the mine
Options:
(1) 100
(2) 300
(3) 500
(4) 1000
(5) 1500
Options:
(1) 100
(2) 150
(3) 200
(4) 250
(5) 500
Options:
(1) 50
(2) 75
(3) 100
(4) 150
(5) 200
Options:
(1) 10
(2) 14
(3) 15
(4) 20
(5) 25
Options:
(1) Form-C
(2) Form-D
(3) Form-E
(4) form-F
(5) Form-B
Options:
(1) 14-16
(2) 16-18
(3) 15-18
(4) 14-18
(5) 18-20
Options:
(1) Form-G&H
(2) Form-C&D
(3) Form-A&B
(4) Form-C&B
SMC-Mine Management, Legislation & General Safety
(5) Form-B&D
Options:
(1) 3
(2) 1
(3) 6
(4) 2
(5) 12
Options:
(1) 10
(2) 20
(3) 30
(4) 60
(5) 40
Options:
(1) 3 days
(2) 15 days
(3) 24 hours
(4) 48 hours
(5) 1 month
Options:
(1) Certificate of Age
(2) Certificate of Fitness
(3) Character Certificate
(4) Experience Certificate
(5) Domicile Certificate
Options:
(1) 60 days
(2) 30 days
(3) 90 days
(4) 1 year
(5) 45 days
Options:
(1) inspect the site of accident
(2) notify to RIM
(3) conduct investigation himself
(4) ensure that the place of accident is not disturbed
(5) get a plan of site of accident prepared
Options:
(1) Manager
(2) CMD of the company
(3) Engineer
(4) Director Personnel of the Company
(5) Central Government
Options:
(1) 10%
(2) 15%
(3) 20%
(4) 5%
(5) 30%
Options:
(1) Timber man
(2) Coal driller
(3) Track Layers
(4) Mine Managers
(5) Haulage attendents
Options:
(1) 3
(2) 2
(3) 1
(4) 0
(5) Not required
Options:
(1) 5 years
(2) 1 year
(3) 2 years
(4) 3years
(5) 4years
Options:
(1) 10m
(2) 8m
(3) 7m
SMC-Mine Management, Legislation & General Safety
(4) 5m
(5) 4m
Options:
(1) 15 & RIM
(2) 15 & CIM
(3) 7 & RIM
(4) 7 & CIM
(5) 30 & RIM
Options:
(1) double
(2) equal
(3) half
(4) one and half
(5) three-fourth
Options:
(1) Safety goggles
(2) resuable ear plugs
(3) visible harness
(4) dust respirators
(5) mobile phones
Options:
(1) a forcing fan used in belowground
(2) forcing fan used in aboveground
(3) a booster fan used in belowground
(4) a booster fan used in aboveground
(5) a main mechanical ventilator
Options:
(1) Approval by CIM
(2) Notified in official gazettee
(3) Tested by approved laboratory
(4) To be used with an electronic detonator
(5) To be used with detonating fuse
Options:
(1) Pneumoconiosis
(2) Silicosis
(3) Asbestosis
(4) Noise Induced Hearing Loss
(5) Tuberculosis
Options:
(1) 4 & 3
(2) 6 & 5
(3) 2 & 1
(4) 5 & 4
(5) 3 & 2
Options:
(1) Imparting initial training in rescue & recovery
(2) Imparting refresher training to rescue trained person
(3) Providing support during rescue & recovery
(4) Carry out functin of resuce room
(5) Imparting vocational training
Options:
(1) 45
SMC-Mine Management, Legislation & General Safety
(2) 90
(3) 40
(4) 30
(5) 60
Options:
(1) CO
(2) CO2
(3) O2
(4) CH4
(5) Black damp
Options:
(1) 100 mm
(2) 25 mm
(3) 50 mm
(4) 75 mm
(5) 60 mm
Options:
(1) poor quality and paucity of long props
(2) difficulty in dressing and checking
(3) difficulty in supporting the roof
(4) difficulty in checking accumulation of gas
(5) higher rate of production
Options:
(1) Independent
(2) Interlocked
(3) dependent
(4) All the Options
(5) None of the Options
Options:
(1) Accidental disconnection
(2) shock
(3) transmission alongwith the apparatus
(4) mechanical injury
(5) short circuit
Options:
(1) 1%
(2) 10%
(3) 5%
(4) 7%
(5) 3%
Options:
(1) 1.5m
(2) 3m
(3) 0.5m
(4) 1.2m
(5) 2.5m
Options:
SMC-Mine Management, Legislation & General Safety
(1) 15
(2) 20
(3) 25
(4) 30
(5) 10
Options:
(1) DGMS Standards
(2) BIS Standards
(3) Central Electricity Authority
(4) Manual of the manufacturer
(5) Requirement of the mining company
Options:
(1) FLP
(2) Intrinsically Safe
(3) Both FLP and Intrinsically Safe
(4) None
(5) 30 v
Options:
(1) 90
(2) 60
(3) 30
(4) 45
(5) 1 year
Options:
(1) Area Laboratory
(2) Rescue Station
(3) Central Institute of Mining & Fuel Research
(4) National mineral laboratory
(5) Central Mechanical Engineering Research Institute
SMC-Mine Management, Legislation & General Safety
Correction Answer : Option No.(3)
Question Text:
Which of the the following statement is wrong . The incumbustible dust used for treatment of
coal dust shall
Options:
(1) not contain more than 5% of free silica content
(2) be readily dispersible in air
(3) not cake
(4) be light in colour
(5) be able to absorb moisture
Options:
(1) date of last removal of stone dust
(2) reference number of of the barrier
(3) date of last inspection by VO
(4) signature of VO
(5) date of supply of stone dust
Options:
(1) Rate of rise of water level in the river adjacent to the mine
(2) Time taken in reaching withdrawal order to farthest working points of the mine
(3) Time taken for withdrawal of persons to surface
(4) Pumping capacity of the mine
(5) Margin of safety
Options:
(1) 15m/m
(2) 20m/min
(3) 30m/min
(4) 25m/min
SMC-Mine Management, Legislation & General Safety
(5) 10m/min
Options:
(1) 13m/min
(2) 20m/min
(3) 30m/min
(4) 25m/min
(5) 10m/min
Options:
(1) GM, 25 day
(2) agent, 21 days
(3) manager, 30 days
(4) ventilation officer, 30 days
(5) Safety officer, 21 days
Options:
(1) 10
(2) 12
(3) 15
(4) 24
(5) 20
Options:
(1) 10
(2) 15
(3) 24
(4) 20
(5) 18
SMC-Mine Management, Legislation & General Safety
Correction Answer : Option No.(3)
Question Text:
Air in the return airway of every depillaring district shall be completely analysed once at least
_____ with a view to determine__________
Options:
(1) 45 days & Graham's ratio
(2) 30 days & Graham's ratio
(3) 60 days & Yomeg's ratio
(4) 30 days & Black damp
(5) 45 days & black damp
Options:
(1) 3 mg/m3
(2) 4.5mg/m3
(3) 6mg/m3
(4) 2 mg/m3
(5) 3.5 mg/m3
Options:
(1) increasing rpm of the drill motor
(2) using sharp bits
(3) increasing the voltage of drill machine
(4) reducing the dia of drill bit
(5) decreasing the r.p.m.
Options:
(1) 2.75m
(2) 2.81m
(3) 2.5m
(4) 1.8m
(5) 2.0m
Options:
(1) 1.5m
(2) 1.44m
(3) 1.8m
(4) 1.0m
(5) 1.75
Options:
(1) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and pump it into rivers nearby.
(2) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into an effluent
(3) The effulent treatment plant is a plant to treat the water coming from different sources
(4) The effulent treatment plant is a plant to treat the waste materials coming from different areas
of the plant and make it into a cleaner.
(5) The effulent treatment plant is a plant to treat the effulent coming from different areas of the
plant and make it into a cleaner and more environmental fiendly effluent
Options:
(1) Involves planning all activities required before, during, and after the operating of a mine to
reclaim land socially and economically.
(2) Involves planning all activities required before operating of a mine to reclaim land.
(3) Involves planning all activities required during and after the operating of a mine to reclaim
land.
(4) Involves planning all activities required after the operating of a mine to reclaim land socially
and economically.
(5) Involves planning of all activities required before, during, and after the operating of a mine.
Options:
(1) Rule based and reactive
(2) Documented and reactive
(3) Auditable and Docmented
(4) Risk based and Reactive
(5) Auditable and reactive
Options:
(1) Tachoemetry
(2) Plane Tabling
(3) Chaining
(4) Compass Surveying
(5) All the Options
Options:
(1) 20 cm
(2) 30 cm
(3) 35 cm
(4) 40 cm
(5) None of the Options
Options:
(1) Profile levelling
(2) Reciprocal levelling
(3) Vertical Angles
(4) Contouring
(5) None of the Options
Options:
(1) Horizontal angle only
(2) Vertical angle only
(3) Horizontal and Vertical angles
(4) both angle and distance
(5) None of the Options
Options:
(1) Sighting the object
(2) Centering
(3) Transferring of the ground point
SMC-Mine Surveying
(4) Making perpendicular offsets
(5) None of the Options
Options:
(1) Roof of working
(2) side of gallery
(3) floor of working
(4) roof and floor both
(5) None of the Options
Options:
(1) Only at a vertical cliff
(2) Only at an overhanging cliff
(3) Only at a valley
(4) Only at a depression
(5) None of the Options
Options:
(1) At least two
(2) At least three
(3) At least four
(4) At least five
(5) At least one
Options:
(1) is rigidly fixed with the level tube
(2) is capable of some movement with respect to the level tube in vertical plane
(3) can rotate upto 90° in vertical plane
(4) can rotate freely in vertical plane
(5) None of the Options
Options:
(1) length
(2) elevation
(3) bearing
(4) latitude
(5) None of the Options
Options:
(1) 5 m
(2) 2 m
(3) 3 m
(4) 4 m
(5) None of the Options
Options:
(1) Distance between two stations
(2) intervisibility
(3) Intervisibility and well-conditioned triangle
(4) Accessibility and distance
(5) None of the Options
Options:
(1) Only a backsight is taken
(2) Only a foresight is taken
(3) Both foresight and backsight are taken
(4) An intersight is taken
(5) None of the Options
SMC-Mine Surveying
Correction Answer : Option No.(3)
Question Text:
Prismatic compass gives the
Options:
(1) Quadrantal Bearing
(2) Reduced Bearing
(3) Whole circle Bearing
(4) Quadrantal and Reduced Bearing
(5) None of the Options
Options:
(1) city surveys
(2) guide map surveys
(3) topographical surveys
(4) cadastral surveys
(5) hydrographical survey
Options:
(1) Lehmann's rule
(2) Slide rule
(3) Bowditch's rule
(4) Simpson's rule
(5) Trapezoidal rule
Options:
(1) Chain surveying
(2) Traversing
(3) Contouring
(4) Plane table surveying
(5) None of the Options
Options:
(1) Linear coordinates
SMC-Mine Surveying
(2) Plane coordinates
(3) Spherical coordinates
(4) Angular coordinates
(5) None of the Options
Options:
(1) isogonic line
(2) Agonic line
(3) Dip line
(4) Contour line
(5) None of the Options
Options:
(1) Higher level to lower level
(2) Lower level to higher level
(3) Part to whole
(4) Whole to part
(5) Part to whole and Whole to part
Options:
(1) Horizontal Surface
(2) Inclined Surface
(3) Flat Surface
(4) Level Surface
(5) None of the Options
Options:
(1) Auto Level
(2) Tilting Level
(3) Dumpy Level
(4) Y- level
(5) None of the Options
Options:
(1) The angle between two lines measured on horizontal plane
(2) The angle between north direction and a line
(3) The angle between horizontal line and any other line measured along vertical plane
(4) The angle between any two lines measured along vertical plane
(5) None of the Options
Options:
(1) Elimination of Parallaxes
(2) Centering
(3) Levelling
(4) Adjustment of Plate Bubble
(5) None of the Options
Options:
(1) valley
(2) ridge
(3) vertical cliff
(4) steep slope
(5) none
Options:
(1) Forward staff point is lower than the back staff point
(2) Different in level cannot be ascertained
(3) Back staff point is lower than the forward staff point
(4) Back and forward staff points are at the same elevation
(5) None of the Options
Options:
(1) lower elevation that of bench mark
(2) higher elevation that of bench mark
(3) same elevation that of bench mark
SMC-Mine Surveying
(4) insufficient data to interpret the result
(5) None of the Options
Options:
(1) Sum of foresights - Sum of backsights = Last R. L. - First R. L
(2) Sum of backsights - Sum of foresights = Last R. L. - First R. L.
