Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 42

CHARUTA PRIVATE LIMITED

(880-2) 9840088
House # 65, Road # 27, Block # K info@charuta.com
(880-2) 9885473
Banani, Dhaka - 1213
1976 Started as Sole Proprietorship

1982 Incorporated as a
Private Limited Company

2017
CONSTRUCTION
o Structural Works
o Civil & Glazing works
o MEP works
• Plumbing Works
• Fire Fighting Works
WHAT WE DO • HVAC Works
• Electrical Works
• IT & ELV Works
• Lift & Elevator Works

INTERIOR DESIGN
& DECORATION
WORK FORCE
o Well Qualified And Skilled
Permanent Work Force

o Proficient Project Manager

STRENGTH
MAINTAINING SAFETY
REGULATION
o Both in CONSTRUCTION
&
INTERIOR DECORATION
Major Completed Projects (Construction Part)

PROJECTS • EMBASSIES AND HIGH COMMISSIONS -Construction


• BANK HEADQUARTER – Construction
• CORPORATE OFFICES – Construction
• 5 STAR HOTELS– Construction
• RESIDENTIAL APARTMENTS – Construction
ROYAL THAI
EMBASSY
BARIDHARA, DHAKA
HIGH COMMISSION
OF CANADA

BARIDHARA, DHAKA
BRITISH HIGH
COMMISSION
A High Profile Office
Building for DFID

BARIDHARA, DHAKA
THE ROYAL EMBASSY
OF SAUDIA ARABIAN

BARIDHARA, DHAKA
(ONGOING)
NASSA TOWER
Bangla Motor, Dhaka
HADI TOWER
Gulshan, Dhaka
HOTEL
INTERCONTINENTAL
1, Minto Road, Dhaka - 1000
Major Ongoing Projects (Construction Part)

PROJECTS • THE ROYAL EMBASSYOF SAUDIA ARABIAN


• AGA KHAN ACADEMY
• CHARUBITHI APARTMENT
Major Completed Projects (Interior)

PROJECTS • EMBASSIES AND HIGH COMMISSIONS


• BANK HEADQUARTER
• CORPORATE OFFICES
• 5 STAR HOTELS
• AIRLINES OFFICES
• MOBILE OPERATORS
BANK ALFALAH
Gulshan Branch
LI & FUNG
Corporate Office
Uttara, Dhaka
NESTLE
BANGLADESH
Corporate Office
Ninakabbo, Tejgaon, Dhaka
PARTEX GROUP

Corporate Office
Tejgaon, Dhaka
GIANT GROUP

Corporate Office
Uttara, Dhaka
HUAWEI

Corporate Office
Gulshan, Dhaka
Major Ongoing Projects (Interior)

PROJECTS • BANGLALINK HEAD OFFICE


• RADISSON BLU COX’S BAZAR
• DHAKA STOCK EXCHANGE
• IDB – COUNTRY HEAD OFFICE
• EBL HEAD OFFICE
• HUAWEI HEAD OFFICE
• RAJUK COMMERCIAL COMPLEX
It is the policy of CHARUTA to ensure, so far as is reasonably
practicable, the health, safety and welfare of its employees while
they are at work and any other persons who may be affected by
their undertakings, and to comply with the Health, Safety and
Environment at Work Act 2013 and Bangladesh Labour Law,
2006 (amended) and other relevant legislation as appropriate.

HEALTH OBJECTIVES
& In order to achieve compliance with this Policy, CHARUTA has set
the following objectives to :
SAFETY POLICY
• Maintain high standards for HEALTH, SAFETY and the
PROTECTION of the environment at its premises and worksites.

• Identify risks and set in place programmes to remove or reduce


these risks.
OBJECTIVES

• Ensure that these standards are communicated to all employees,


HEALTH contract staff, temporary workers, members of the public and other
third parties, as appropriate.
& • Ensure that all personnel are given the necessary information,
instruction and training to enable them to work in a safe manner.
SAFETY POLICY • Ensure the dissemination and discussion of relevant information
on safety, health and environmental issues.
• Introduce promotional campaigns to encourage safety, health and
environmental awareness and compliance
• Make provision of adequate resources to enable managers to
properly implement the policy and monitor its effectiveness.
• Monitor operations at CHARUTA premises and worksites.
CHARUTA Private Ltd. is dedicated to maintaining the highest
quality and environmental standards in all our activities. The
Company ensures that our business is carried out in a responsible
and considerate manner and is involved at every stage of the
construction lifecycle, including maintenance, operation and
facilities management of support services.

ENVIRONMENTAL
POLICY
The Company’s objective is to integrate fully environmental and
social factors into all business strategies with a view to contribute
towards sustainable development and drive towards
sustainability with a focus on the social, economic and
environmental impacts of its operations reflect its key values of
openness, mutual dependency and collaboration
HSE BRIEFING

Officer To Engineers
TOOL BOX MEETING

Officer To WORKERS
AWARDS
AWARDS
MEMBERSHIP
RESOURCES
4 Story
Furniture Factory
At Savar
EQIPMENTS
Automatic Edge Bander
For Furniture & INTERIOR
Works
EQIPMENTS

Double Sides Gluing Edge


Bander For Furniture
& Interior Works
EQIPMENTS

Panel Saw 45º


For Furniture
& Interior Works
EQIPMENTS

Multi head-multi hole


drilling machine For
Furniture & Interior Works
EQIPMENTS

Hinge Boring Machine


For Furniture
& Interior Works
EQIPMENTS

Door Lock Hole Machine


For Furniture
& Interior Works
EQIPMENTS

automatic spraying
Machine For Furniture
& Interior Works
EQIPMENTS

combination machine
For Furniture
& Interior Works
EQIPMENTS

Thicknesser Machine
For Furniture
& Interior Works
EQIPMENTS

Wood Treatment Machine


For Furniture
& Interior Works
HONOURABLE
CLIENTS
THANK YOU

You might also like