Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

14 13 12 11 10 9 8 7 6 5 4 3 2 1

K K
830 830
3500 800

3500 800

J J

4200
1325 1325
150

150
50

50
950

950
1975
1975 1975
1975
4550

4550
3300
50

50
1675 1675
I I
1675 1675
4500

4500
3300
50

50
1675 1675
1675 1675
4500

4500
H H
3200
50

50
1675 1675
38450

38450
1675 1675
4500

4500
3200

100
50

50
1675 2650 3700 2650 1675
G G
1675 1675
4500

4500
3100
250

250

100
50

1975 1975

50
50

50
1975 1975
4500

4500
F F
50

1475 1625
635

50
6000

6000
3000 2900

500

50
1585 1585 1585 1585 1585 1585
160

160
60

60
1100

1100
500
E E

1600
1900 1000

1900 1000

2650
4500

4500
5800

5800

5800

5800
5900

5900

5900

5900
D D
>
=
2400 2800 2400 2400 2800 2400
350 350 200 200 350 350 350 200 200 350
7000 9000 9000 9000 7000 9000 9000 9000
34000 34000
C C
B B
Plot date and time: Wednesday, 1 September 2021 2:40:22 pm

Checked by: Approved by: CONTRACTOR Prepared by:


DESIGNER REVISION DATE DESCRIPTION PROJECT
METRO MANILA SUBWAY PROJECT PHASE 1 PACKAGE CP101
TITLE PROJECTION STAGE DATE
A 30/JULY/2021 For Construction 30/JULY/2021
PRI BUILDING Initial Design
SCALE
A SECTION DETAIL (SHEET 1 OF 8)
Technical Design 1:150 A
Republic of the Philippines PRC No. Validity Construction Design INTENDED FORMAT
KIYOSHI MIMURA Third Angle As-Built A1
PTR No. DATE: DRAWING No. SHEET REV
Shimizu - Fujita - Takenaka - EEI Joint Venture Place TIN MMSP-SFTEJV-101-PRI-DWG-C-300512 1
8 A
14 13 12 11 10 9 8 7 6 5 4 3 2 1

You might also like