PTS-20WM319 - 05 - Materials and Technical Specifications
PTS-20WM319 - 05 - Materials and Technical Specifications
PTS-20WM319 - 05 - Materials and Technical Specifications
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
AMT
SECTION-V EQUIPMENT / MATERIALS AND TECHNICAL SPECIFICATIONS
5.1 GENERAL
DRPC Trf options , MV Swgr & cabling, Grounding
& Stn. Service Trf., RTDS, Sec VI modified
The term DRPC mentioned in this PTS refers to both Conventional DRPC and Hybrid
DESCRIPTION
This Section outlines broadly the technical specifications of the major equipment/
materials required for the complete installation of the PROJECT. The specifications
outlined herein shall be read in conjunction with the attached PROJECT drawings, the
COMPANY Material Standard Specifications and the associated International
Standards and Codes. The ratings and specific requirements of various electrical
NO.
REVISIONS Specifications, and the CONTRACTOR shall ensure full conformity with the same.
PREPARED BY: AAA /AMT All equipment/material shall be supplied from COMPANY’s List of Technically
Acceptable Manufacturers (LOTAM) and conform to the related COMPANY standards
and other applicable standards in accordance with Section 3.14 of this PTS.
DATE: 06 May 2020
b) 132kV GIS and all taps of CT and PT secondary winding shall be brought to an
easily accessible location such as a Local control Cubicle / Marshalling Kiosk.
APPROVED
a) 13.8kV Switchgear shall be provided with indoor SF6 or vacuum type circuit
breaker conforming to COMPANY standards 32-TMSS-01.
CERTIFIED
b) The cable terminal lug for feeders shall be one (1) hole type as per SEC standard
SDS-9.
3. CT/PT
BY: Ahmad M Al-Zahrani
CT/PT shall meet the requirements specified in 50-TMSS-01, 1 and 50-TMSS-03,
DATE: 06 May 2020 respectively.
a. Arrangements for cable support shall be provided for all cables to **kV load
THIS DOCUMENT IS NOT TO
BE USED FOR break switches or CBs / 13.8kV switchgear cubicles / 132kV cable terminations.
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED b. Cable entry points in the trenches / ducts shall be labeled to correspond to its
switchgear cubicle number.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
feeders.
& Stn. Service Trf., RTDS, Sec VI modified
DESCRIPTION
a. The 125V DC auxiliary power supply shall consist of two (2) 100% rated 125V
DC battery bank and two (2) battery chargers each rated 100% capacity (TES-
P-119.30).
REVISIONS
c. The batteries shall be vented, lead acid type.
PREPARED BY: AAA /AMT
d. 125V DC auxiliary power supply system Sub distribution panel boards shall be
provided for the entire modification WORK, including but not limited to
DATE: 06 May 2020 switchgear, control and relay panels including alarms and indications, SCADA
CHK’D BY: MLS
RTU/IFC, communications fiber optics terminal equipment.
7. All struts/supports, clamps and fittings shall be grounded per TES-P-119.10 the
CONTRACTOR shall submit grounding details for COMPANY review and approval.
8. LV Cable Terminations
b. Cable glands shall be used at all equipment to support the weight of the cables.
Compression (indentation) type cable lugs shall be used for all terminations. All
CERTIFIED
conductor joints shall be made at terminal points. All wires associated with trip
circuit shall be clearly marked “TRIP”.
c. All terminals shall be designed to receive (on either side) two (2) nos. of cable
cores of used cross-section. Each terminal block shall be marked for circuit
identification. The terminal blocks for AC and DC circuits shall be grouped
BY: Ahmad M Al-Zahrani separately. Terminal blocks mounting arrangement shall provide easy access to
DATE: 06 May 2020
wires, terminations and ferrules.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
9. Discharging Equipment
AMT
Each Capacitor shall be provided with discharge resistors to bring down the
residual voltage to 50 volts within 5 minutes alternatively to 75 volts within 10
DRPC Trf options , MV Swgr & cabling, Grounding
minutes.
& Stn. Service Trf., RTDS, Sec VI modified
DESCRIPTION
a) Lighting System
The CONTRACTOR shall extend the existing outdoor lighting system to cover
the DRPC and Capacitor bank installation. This shall include relocation of
existing lighting fixtures and addition of new fixtures and masts, if required.
NO.
b) Socket Outlets
DATE: 06 May 2020 The following outdoor type socket outlets shall be provided near the DRPC
CHK’D BY: MLS
Station and Capacitor bank installation area:
i. 400V, 3Ø, 4wire, 300A outdoor type Power supply outlet with MCCB
control at the DRPC transformer for the purpose of connecting oil filter
plant.
ii. 400V, 3-phase, 20A – One (1) no. (at a convenient location in DRPC
Station)
iii. 230V, 1-phase, 20A - Two (2) nos. at the DRPC Station
APPROVED
The socket outlets shall be similar (plugs must be compatible) to the existing
outlets in the substation and shall also conform to TES-P-119.25.
Extra High Voltage
Engineering & Design Department
The specifications outlined herein shall be read in conjunction with the attached
PROJECT drawings, the COMPANY Material Standard Specifications and the
associated International Standards and Codes as listed in section 3.14. The ratings
CERTIFIED
and specific requirements of the various electrical equipment shall be as indicated in
Data Schedule of COMPANY Material Standard Specifications, and the
CONTRACTOR shall ensure full conformity with the same.
As a minimum requirement, all equipment shall be designed and rated to withstand the
full rated requirement of the DRPC. All DRPC equipment ratings shall be adequately
BY: Ahmad M Al-Zahrani sized to carry the maximum steady-state current that can flow in it (square root of the
DATE: 06 May 2020
sum of the squares of the fundamental and harmonic current) and the maximum short
circuit and momentary current due to faults that can flow in it. In addition, equipment
shall be rated to withstand the maximum steady-state, harmonic and short term
voltages that can appear across it.
THIS DOCUMENT IS NOT TO
BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
most onerous operating conditions, without loss of life. Taps (on load or off load)
& Stn. Service Trf., RTDS, Sec VI modified
The flux density shall be appropriate for the excitation conditions under the
voltage range specified.
flux density reached over the full steady state range, and the bidder should state
REVISIONS the margin by which it is exceeded. The bidder should also state the steel
quality to be used and its reasoning for selecting the margin. There is no specific
PREPARED BY: AAA /AMT margin required considering that this maximum flux density (over the full DRPC
range) is obtained at the highest secondary voltage (phase and line voltages)
during any reactive power generation, highest reference voltage, minimum
DATE: 06 May 2020
slope, worst combination of negative sequence, tolerances and internal failures
CHK’D BY: MLS and minimum continuous frequency. The contractor shall submit B-H curve to
substantiate this requirement. The flux density at the highest secondary voltage
shall lie in the linear portion of the B-H curve. Any harmonic generated by the
transformer should be considered by the design of the DRPC.
The cooling system for transformer should be equipped with extra fan motors as
spare (minimum three for each transformer) if necessary.
Harmonic Content: The Contractor shall clearly indicate the Harmonic content
APPROVED
(HV and MV) that the transformer shall be subject to under the worst case
Extra High Voltage
conditions. This information shall be provided on DRPC Schedule B as well as
Engineering & Design Department
for the detailed transformer.
FACTS Projects Engineering
Engineering & Design Division
The transformer shall comply with the COMPANY Standard 53-TMSS-01 and all
requirements stated in this specification. The type testing shall include a heat
run (temperature rise test) test on a single unit. The manufacturer shall submit
type test reports of similar transformers. Dielectric test shall be carried out as
CERTIFIED
type and routine tests. The manufacturer shall carry out all routine tests as per
53-TMSS-01 and in addition the following special tests for the DRPC
transformer:
d) Temperature rise test by injecting 60Hz rms current equivalent to the current
THIS DOCUMENT IS NOT TO
BE USED
CONSTRUCTION OR FOR
FOR that produces total transformer losses including the additional losses due to
ORDERING
UNTIL
MATERIALS
CERTIFIED AND
harmonics.
DATED
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
Reactors used for VSC/TCR/TSR/TSC branches and filter shall be of the dry
& Stn. Service Trf., RTDS, Sec VI modified
The reactors shall comply with the COMPANY Standard 58-TMSS-02 and all
requirements stated in this specification. It is acceptable to use Aluminium
conductors for all air core reactors.
With respect to double tuned filter banks and VSC converter filters, it is required
to oversize (current) low voltage reactor. The rating shall be 1.5 times the
NO.
