MIL-F-18240D 25 February 197? Superseding MIL-F-18240C (ASG) 17 November 1967
MIL-F-18240D 25 February 197? Superseding MIL-F-18240C (ASG) 17 November 1967
MIL-F-18240D 25 February 197? Superseding MIL-F-18240C (ASG) 17 November 1967
com
MIL-F-18240D
25 February 197?
Superseding
o MIL-F-18240C(ASG)
17 November 1967
MILITARY SPECIFICATION
1. SCOPE
2. APPLICABLE DOCUMENTS
●
2.1 The following documents, of the issue in effect on date of invi-
tation for bids or request for proposal, form a part of this specification to the
extent specified herein:
SPECIFICATIONS
Military
STANDARDS
Military
●✍
Downloaded from http://www.everyspec.com
MIL-F-18240D
ST.4NDARDS
-0
hlilitarv (Cent’d)
AN121501 thro
Nui - Plain
AN121525
2
Downloaded from http://www.everyspec.com
MIL-F-18240D
-.
3. REQUIREMENTS
*
fn addition, the retention of qualified products list shall be dependent on
a periodic verification of continued compliance with the requirements of this
specification (see 4.4.3.1).
3
Downloaded from http://www.everyspec.com
!.1:: -F-i824Ci)
.-
*
D D
kc-.
l-’% I rB
. COtiPIOIIRATION
A ZJ CONT?.W41AT30N
B > lf
SLUG- 140UN0ORNEK 6’31W’OR PATOH
,,
MIL-F-18240D
5
Downloaded from http://www.everyspec.com
hIIL-F-18240L)
MIL-F-18240D
,*
4.5 Qunlitvconformance inspection - The bolt or screw msnu -
factursr shall be responsible for accomplishing tbe quality conformance inspec -
tion specified herein and the quality conformance inspections required under the
supplementary bolt or screw spec ffic atione. The prncurfng activity’ may, at its
discretion, accept certification of inspections required under the supplementary
bolt or screw specifications when the basic bolts or screws are manufactured
at a separate facility. When milling or s!otting operation is used for insertion
of locking element into non-corrosive resistant bolts or screws the complete
assembly shall p~s the salt spray test as required by the applicable boit, screw
or plating specification.
XIIU-F-lI?.240D
Minor A
Minor B
MIL-F-18240D
● Examinationof
Ma..imurn torque
product (see
(see
4.6.2)
4.6.3.1)
Minimum bre +away torque (see 4.6.3.2)
Reusability (see 4.6.6)
Also, self-leek.ing bolts and screws shall meet any of the other tests herein
epecffied which are considered necessary by the procuring activity to deter-
mioe conformance with the rmuirernents of this SPSCtfication.
9
Downloaded from http://www.everyspec.com
M1--F-1824OD
at least five complete turns of tne nut after the threads of the nut have initially
engaged the locking device, whichever provides the greater number of turns.
For quillty conformance inspection on bOlts m screws tithnut sufficient thread
length for X mfn. of MS15981. oni!’ a positive indication of torque is required
for 15 installations md removals. E-ch removal shali consist of the same
number of complete turns, in the opposite direction, as was required for irl-
stallation. The torque test shall he run at a -ate S1OWenough to .yfeld a de-
pendable measure of torque, and tiic temperature rice of the nut being tested
shall not exceed 75”F. A new nut and bolt or screw shai} be ueedfor aeoh
test. For qualification, 10 of the sample bolts or screws euppttedshall be
used for this test:
~ ,~,~ ~~. rque {w!th heat -codticxted bn!ts m screw~ - The nuts
used for this test shall he as specified in table II. The nuts shall be ecrewe~ on
th( bolts or screws until the bearing surface of the nut has traveled completely
along the thread length of the effective area of the cpecffic element design or at
Iewx 5 complete turns after the threads of the nuts have tnitially engaged the
Iockmg element, whichever provides the pester number of turns. Ten new
bnltsor screws shallhe subjectedto thistest. These assemblies shall be con-
ditioned :~t a temperature of 250” + 10” F for 3 hours. The assemblies shall
then he cooled in air tn room temperature for not less than 1 hour. The assem-
blies shall then be tested as specified in 4.6.3. Maximum locking torque readings
shall bc taken ench installation and removal of the nut.
10
Downloaded from http://www.everyspec.com
.MIL-F-19240D
o
7/8 -14 UNF-3A 600 70.0
1 -12 UNF-3A 800 92.0
1- 1/8 -12 UNF-3A 900 117.0
1-1/4 -12 UNF-3.4 1,000 1’43.0
11
Downloaded from http://www.everyspec.com
MIL-F-18240D
.
4.6.7 .1.2 The tests shall be conducted in Wriods of running and per-
iods of rest to permit the electrical power unit to cool. A fan or blower shall be
set to direct a current of air on the test rig, in or&r that 20-minute mute with
10-minute rest intervals shall net develop temperatures greater than 105”F in
the test specimen,
12
@
%J
Downloaded from http://www.everyspec.com
JIIL-F-18240D
.
4.6.7.1.3 The boltsor screws shallbe consideredto h~ve f~iled the vibra-
tion test under the followirsg conditions:
13
Downloaded from http://www.everyspec.com
kfIL-F-1824(ID
(c) The element shall be considered to have failed when any nut
comes completely o’{ the boft or sorew &rLeg the average
vibration tnne. ,,
●
4.6.7.2 Preparation for vibration test to hfIL-STD-1312, Test 7.
. . Accelerated vib. tion
4.6.7.2.1 — - The bolts or screws shall be assembled in
accordance with Figure 1 of hIIL-STD-1312, Test 7 with nuts and torque values as spe-
cifified in Table V, The nuts shall then be removed sod reinstalled to this torque four
additional times before being vibrated.
. 4.6.7.3 _Method - Use MIL-STD-1312, Test ? procedure.
●
4.6.7.3.1 Determinant ion shall be made throughout the test to guammtee that
assembly is traversing the entire lengthof the slotsinthe testfi?$ure.The tetst shtil
be run for45,000cyclesexceplthatitshallbe stoppedpriorto the completionof the
45,000cycles in the event a nut becomes disassembled from tbe bolt.
4.6.7.3.2 The bolts or screws shall be considered to have failed the vibration
testunder the followingconditions:
(a) ffany structuralfailureoccurs in the lockingelement area
.0
during the vtbration time, such as a break or crack that inter-
sects that portion of the ;hreads that has been removed for in-
sert ion of the locking element or if any nut rotates greater than
360 degrees the test shall be terminated.
@) The element shall be considered to have failed when any nut can
be turned completely on off tbe bolt or screw with the fingers
during or after completion of 45,000 cycles.
(c) Tbc element shall be considered to have failed when any nut
comes completely off the bolt during the 45,000 cycles.
,i PREPARATION FOR DELIVERY
5.1 Presentation
—— snd pack~in~ - Preservation and packaging shall be
level A, or C, as specified (see 6. 2). Unless otherwise specified by the procuring
activ:ty, unit package quantity and preservation and packaging shall be in accordance
with MIL-H-3982,
3.2 Packing - Packing shall he level A, B, or C, as specified by the
contract or order. Unless otherwise specified in the contract or order, fasteners shall
be packed in accordance with MIL-H-3982.
14
Downloaded from http://www.everyspec.com
311L- F-18240D
-.
6. NOTES
● 6.3
threaded fasteners.
Use of standard and nonstandard self-locking eternally
- For definition of these terms, see 6.5.2 and 6.5 .3)
15
Downloaded from http://www.everyspec.com
MIL-F-1S240D
element designs requiring qualification, awards will be made only for such
products incorp.crating eiements, the riesgn of which, prior to the time set
for opening of bids, has been teswd and approved for inclusion in the appli-
cable Qualified Products List, whether or not such element designs have
actual Iy been so listed by that date. The attentioo of the suppliers is called
to this requirement, and manufacturers are ~rged to arrange to have the
locking element designs that they propose to i.ncorpnrate in bolts or screws
to be offered to the Federal Gov ~rnrnent testad for qwalfflcetion, fn order that
they may be eligible to be awarded contracts or orders for products tncorper-
ating element designs covered y this apeeifioation. Tbe activfty responsible
for the Qualified Products List is the Naval Air Systems Command, Attn:
AIR -52021, Washington, D, C. 20360. However, information pertaining to
qualification of products may be obtained form the Navel Air Development
Center, Aero Materials Department (MAEM), Johnsvtlle, Warmineter,
Pennsylvania ~8974.
MIL-F-18240D
● 6.5 Definitions -
* Cww)dinns
: Preparing activity:
Navy - AS Navy - AS
Air Force - 11
Army - AV Project No. 5305-1077
‘Revicner activities:
Nm’y - AS
Air Force -11, 82
Army - AV, WC
DS,y . fs
17
Downloaded from http://www.everyspec.com
NHmfclfoNs In ● continuing
effmtkmM3k3our Aaddhtion &aawmb batter, tboDoD ~dm tbh form for we i,,
abraittillg
—nt3 md nuEnt10m3 6X bp30ma9* AIlu9n0fmifktuy~ docanwab an imited to provide
fddd donf
3u,ygdioM. ‘l%kform M3Y b detaelmf, the h- indkatd, bpod donf tha10033odse (DO NOT STflLE) . mr
did. k block 6, b u cp3ci17cU ~bb ●bout patkulm puhbm ~ ach u wmdiag wbicb mquimd M3rpretition, m
● @ ~d. ~bw.
Probkmm.
wknowk~mwnt
En&
10033.ti@u% cwWMtipdbk,
in black 6 uv
ad tim pmpacod _
mmark# not mfatd to a #pmifk
~
PUW@
whkrbwoufdalleds~ the
of tho ~
*II ha mailed to You within80 &y3 to lotyou know tbstyour coanwnti wn
t. ff block 7 k3 rdbdout,m
rweaiwd and are Ming
cxxwiderrd
NOTE: 7%u form may not h used to IWIU* copies of docummta, am to request wiun, devi@xu, or c13?Nii8tinn oi
~-fi-ti~ q*xU On -nt C0rAr3Ct3. Cxa8mriti submlttad on thii form do not constitute or implyauthorimtim
to W3ivemy potion of the reformed drimmmt(c)or to mend cmtmctud mquimmenh.
111111 F
UNITED S7A:
1
OFFICIAL BUSINES
--ENALTVFOR*WVA7EUSES3UJ Bus~NE:sNoRE,PLYMAl~ ~“
I
NAME OF SUBMllTINO CIR(3ANIUT,DN 4. TVPE
❑
Of ORGANIZATION
“moo,
(Mu4 me) —
D
❑ w,”
❑ Or”llfi ,S,,c,!y,:
-
PUOSLEW AnEAS
. P.rWr@I Numb.? md Wording:
b, ROmrnnmmlod W.,dl”n,
o
c. R.9c.n/R.,i.”.l. ,., RDCOm-m,O.,
.—
REMARKS
I’_
7.,NAME OF S“SM,TTE~ lb!. Fb’mt,
Ht) - OOtlond b. WOnK TELEPHONE NUM8En (Inddc
C*) - Owbnd
Am
0
W. tISAILINGAODRESS tsmd, c,*, SWW, zw C+, - *,hnd S. OATE OF 8UBMl~10N (YYMMDD)
~