(3) Sum of backsights - Sum of foresights = First R. L. - Last R. L.
(4) Sum of backsights - Sum of foresights = Sum of rises - Sum of falls
(5) None of the Options
Options:
(1) Distance between stadia wires equal to zero
(2) Multiplying constant equal to 100
(3) Additive constant equal to focal length
(4) Additive constant equal to zero
(5) Multiplying constant equal to 100 and Additive constant equal to zero
Options:
(1) amplitude modulation
(2) frequency modulation
(3) amplitude and frequency modulation
(4) All the Options
(5) None of the Options
Options:
(1) Gradiometer is used for setting out any required gradient
(2) Cross staff is used for setting out right angles
(3) Box sextant is used for the measurement of horizontal angles
(4) Optical square is used for setting out right angles
(5) All the Options
Options:
(1) U - fork
(2) Alidade
(3) Optical square
(4) Optical plummet
(5) All of the above
Options:
(1) (N - 1) x 90°
(2) (N + 1) x 90°
(3) (2N - 4) x 90°
(4) (2N + 1) x 90°
(5) None of the Options
Options:
(1) Collimation error
(2) Plate level error
(3) Graduation error
(4) All the Options
(5) None of the Options
Options:
(1) Auto Level
(2) Digital Level
(3) Tilting Level
(4) Dumpy Level
(5) None of the Options
SMC-Mine Surveying
Correction Answer : Option No.(3)
Question Text:
Two mirrors are used for offsetting in
Options:
(1) Cross-staff
(2) Optical square
(3) Miner's dial
(4) Prism compass
(5) Cross-staff and Optical square
Options:
(1) Atmospheric window
(2) Signature
(3) Radiometric error
(4) None of the Options
(5) All the Options
Options:
(1) Total Station
(2) DGPS
(3) Digital Level
(4) Laser scanners
(5) Gyro-theodolites
Options:
(1) 235 m
(2) 235.293 m
(3) 234.706 m
(4) 244 m
(5) None of the Options
Options:
SMC-Mine Surveying
(1) 8700
(2) 17400
(3) 34800
(4) 39000
(5) None of the Options
Options:
(1) 43.75
(2) 35.2
(3) 25.1
(4) 56.25
(5) None of the Options
Options:
(1) 90°
(2) 120°
(3) 210°
(4) 270°
(5) 180°
Options:
(1) 0.88 cm
(2) 0.0904 cm
(3) 0.513 cm
(4) 3.96 cm
(5) None of the Options
Options:
(1) (i), (ii) and (iii)
(2) (i) and (iv)
(3) (i) and (ii) only
(4) (ii), (iii), (iv)
(5) None of the Options
Options:
(1) 1:5000
(2) 1: 100000
(3) 1: 50000
(4) 1:10000
(5) None of the Options
Options:
(1) 3.39 m
(2) 21.61 m
(3) 25.0 m
(4) 28.39 m
(5) None of the Options
Options:
(1) each of the whole circle reckoning has to be micros by 10°
(2) in the Quadrantal method, the correction is positive in the 1st and 3rd quadrants
(3) in the Quadrantal method, the corrections is negative in 2nd and 4th quadrants
(4) All the Options
(5) None of the Options
Options:
(1) + 50 m, + 86.6 m
(2) + 86.6 m, - 50 m
(3) + 50 m, - 86.6 m
SMC-Mine Surveying
(4) + 70.7 m, - 50 m
(5) None of the Options
Options:
(1) 4.5 hectares
(2) 3.6 hectares
(3) 1.8 hectares
(4) 1.2 hectares
(5) None of the Options
Options:
(1) 30 m
(2) 25 m
(3) 20 m
(4) 15 m
(5) None of the Options
Options:
(1) 145° 30'
(2) 153° 50'
(3) 63° 50'
(4) 65° 30'
(5) None of the Options
Options:
(1) i ⁄ f
(2) f ⁄ i
(3) i+f
(4) ixf
(5) None of the Options
Options:
(1) 455.53 sq. m
(2) 453.55 sq. m
(3) 456.55 sq. m
(4) 545.53 sq. m
(5) None of the Options
Options:
(1) 50 m
(2) 25 m
(3) 10 m
(4) 100 m
(5) None of the Options
Options:
(1) 19° 30'
(2) 109° 30'
(3) 160° 30'
(4) 199° 30'
(5) None of the Options
Options:
(1) 1:5000
(2) 1:1000
(3) 1 :4000
(4) 1:3000
(5) 1:2000
Options:
(1) A, B, C
(2) A, C, D
(3) B, D, E
(4) A, D, E
(5) C, D, E
Options:
(1) The rise-and-fall method of booking is recommended as it is affords a complete arithmetical
check on all the observations
(2) Although the Height of Collimation method appears superior where there are a lot of
intermediate sights, there is no simple straightforward check on their reduction
(3) Height of Collimation method is useful when setting out levels on site
(4) The compensator has a wide working range. Even If the circular bubble is too much out of
adjustment, it will not result in tilt of the line of collimation
(5) None of the Options
Options:
(1) 25
(2) 32
(3) 40
(4) 45
(5) 50
Options:
(1) 0.1
(2) 0.2
(3) 0.3
(4) 0.4
(5) None of the Options
Options:
(1) increase by 1.5 times
(2) decrease by 1.5 times
(3) increase by 2.25 times
(4) decrease by 2.25 times
(5) No change
Options:
(1) 200
(2) 284
(3) 350
(4) 400
(5) 568
Options:
(1) 5
(2) 6.24
(3) 11.6
(4) 14
(5) None of the Options
Options:
(1) The auxiliary fan requires earthing
(2) The auxiliary fan should not suck more than 50% of the available air.
(3) Two auxiliary fans can not be installed in district without permission of RIM
(4) Auxiliary fan is installed in a district to increase the air quantity in the district.
(5) Auxiliary fan should not be stopped without the permission of authorised person nominated
for this purpose.
Options:
(1) increased by 1.1 times
(2) decreased by 1.1 times
(3) 1ncreased by 1.33 times
(4) decresed by 1.33 times
(5) decreased by 1.47 times
Options:
(1) 1
(2) 2
(3) 3
(4) 4
(5) 5
Options:
SMC-Mine Ventilation, Fires, Explosion & Inundation
(1) 13
(2) 36/13
(3) 36/25
(4) 25/36
(5) 13/36
Options:
(1) 33
(2) 16.2
(3) 12.5
(4) 9.2
(5) 6.3
Options:
(1) CH4
(2) CO₂
(3) N₂
(4) O₂
(5) CO₂ and N₂
Options:
(1) pressure drop between any two locations
(2) mine air resistance
(3) air temperature
(4) air velocity
(5) None of the Options
Options:
(1) A heavy roof fall has occurred in the main return airway.
(2) A heavy roof fall has occurred in the main intake airway.
(3) Heavy leakages of air through pit bottom door or surface airlock
(4) Power factor of the supply system has reduced
(5) None of the Options
SMC-Mine Ventilation, Fires, Explosion & Inundation
Correction Answer : Option No.(3)
Question Text:
In auxiliary ventilation, exhaust system is adopted where the main problem is _______
Options:
(1) heat
(2) methane layering
(3) heat and methane layering
(4) respirable dust
(5) None of the Options
Options:
(1) Ventilation officer
(2) Safety officer
(3) Manager
(4) Regional Inspector
(5) None of the Options
Options:
(1) 120
(2) 90
(3) 12
(4) 9
(5) none
Options:
(1) 50 - 100
(2) 20 - 50
(3) 10-20
(4) <10
(5) None of the Options
Options:
(1) 3
(2) 2.6
(3) 2.4
(4) 2
(5) 1.8
Options:
(1) to store waste material of the mine
(2) to store inflammable material like grease, lubricant oil etc.
(3) to store waste material and inflammable materials
(4) to take shelter in the event of fire/explosion
(5) None of the Options
Options:
(1) decreases
(2) increases
(3) remain same
(4) initilly decreases and then increases.
(5) initilly increases and then decreases.
Options:
(1) the time required for reaction of oxygen and methane
(2) time required for absorption of definite amount of heat.
(3) the time required for reaction between oxygen and methane and for absorption of definite
amount of heat.
(4) Presence of other gas
(5) None of the Options
Options:
(1) kind of dust
(2) fineness of dust
(3) presence of moisture
SMC-Mine Ventilation, Fires, Explosion & Inundation
(4) kind of dust, fineness of dust and presence of moisture
(5) None of the Options
Options:
(1) 268
(2) 200
(3) 134
(4) 67
(5) None of the Options
Options:
(1) using a duct of very long length
(2) using a large diameter duct
(3) increasing the flow of air through the duct
(4) using a duct having corrugated internal surface
(5) None of the Options
Options:
(1) reducing the pressure development in fan
(2) by reducing the resistance of the mine
(3) reducing the pressure development in fan and by reducing the resistance of the mine
(4) by increasing the rpm of the fan
(5) None of the Options
Options:
(1) angle between the drag component and the lift component of the force acting on the aerofoil.
(2) angle between the chord of the aerofoil and the direction of the average relative velocity of air
(3) the angle between the undistirbed actual air velocity and width of the aerofoil
(4) the maximum distance between mean line to chord of aerofoil
(5) None of the Options
Options:
(1) increasing the total air volume
(2) reducing the toxic gases in the mine atmosphere
(3) adding to natural ventilation by reducing the density in return air
(4) increasing the percentage of oxygen in the district
(5) None of the Options
Options:
(1) atmospheric pressure
(2) absolute pressure
(3) gauge pressure
(4) total pressure
(5) None of the Options
Options:
(1) Ignition test
(2) Accumulation test
(3) Percentage test
(4) Sensitivity test
(5) None of the Options
Options:
(1) Atkinson's equation
(2) Pythagorus equation
(3) Simon's equation
(4) Le chatelier equation
(5) None of the Options
Options:
(1) wet bulb temperature
(2) dry bulb temperature
(3) cooling rate
(4) heat convection
(5) None of the Options
SMC-Mine Ventilation, Fires, Explosion & Inundation
Options:
(1) More
(2) Less
(3) May be more or less
(4) Does not change
(5) None of the Options
Options:
(1) 27 cms
(2) 38 cms
(3) 35 cms
(4) 47 cms
(5) None of the Options
Options:
(1) Measurement of air velocity in mine air
(2) Measurement of air pressure
(3) Measurement of air velocity in ducts
(4) Measurement of static pressure in ducts
(5) None of the Options
Options:
(1) Anemometer
(2) Velometer
(3) Psychrometer
(4) Manometer
(5) None of the Options
Options:
SMC-Mine Ventilation, Fires, Explosion & Inundation
(1) 1°C/ 15m
(2) 1°C/ 92m
(3) 1°C/ 38m
(4) 1°C/ 72m
(5) None of the Options
Options:
(1) 3, 0.5, 5, Incombustible
(2) 2, 0.5, 5, Incombustible
(3) 2, 1, 4.5, Combustible
(4) 2,1, 4.5, Incombustible
(5) 3, 1, 4.5 , Incombustible
Options:
(1) 0.1-5.0
(2) 0.1-4.0
(3) 0.1-10.0
(4) 1.25-4.0
(5) 1.5-10.0
Options:
(1) Methane concentration
(2) CO concentration
(3) CO2 concentration
(4) H2S concentration
(5) SO2
Options:
(1) Chief Inspector of Mines
(2) Regional Inspector of Mines
(3) Both Chief Inspector and Regional inspector
(4) Inspector of Mines
(5) None of the Options
SMC-Mine Ventilation, Fires, Explosion & Inundation
Options:
(1) Shaft used to ascend the manpower
(2) shaft used to ascend material
(3) shaft used to ascend coal
(4) shaft only used for ventillation purpose
(5) shaft used to ascend air
Options:
(1) 1.10%
(2) 1.25%
(3) 1.00%
(4) 1.05%
(5) 0.50%
Options:
(1) 30 cm
(2) 38 cm
(3) 35 cm
(4) 40 cm
(5) 50 cm
Options:
(1) Black Damp
(2) Fire Damp
(3) After Damp
(4) Stink Damp
(5) None of the Options
Options:
(1) oxidation of coal
(2) Decomposition of organic substances
(3) Burning of coal
(4) decay of timber
(5) None of the Options
Options:
(1) Exhausting
(2) Overlapping
(3) Reversible
(4) Irreversible
(5) None of the Options
Options:
(1) Dust containing free crystalline silica
(2) asbestos fibres
(3) Non-fibrogenous dust
(4) radon
(5) None of the Options
Options:
(1) It increases overall quantity in the main fan
(2) Overall resistance to the airflow reduces
(3) It helps to provide fresh air to each districts
(4) It increases overall quantity of air, reduces resistance to airflow and helps to provide fresh air
to each districts
(5) None of the Options
SMC-Mine Ventilation, Fires, Explosion & Inundation
Options:
(1) Neutral point
(2) Stall point
(3) Operating point
(4) Neutral point and Stall point
(5) None of the Options
Options:
(1) 1.77 R
(2) 0.177 R
(3) 0.05625R
(4) 0.5625R
(5) None of the Options
Options:
(1) 15
(2) 12
(3) 10
(4) 8
(5) 6
Options:
(1) 20,20, two or more rising
(2) 20,20, two or more dipping
(3) 45, 45, two or more number of rising
(4) 45, 45, two or more number of dipping
(5) None of the Options
Options:
(1) 1, 15, 30
(2) 1, 30, 15
(3) 1, 30, 30
(4) 1., 15, 15
(5) 1.2, 30, 15
Options:
(1) Carbon dioxide Nitrous fumes, 0.5%, 0.005%,
(2) Carbon dioxide, Carbon Monoxide, 0.5%, 0.0005%,
(3) Carbon Monoxide, Nitrous fumes, 0.005%, 0.0005%,
(4) Carbon Monoxide, Nitrous fumes, 0.05%, 0.0005%,
(5) Carbon Monoxide, Nitrous fumes, 0.0005%, 0.005%,
Options:
(1) 1 5 m/ min
(2) 30 m/min
(3) 45m/min
(4) 60m/min
(5) None of the Options
Options:
(1) Heading
(2) district
(3) both heading & district
(4) While driving a drift
(5) None of the Options
Options:
SMC-Mine Ventilation, Fires, Explosion & Inundation
(1) Carbon Dioxide
(2) Carbon Monoxide
(3) Nitrous oxide
(4) Methane
(5) Oxygen
Options:
(1) Reduction of CO2%
(2) Reduction of CH4%
(3) Reduction of O2%
(4) Reduction N2%
(5) None of the Options
Options:
(1) Continuation of fire
(2) Decrease in fire
(3) Increase in fire
(4) More safe atmosphere
(5) Chances of explosion
Options:
(1) Bucket capacity only
(2) Boom length only
(3) Bucket capacity and Boom length
(4) Power of the machine
(5) Supplying voltage
Options:
(1) Gravitational
(2) Frictional
(3) Torsional
(4) Centripetal
(5) Centrifugal
Options:
(1) Cable belt conveyor
(2) High angle conveyor
(3) Chain conveyor
(4) Shaker conveyor
(5) None of the Options
Options:
(1) Design of the casing
(2) Design of the impeller
(3) Speed of the impeller
(4) Power of the pump
(5) Size of the delivery pipe
Options:
(1) Ohm
(2) Kilo ohm
SMC-Mining Machinary
(3) Mega ohm
(4) Giga ohm
(5) None of the Options
Options:
(1) 2 Core
(2) 3 Core
(3) 4 Core
(4) 5 Core
(5) None of the Options
Options:
(1) 1 in 8
(2) 1 in 10
(3) 1 in 12
(4) 1 in 14
(5) 1 in 16
Options:
(1) Oxygen
(2) Helium
(3) Nitrogen
(4) Hydrogen
(5) None of the Options
Options:
(1) HNO3
(2) H2SO4
(3) HCl
(4) H3PO4
(5) H2CO₃
Options:
(1) Endless haulage
(2) Main & tail rope haulage
(3) Tail rope haulage
(4) Belt Conveyor
(5) Chain Conveyor
Options:
(1) Automatic Catch
(2) Backstay
(3) Buffer
(4) Stoplock
(5) Backsprag
Options:
(1) Joining of two wire rope
(2) Cutting of wire rope
(3) Cleaning of rope
(4) Checking of rope
(5) None of the Options
Options:
(1) Load Haul Dump
(2) Low Haul Dumper
(3) Load Haul Dumper
(4) Low Haul Dump
(5) None of the Options
Options:
(1) At least equal to 25% of the conductivity of the smallest conductor enclosed therein
(2) At least equal to 25% of the conductivity of the largest conductor enclosed therein
(3) At least equal to 50% of the conductivity of the smallest conductor enclosed therein
(4) At least equal to 50% of the conductivity of the largest conductor enclosed therein
(5) None of the Options
SMC-Mining Machinary
Options:
(1) 25%
(2) 30%
(3) 35%
(4) 40%
(5) 50%
Options:
(1) 200 m
(2) 400 m
(3) 600 m
(4) 800 m
(5) 1000 m
Options:
(1) Schedule VI
(2) Schedule IX
(3) Schedule XI
(4) Schedule XIII
(5) Schedule XV
Options:
(1) 12V
(2) 18V
(3) 24V
(4) 30V
(5) 36V
Options:
(1) Off load switch
(2) On load switch
(3) No load switch
(4) Off load and On load switch
(5) Off load and No load switch
Options:
(1) Tail rope haulage
(2) Direct rope haulage
(3) Endless rope haulage
(4) Main & Tail rope haulage
(5) None of the Options
Options:
(1) 60 - 100m
(2) 100 - 150 m
(3) 150 - 180 m
(4) ≥ 200 m
(5) for all depths
Options:
(1) 25 cm
(2) 50 cm
(3) 75 cm
(4) 1.0 m
(5) 1.5 m
Options:
(1) for measuring rope lay
(2) for measuring wire diameter
SMC-Mining Machinary
(3) to sound for loose outer wire
(4) to facilitate study of cracks, fractures and pits in wires
(5) to scrap off corrosion products
Options:
(1) Haulage Drum
(2) Slip Ring Motor
(3) Squirrel Cage Induction Motor
(4) Synchornous Motor
(5) Conveyor Drum
Options:
(1) Lighting Arrestor
(2) Oxy-Acetylene Welding
(3) Oxy-Acetylene Cutting
(4) Electric Welding
(5) Thermit Welding
Options:
(1) Moving the machine left or right
(2) Moving the machine forward or backward
(3) Lifting & tilting of the bucket
(4) Moving the machine left or right and Lifting & tilting of the bucket
(5) Moving the machine left or right and Moving the machine forward or backward
Options:
(1) Nut & bolt clip
(2) Wedge clip
(3) Screw clip
(4) Cam clip
(5) Small man clip
Options:
(1) 2.0 lux (horizontal)
(2) 10.0 lux (horizontal)
(3) 10.0 lux (Vertical)
(4) 5.0 lux (Vertical)
(5) 5.0 lux (horizontal)
Options:
(1) 2, 30
(2) 2, 40
(3) 3, 30
(4) 3, 40
(5) 3,50
Options:
(1) Mechanical Steering lock
(2) Blind Spot Mirrors
(3) Rear View Mirrors
(4) Proximity Sending device
(5) Maximum speed of vehicle to be restricted to 20 km/hr
Options:
(1) No function cut off switch
(2) Swing motor brake
(3) Fire resistant hydraulic hoses
(4) Turbo charger guard
(5) Seat belt
Options:
(1) Bucket Wheel Excavator
(2) Shovel
SMC-Mining Machinary
(3) Drag line
(4) Scraper
(5) Pay loader
Options:
(1) force of power
(2) bucket size
(3) working mechanism
(4) force of power and bucket size
(5) All the Options
Options:
(1) Boom stick
(2) Dipper stick
(3) Saddle stick
(4) All the Options
(5) None of the Options
Options:
(1) Percussive
(2) Rotary
(3) Rotary-percussive
(4) DTH
(5) All the Options
Options:
(1) Helical Cross-section
(2) Square Cross-section
(3) Pentagonal Cross-section
(4) Hexagonal Cross-section
(5) None of the Options
Options:
(1) 2 - 5 kg
(2) 5 - 10 kg
(3) 15 - 25 kg
(4) 30 - 45 kg
(5) > 50 kg
Options:
(1) 60°
(2) 90°
(3) 120°
(4) 150°
(5) None of the Options
Options:
(1) Slow forward & quick backward stroke
(2) Quick forward & Slow backward stroke
(3) Equal forward and backward stroke
(4) Quick forward & Quick backward stroke
(5) None of the Options
Options:
(1) Driving wheel
(2) Donga or Pan
(3) Sprocket
(4) Drum
(5) None of the Options
Options:
(1) Battery loco
(2) Diesel loco
(3) Troley wire loco
(4) Compressed air loco
SMC-Mining Machinary
(5) All the Options
Options:
(1) 100 tpd
(2) 500 tpd
(3) 700 tpd
(4) 1500 tpd
(5) 5000 tpd
Options:
(1) Rope haulage
(2) Winding
(3) Belt Conveyor
(4) Aerial ropeway
(5) Train of tubs
Options:
(1) Centrifugal pump
(2) Axial flow pump
(3) Mixed flow pump
(4) Reciprocating pump
(5) None of the Options
Options:
(1) 1-3 kmph
(2) 3-5 kmph
(3) 5-8 kmph
(4) 8-11 kmph
(5) < 1 kmph
Options:
SMC-Mining Machinary
(1) Diameter of the impellar
(2) Ratio of inlet and outlet value of diameter
(3) Power of motor
(4) None of the Options
(5) All the Options
Options:
(1) 0.1
(2) 0.16
(3) 0.25
(4) 0.3
(5) 0.4
Options:
(1) smooth wearing surface
(2) smaller wearing surface
(3) often greater resistance to corrosion
(4) not easy for water to enter the inter stices between wires
(5) higher breaking load
Options:
(1) 1.2 times the maximum static torque
(2) 2 times the maximum static torque
(3) 3 times the maximum static torque
(4) should be equal to the static torque
(5) should be less than the static torque
Options:
(1) Cut out Switch
(2) Gate End Box
(3) Starter
(4) Transformer
(5) Circuit Breaker
SMC-Mining Machinary
Options:
(1) 6
(2) 9
(3) 16
(4) 6 or 9
(5) 9 or 16
Options:
(1) Tractive effort- provided is more
(2) Negotiates high gradients
(3) Ground pressure exerted is less
(4) Machine stability is more
(5) None of the Options
Options:
(1) Rear end dumper
(2) Side dump load on back truck
(3) Bottom dump dumper
(4) Rear end dumper and Side dump load on back truck
(5) All the Options
Options:
(1) 25 KW (approx)
(2) 34 KW (approx)
(3) 30 KW (approx)
(4) 45 KW (approx)
(5) None of the Options
Options:
(1) Bulldozer
(2) Tilt dozger
(3) Push dozer
(4) U-shaped dozer
(5) None of the Options
Options:
(1) Bulldozing
(2) Side casting
(3) Leveling
(4) Road making
(5) All the Options
Options:
(1) Hinge type
(2) Parallelogram type
(3) Impact type
(4) Tractor type
(5) All the Options
Options:
(1) Wear
(2) Corrosion
(3) Fatigue
(4) Deformation
(5) None of the Options
Options:
(1) Power absorbing machine
(2) Power developing machine
(3) Energy transfer machine
(4) Energy generating machine
(5) None of the Options
SMC-Mining Machinary
Options:
(1) Excessive stress are set up in the wires of ropes close to capel
(2) Tensile stress are set up in the rope due to acceleration and retardation
(3) Tortional stress are set up in the rope due to acceleration and retardation
(4) All the Options
(5) None of the Options
Options:
(1) Igneous
(2) Metamorphic
(3) Sedimentary
(4) Magmatic
(5) Volcanic
Options:
(1) Faults
(2) Folds
(3) Washouts
(4) Igneous Intrsuions
(5) Ball coal
Options:
(1) Roof Mass Rating
(2) Rating of Massive Roof
(3) Rock Mass Rating
(4) Rated Mass of Rock
(5) Rate of Marginal Return
Options:
(1) 1
(2) 2
(3) 3
(4) 4
(5) 5
Options:
(1) Mine Surveyor
(2) Agent of the Mine
SMC-Mining & Working
(3) Safety Officer
(4) Mine Manager
(5) Ventilation Officer
Options:
(1) Advance Longwalling with Stowing
(2) Wide & Stall Method
(3) Bord & Pillar Working with Caving
(4) Chess Board Method
(5) Bord & Pillar Working with Stowing
Options:
(1) Excavator
(2) Electric Shovel
(3) Rope shovel
(4) Front end loader
(5) Dragline
Options:
(1) Trench cut
(2) Berm
(3) Box cut
(4) Ramp
(5) First cut
Options:
(1) 1.0 to 1.5 t /Kg
(2) 2.0 to 3.0 t / Kg
(3) 3.0 to 4.0 t / Kg
(4) 4.0 to 5.0 t /Kg
(5) 6.0 to 7.0 t /Kg
Options:
(1) Underground shot hole drilling
(2) Surface blast holes
(3) Drilling long holes for dewatering
(4) Drilling long holes for getting core from depth
(5) Core drilling
Options:
(1) Diamond drilling
(2) Churn drilling
(3) Percussion drilling
(4) DTH drilling
(5) None of the Options
Options:
(1) 10 -25,000 Hz
(2) 20 -20,000 Hz
(3) 15 -15,000 Hz
(4) 0 - 500 Hz
(5) None of the Options
Options:
(1) Blasting Gallery method
(2) Insitu Coal Gasification
(3) Longwall mining with large panel size.
(4) Board and Pillar mining
(5) Surface mining
Options:
(1) Rajasthan
(2) Jharkhand
(3) Chattisgarh
(4) Madhya Pradesh
SMC-Mining & Working
(5) All the Options
Options:
(1) Inclined slicing in descending order with caving.
(2) Horizontal slicing in ascending order with stowing.
(3) Inclined slicing in ascending order with stowing.
(4) Inclined slicing in descending order with stowing.
