SAUDI ARAMCO ID/PIEU-31-July-2018 - REV.2018.07.00 (Standards Cutoff - July 31,2018) Rev 2018.07.

00 31-Jul-18

SAUDI ARAMCO TYPICAL INSPECTION PLAN


SATIP No. APPROVED DATE DISCIPLINE:

FIELD ERECTED STORAGE TANK (API 650) SATIP-D-100-01 24-Jul-18 Mechanical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Tank Data Sheet & Safety Instruction Form 2693-ENG Safety Instruction Sheet-Tanks -
1.1 SAIC-D-2014 SAIC-D-2014 RH RH
Sheet (SIS) Carefully Review before Work

2.0 MATERIAL RECEIVING

Receiving Insp of Tank Plate Materials Appurtenances consist of Nozzles, manways, Venting
and Appurtenances Using Form 2696- Devices, Temperature Instruments, Level Gauging
2.1 SAIC-D-2023 SAIC-D-2023 W W
ENG Appurtenance Schedule and Systems, Sample Connections, and
Orientations Stairways/Ladders/Platforms

2.2 Storage, Handling & Preservation SAIC-D-2005 SAIC-D-2005 W S

Refer to respective SATIPs for Electrical & Instr:


Verification & Visual inspection of vendor
2.3 See Remarks See Remarks (SATIP-P-113-01, P-515-01, J-100-01, J-200-01, J-
supplied electrical & instrumentation
300-01, J-902-03)

3.0 INSTALLATION

Inspect Foundation & Undertank Systems Method Statements required. QA/QC Mgr action is
3.1 before Bottom* Plate Layout (Annular & SAIC-D-2024 SAIC-D-2024 H H required BEFORE work. Sequence of work shall be
Floor Plates) carefully controlled.

Concrete Placement (Ringwall Foundation


3.2 See Remarks See Remarks Refer to SATIP-Q-001-02
per ACI 318)
Cathodic Protection for Tank Bottoms & Refer to SATIP X-600-02 or J-500-01(Internal CP)
3.3 See Remarks See Remarks
Internals as applicable

Inspect Bottom Plate (Annular, Floor), Issue RFI before the start of work for Layout Checks
3.4 SAIC-D-2025 SAIC-D-2025 H W
Shell & Roof Plate Layout & Installation in accordance with API Standards.

Form 2696-ENG Appurtenance Sch &


OrientationForm NMR-7918-1 Nonmaterial Reqmts
Inspect Tank Appurtenances* & Trim
3.5 SAIC-D-2025 SAIC-D-2025 H W for Tanks Form NMR-7918-2 Nonmaterial Reqmts for
Installation
Floating & Internal Floating Roofs Issue RFI for
Appurtenance Installations

3.6 Inspect Tank Welding See Remarks See Remarks Refer to SATIP-W-017-01

3.7 Block Valve Field Testing & Installation See Remarks See Remarks Refer to SATIP-L-108-01

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-31-July-2018 - REV.2018.07.00 (Standards Cutoff - July 31,2018) Rev 2018.07.00 31-Jul-18

SAUDI ARAMCO TYPICAL INSPECTION PLAN


SATIP No. APPROVED DATE DISCIPLINE:

FIELD ERECTED STORAGE TANK (API 650) SATIP-D-100-01 24-Jul-18 Mechanical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO
Pressure Testing of API Tanks
A) Pre-Test Inspections Refer to SATIP-A-004-06 (New) A & B) Use SAIC-A-
3.8 See Remarks See Remarks
2026
B) Settlement Verification
Inspect Grounding (Lugs, Cable, Rods) &
3.9 Bonding Shunts between Tank Shell & See Remarks See Remarks Refer to SATIP-P-111-01 (Use SASD AB 036387)
Roof

Refer to respective SATIPs for Electrical & Instr:


Hook-up of vendor supplied electrical &
3.10 See Remarks See Remarks ( SATIP-P-113-01, P-515-01, J-100-01, J-200-01, J-
instrumentation
300-01, J-902-03)

Refer to respective SATIPs for Electrical & Instr:


Verification & Visual inspection of vendor
3.11 See Remarks See Remarks ( SATIP-P-113-01, P-515-01, J-100-01, J-200-01, J-
supplied electrical & instrumentation
300-01, J-400-01, J-902-03)

Inspect Relief/Vacuum/Venting
3.12 See Remarks See Remarks Refer to SATIP-J-600-01
Installations
Flange Joint Inspection (Gasket See Note 1 of the General Notes and minimum of
3.13 SAIC-L-2014 SAIC-L-2014 W W
Installation) 10%, thereafter.

3.14 Structural Attachments & Access See Remarks See Remarks Refer to SATIP-M-001-01

External Coating, Color coding & Refer to SATIP-H-002-03 OR H-002-05 as applicable


3.15 See Remarks See Remarks
Identification for field painting.
Refer to SATIP-N-001-01 or SATIP-N-001-02,
3.16 Insulation See Remarks See Remarks
whichever is applicable

4.0 PRE-COMMISSIONING

4.1 Tank Closure Inspection SATR-D-2005 SATR-D-2005 H H

Instrumentation and electrical pre- Refer to the respective SATIPs for Electrical &
4.2 See Remarks See Remarks
commissioning Instrumentation
Punch Listing/Final Inspection of Tank
4.3 SAIC-D-2021 SAIC-D-2021 H S Use SATR-A-2011
Installation

4.4 MCC Punchlisting SA-6133(FEIL) SA-6133(FEIL) H

4.5 Tightness test or Service test See Remarks See Remarks W W Refer to SATIP-A-004-06

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-31-July-2018 - REV.2018.07.00 (Standards Cutoff - July 31,2018) Rev 2018.07.00 31-Jul-18

SAUDI ARAMCO TYPICAL INSPECTION PLAN


SATIP No. APPROVED DATE DISCIPLINE:

FIELD ERECTED STORAGE TANK (API 650) SATIP-D-100-01 24-Jul-18 Mechanical


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. Activity Code PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1
levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3
representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-31-July-2018 - REV.2018.07.00 (Standards Cutoff - July 31,2018)

Saudi Aramco: Company General Use


Rev 2018.07.00

###

Saudi Aramco: Company General Use


31-Jul-18

Saudi Aramco: Company General Use


31-Nov-20 24-Jul-18

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-31-July-2018 - REV.2018.07.00 (Standards Cutoff - July 31,2018)

Saudi Aramco: Company General Use


Rev 2018.07.00

###

Saudi Aramco: Company General Use


31-Jul-18

Saudi Aramco: Company General Use


31-Nov-20 24-Jul-18

Saudi Aramco: Company General Use