Satip D 100 01
Satip D 100 01
Satip D 100 01
00 31-Jul-18
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Tank Data Sheet & Safety Instruction Form 2693-ENG Safety Instruction Sheet-Tanks -
1.1 SAIC-D-2014 SAIC-D-2014 RH RH
Sheet (SIS) Carefully Review before Work
Receiving Insp of Tank Plate Materials Appurtenances consist of Nozzles, manways, Venting
and Appurtenances Using Form 2696- Devices, Temperature Instruments, Level Gauging
2.1 SAIC-D-2023 SAIC-D-2023 W W
ENG Appurtenance Schedule and Systems, Sample Connections, and
Orientations Stairways/Ladders/Platforms
3.0 INSTALLATION
Inspect Foundation & Undertank Systems Method Statements required. QA/QC Mgr action is
3.1 before Bottom* Plate Layout (Annular & SAIC-D-2024 SAIC-D-2024 H H required BEFORE work. Sequence of work shall be
Floor Plates) carefully controlled.
Inspect Bottom Plate (Annular, Floor), Issue RFI before the start of work for Layout Checks
3.4 SAIC-D-2025 SAIC-D-2025 H W
Shell & Roof Plate Layout & Installation in accordance with API Standards.
3.6 Inspect Tank Welding See Remarks See Remarks Refer to SATIP-W-017-01
3.7 Block Valve Field Testing & Installation See Remarks See Remarks Refer to SATIP-L-108-01
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Pressure Testing of API Tanks
A) Pre-Test Inspections Refer to SATIP-A-004-06 (New) A & B) Use SAIC-A-
3.8 See Remarks See Remarks
2026
B) Settlement Verification
Inspect Grounding (Lugs, Cable, Rods) &
3.9 Bonding Shunts between Tank Shell & See Remarks See Remarks Refer to SATIP-P-111-01 (Use SASD AB 036387)
Roof
Inspect Relief/Vacuum/Venting
3.12 See Remarks See Remarks Refer to SATIP-J-600-01
Installations
Flange Joint Inspection (Gasket See Note 1 of the General Notes and minimum of
3.13 SAIC-L-2014 SAIC-L-2014 W W
Installation) 10%, thereafter.
3.14 Structural Attachments & Access See Remarks See Remarks Refer to SATIP-M-001-01
4.0 PRE-COMMISSIONING
Instrumentation and electrical pre- Refer to the respective SATIPs for Electrical &
4.2 See Remarks See Remarks
commissioning Instrumentation
Punch Listing/Final Inspection of Tank
4.3 SAIC-D-2021 SAIC-D-2021 H S Use SATR-A-2011
Installation
4.5 Tightness test or Service test See Remarks See Remarks W W Refer to SATIP-A-004-06
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
###
###