(5) None of the Options
Options:
(1) Coal seams
(2) Over burden
(3) Strata between coal seams
(4) Shale bands
(5) All the Options
Options:
(1) Longwall mining
(2) Bord and Pillar mining
(3) Highwall mining
(4) Placer mining
(5) Blasting Gallery
Options:
(1) 120 m to 150 m
(2) 200 m to 250m
(3) 300 m to 350 m
(4) 150 to 200 m
(5) None of the Options
Options:
SMC-Mining & Working
(1) mining coal
(2) protect the roof rock from convergence while development
(3) increase the recovery of coal
(4) Provide for ventilation
(5) Provide for pumping
Options:
(1) Deformations
(2) Stresses
(3) Strains
(4) Dilation of joints
(5) All the Options
Options:
(1) Steel arches
(2) Rock bolts
(3) Steel props
(4) Powered supports
(5) None of the Options
Options:
(1) Goggles
(2) Ear muffs
(3) Apron
(4) Seat Belt
(5) None of the Options
Options:
(1) 1 in 7
(2) 1 in 5
(3) 1 in 6
(4) 1 in 4
(5) 1 in 3
Options:
(1) Stooking
(2) Diagonal line of extraction
(3) Snook pillar & Triangular pillar
(4) Bord and Pillar mining
(5) None of the Options
Options:
(1) Low capital cost
(2) Convenience in riding
(3) smooth travel
(4) All the Options
(5) Facilitates Continous Operation
Options:
(1) Vertical Shaft
(2) Inclined Shaft
(3) Decline
(4) Incline
(5) Adit
Options:
(1) forward; backward
(2) forward; horizontal
(3) backward; upward
(4) horizontal; vertical
(5) backward; sidewise
Options:
(1) primary explosive
SMC-Mining & Working
(2) secondary explosive
(3) tertiary explosive
(4) high explosive
(5) low explosive
Options:
(1) low; shallow
(2) high; shallow
(3) high; deep
(4) high; medium
(5) high; very deep
Options:
(1) increases during summer
(2) increases during and after monsoon
(3) increases after autumn
(4) increases during winter
(5) remains same in all seasons
Options:
(1) Drift
(2) In situ
(3) Tectonic
(4) In situ and Tectonic
(5) Drift and In situ
Options:
(1) Mutiple seams with varied thickness
(2) Couple of seams with identical thickness
(3) Seams with dirt bands
(4) Seams with numerous slips
(5) Thick seams
Options:
(1) it has high affinity to moisture and and departs from roof easily.
(2) it gives no warning before falling
(3) it can't be supported
(4) it gives bad sound while testing
(5) it has complex geological characteristics.
Options:
(1) 0.1
(2) 0.3
(3) 0.5
(4) 1
(5) 1.25
Options:
(1) Development only
(2) Depillaring only
(3) Development & depillaring both
(4) Development of Longwall panel
(5) None of the Options
Options:
(1) Only Jharia Coalfield
(2) Jharia and Raniganj Coalfields
(3) Jharia and Talcher Coalfields
(4) Only Talcher coal field
(5) Only Raniganj coal field
Options:
(1) Land acquisition and R&R
(2) Exploration
SMC-Mining & Working
(3) Low demand of coal
(4) Mining Technology
(5) None of the Options
Options:
(1) Lowering the temperature below 80°C
(2) Using emulsion or slurry explosives
(3) Initiation by nonel
(4) Charging and firing to be completed within 2 hrs
(5) All the Options
Options:
(1) Full column cement grouted bolt
(2) Full column resin grouted bolt
(3) Swellex bolt
(4) Split set bolt
(5) None of the Options
Options:
(1) Shotfirer
(2) Mining Sirdar
(3) Explosive Carrier
(4) Exploder
(5) Overman
Options:
(1) loading
(2) transportation
(3) initial crushing
(4) washing
(5) caking
Options:
(1) NOx
(2) COw
(3) NH3
(4) CO
(5) CH4
Options:
(1) 4480
(2) 1936
(3) 1600
(4) 1296
(5) 1120
Options:
(1) air compression
(2) air flow direction
(3) air overpressure
(4) air density
(5) air velocity
Options:
(1) 1 to 5 m; ahead of
(2) 5 m; behind
(3) 5 to 10 m; side of
(4) 300 m; ahead of
(5) 450 m; beside
Options:
(1) 9; 1
SMC-Mining & Working
(2) 5; 10
(3) 10; 5
(4) 3; 7
(5) 8; 2
Options:
(1) 100;5
(2) 150;8
(3) 200;7
(4) 250;8
(5) 100;10
Options:
(1) in situ stress in mine
(2) load on breaker line props
(3) induced stress in pillars
(4) relative movement between roof and floor
(5) absolute roof convergence
Options:
(1) 3
(2) 5
(3) 7
(4) 9
(5) 11
Options:
(1) incorrect hydraulic profile
(2) corrosion in pipes
(3) hydraulic gradient lying above hydraulic profile
(4) high humidity at stowing location
(5) excess silica content in sand
Options:
(1) 8 m
(2) 10 m
(3) 14 m
(4) 17 m
(5) 22 m
Options:
(1) Insitu stress
(2) Modulus of elasticity of rock
(3) Shape of opening
(4) Distance away from the opening
(5) Option 3 and 4
Options:
(1) Air quantity is doubled and pressure remains same
(2) Air quantity as well as pressure is doubled
(3) Pressure is doubled and air quantity remains same
(4) Air quantity is quadrupled and pressure is doubled
(5) None of the Options
Options:
(1) Total ton-km effort
(2) Centre of the mine field
(3) Rise side of the property
(4) Dip side of the property
(5) None of the Options
Options:
SMC-Mining & Working
(1) 4 cu.m / tonne
(2) 4 tonne / cu.m
(3) 3 cu.m / tonne
(4) 3 tonne / cu.m
(5) 0.25 tonne / cu.m
Options:
(1) P = RQ
(2) P = RQ2
(3) P = RQ3
(4) P = RQ0.5
(5) None of the Options
Options:
(1) 11 MPa
(2) 10 MPa
(3) 12 MPa
(4) 13 MPa
(5) 14 MPa
Options:
(1) Distribution of stresses around a mine opening
(2) Low thickness zones
(3) Arching of supports erected
(4) Shear zones
(5) None of the Options
Options:
(1) Back Abutment pressure
(2) Yielding Pressure
(3) Front Abutment Pressure
(4) Advance Load
(5) Side abutment pressure
SMC-Mining & Working
Options:
(1) 20
(2) 30
(3) 40
(4) 50
(5) 60