SATIP-K-001-05 - Chilled Water System Rev 7
SATIP-K-001-05 - Chilled Water System Rev 7
SATIP-K-001-05 - Chilled Water System Rev 7
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
Review of HVAC System Testing See See See SATIP-K-001-12 Testing, Adjusting and Balancing
1.1
Organization Qualifications Remarks Remarks (TAB) of the HVAC System
Review of HVAC System Testing, See See See SATIP-K-001-12 Testing, Adjusting and Balancing
1.2
Adjusting and Balancing Procedures Remarks Remarks (TAB) of the HVAC System
See See
2.3 Chilled Water Piping See SATIP-K-001-04 Chilled Water Piping
Remarks Remarks
3.0 INSTALLATION
Page 1 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
See See
3.4 Chilled Water Piping See SATIP-K-001-04 Chilled Water Piping
Remarks Remarks
See See
3.5 Air Handling Unit See SATIP-K-001-02 Air Handling Units
Remarks Remarks
SAIC-K-
3.6 Fan Coil Units (FCU) SAIC-K-4040
4040 H W
4.0 PRE-COMMISSIONING
SATR- SATR-
4.1 Chilled Water System Treatment
K-4002 K-4002 RH RH
System Testing, Adjusting and Balancing See See See SATIP-K-001-12 Testing, Adjusting and Balancing
4.2
Report Remarks Remarks (TAB) of the HVAC System
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
Page 2 of 3
SAUDI ARAMCO ID/PID FORM REV 1 - 010109 Rev 7 COS 03/31/2013
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
INSPECTION RESPONSIBILITY
QUALITY ASSIGNMENTS
ITEM PROJECT PHASE QUALITY
TASK / ACTIVITY PROCEDUR REMARKS
NO. & ACTIVITY CODE RECORD
E CNTRCTR
SAUDI
ARAMCO
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection