OHTL Scope Sketch-Commented

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FROM 

POWER PLANT SUBSTATION through 33kV Cable

Offsite Facility S/S


Re-connection of
33kV Switchgear existing lines to OFS
substation (Currently
connected to NGPT1
compact S/S). Re-
connection from OFS
to first tower of
existing line.

F2TT1 New Tapping
Tower
New OHTL
WellpadD Wellpad G
Existing OHTL
Wellpad H
Wellpad E New 33kV Cable Connection

Wellpad K
inter change
Existing OHTL TOWER
New Terminal
Wellpad C Tower (Typical for
well pads D,H,K,G
&E)
Wellpad F
New 33kV Cable
Wellpad J from terminal tower
to well pad (Typical
for all well pads)
Existing OHTL TOWER