REVISIONS
Air core reactors used for VSC/TCR/TSR/TSC branches and filters shall be
PREPARED BY: AAA /AMT physically protected against pollution, rain, animals (such as birds nesting, etc.,).
3. Capacitor Banks
DATE: 06 May 2020
The capacitor/filter banks shall comply with the COMPANY Standard 43-TMSS-
01, and all the requirements stated in this specification.
APPROVED
The capacitors shall have temperature class -5D or better.
Extra High Voltage
Engineering & Design Department Sunshades shall be provided for all types of capacitor banks. The shades shall
FACTS Projects Engineering
extend minimum 1.0 m from the projection of the capacitors.
Engineering & Design Division
CERTIFIED Capacitance variation as well as loss angle tan (δ) due to temperature shall be
added to the type test assessment. The capacitance variation shall be based on
energized capacitors.
With respect to double tuned filter banks and VSC converter filters, it is required
to oversize (voltage) low voltage capacitor. The rating shall be 3 times the
BY: Ahmad M Al-Zahrani maximum calculated voltage (arithmetic sum) including harmonics.
DATE: 06 May 2020
a. Fuses
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
b. Neutral
AMT
The neutral of the DRPC capacitor and filter banks shall be floating.
DRPC Trf options , MV Swgr & cabling, Grounding
4. Resistors
& Stn. Service Trf., RTDS, Sec VI modified
DESCRIPTION
Resistors used for filters shall be of the dry type suitable for outdoor use.
It is required to oversize all filter resistors. The rating shall be sqrt(2) times the
maximum calculated current (rms) including harmonics. The margin 1.2 for
background harmonics shall also be added.
shall be low built with a grounded enclosure. The neutral resistor shall meet the
3
REVISIONS requirements of 57-TMSS-01. The filter resistors shall meet the requirements of
57-TMSS-02.
PREPARED BY: AAA /AMT
DATE: 06 May 2020 a. The DRPC MV Load Break Switches shall be suitable for DRPC switching
CHK’D BY: MLS
duty.
c. The Load break Switches shall comply with the COMPANY Standard 30-
TMSS-01; all LBSs shall be motor operated to facilitate DRPC control
switching
d. Minimum clearance for load break switches (phase to phase) shall be the
APPROVED essentially the same as for the DRPC medium voltage bus and it shall not be
less than 1.0 meter.
Extra High Voltage
Engineering & Design Department
The surge arresters supplied for the DRPC shall comply with the COMPANY
Standard 35-TMSS-01.
CERTIFIED Selection and sizing of the arresters for the DRPC installation shall be done
taking also into account future shunt capacitors to be located at DRPC
substation, overvoltage due to switching, ferroresonance, etc.
7. Current Transformers
BY: Ahmad M Al-Zahrani All the current transformers included in the bid for DRPC component protection,
indication, measurement and control purposes shall comply with the COMPANY
DATE: 06 May 2020
Standard 50-TMSS-01.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
Disconnectors and earth switches shall be required as shown on the Single Line
Drawing No. WT-924149. Disconnectors shall be motorized and earth switches
shall be manually operated. Disconnector and earth switches shall be
interlocked as mentioned in 30-TMSS-01.
The disconnectors and earth switches shall comply with 30-TMSS-01, and all the
NO.
DATE: 06 May 2020 The disconnectors shall be used to isolate an affected VSC, filter, grounding
CHK’D BY: MLS
transformer, TCR/TSR or TSC when this has developed a fault. This isolation
shall be carried out through either of the following methods described below:
c. 132kV earthing switch shall be motor operated. The earthing switch shall be
mechanically and electrically interlocked with 132kV circuit breakers.
CERTIFIED
The outdoor station post insulators shall comply with 15-TMSS-01. In addition,
the following requirements shall be complied with:
BY: Ahmad M Al-Zahrani a. A minimum clearance distance between live parts of different phases or from
DATE: 06 May 2020
phase to earth shall be maintained for all outdoor equipment as per TES-P-
119.08. These requirements relate specifically to the phase-to-phase and
phase to earth clearance and shall not form part of the insulation class of the
MV power plant and material. This is to prevent damage due to animal/bird
contact with live outdoor equipment.
