GENERAL NOTES
1) FOUNDATION DESIGN IS NOT RESPONSIBILITY OF AL TASNIM ENTERPRISES (STEEL FAB. DIVISION).
2) BRACING & GABLE END REACTION ARE TO BE CONSIDERED WITH THE MAIN FRAME REACTIONS
3) BOTTOM OF BASE PLATES ARE AT THE SAME ELEVATIONS (UNO)
4) STANDARD AL TASNIM ANCHOR BOLTS CONSIST OF 2 NUTS + ONE WASHER .
5) ALL DIMENSIONS ARE IN MILLIMETERS
6) ALL GIVEN REACTIONS ARE UNFACTORED.
7) SIGN CONVENTION SHALL BE AS BELOW
1 2 3 4
TYPICAL Frame
1 2 3 4
TYPICAL Frame
TO BE ADDED TO MAIN
COLUMN REACTIONS