THIS DOCUMENT IS NOT TO
BE USED FOR
CONSTRUCTION OR FOR
ORDERING
UNTIL
MATERIALS
CERTIFIED AND
b. The minimum height above ground level for all live parts of outdoor plant
DATED and material shall be shall be as per TES-P-119.08.
c. All live parts of outdoor plant and material (busbars, connection, clamps,
etc.) which are closer than 440mm either to earth or to any other live parts (if
PTS- 20WM319 Final_R1
SCOPE OF WORK & TECHNICAL SPECIFICATION FOR PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
INSTALLATION OF DYNAMIC REACTIVE POWER
COMPENSATION (DRPC) AT TABUK 380kV BSP PTS- 107
JOB ORDER NO.
Of 01
TABUK SAUDI ARABIA SE0437 A 20WM319
133
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
itself insulated from earth. The frame insulation shall at least be equal to
the full capacitor bank line-to-ground potential in the case of two bushing
capacitor cans or a minimum of 440mm in the case of single bushing
capacitor cans.
ii. Standard items of plant and material such as isolators, CT's, VT's, circuit
breakers, and wall bushings which have a voltage rating of 34.5kV or
NO.
greater.
REVISIONS
11. Thyristor Valves
PREPARED BY: AAA /AMT
APPROVED The number and rating of thyristors used to form each valve shall
meet the overall performance requirements. The valves shall have
Extra High Voltage
Engineering & Design Department sufficient margin to enable rated output to be maintained
FACTS Projects Engineering
continuously with:
Engineering & Design Division
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
DRPC equipment.
REVISIONS
• Overvoltages due to control malfunction such as false firing of the
PREPARED BY: AAA /AMT
valve, loss of firing signal, maloperation of the voltage control loop
and loss of synchronization.
CHK’D BY: MLS example, improper firing, forward recovery protection or VBO firing.
• The BIDDER shall provide proof that the valves including the stack
assembly, cooling pipes and valve electronics can operate at
55°Cambient (outdoor) temperature at maximum current
continuously. If insufficient proof is provided the CONTRACTOR
shall perform relevant tests during project execution.
APPROVED
Transformer saturation shall not be considered in calculating the above
stresses, except where it increases those stresses.
Extra High Voltage
Engineering & Design Department
Voltage grading shall be provided to uniformly distribute the voltage
FACTS Projects Engineering
Engineering & Design Division across each thyristor level within the valve and, together with the
overvoltage protection devices provided, protect the thyristors against
forward and reverse blocking voltages above the thyristor rating.
CERTIFIED
The thyristor valve components which are the main heat-generating
components (e.g. thyristors, damping and grading components, valve
reactors, gating circuits and current carrying connections within the
valve) shall be designed to withstand the thermal stresses which affect
their operating characteristics.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
valve is fired during a transient overvoltage across the valve. (If the
REVISIONS valve is permitted to be fired during the overvoltage)
PREPARED BY: AAA /AMT Where the individual thyristor levels are protected by VBO firing or by
metal oxide varistors (MOV) against partial blocking or failure of
some thyristor levels, such protection shall be capable of repetitive
DATE: 06 May 2020
operation, and such operation shall not overstress the thyristor level
CHK’D BY: MLS components. If a surge arrester connected in parallel with the valve
is also provided, the VBO or MOV level shall be properly coordinated
with the protection level of the surge arrester.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
The thyristor valves and other valve hall plant and material shall be
DESCRIPTION
designed to minimize the risk of fire being initiated within the valve
hall and to limit the consequences of such a fire should it occur. The
use of flammable materials in the valves shall be minimized as far as
practicable. Where such materials cannot be avoided, such materials
must be demonstrated to exhibit self-extinguishing capability equal to
or better than the Underwriters Laboratory UL-94-V0 classification for
vertical material, and UL-94 HB for horizontal material.
NO.
PREPARED BY: AAA /AMT The cooling medium shall have adequate dielectric withstand
capability and an alarm for high conductivity of the cooling liquid.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
1. Rated Voltage
DESCRIPTION
4. Identification number
NO.
xi. Heat-sinks
3
REVISIONS
The heat-sinks for the thyristors shall be treated to ensure good
PREPARED BY: AAA /AMT electrical contact without risk of corrosion. The CONTRACTOR shall
supply information on the material used and its performance
characteristics.
DATE: 06 May 2020
BY: Ahmad M Al-Zahrani iv. Trigger Pulse Supervision Under voltage Strategies
DATE: 06 May 2020
There should be (phase-wise operating) supervision of the
correlation between the triggering pulses to the thyristor valves
and the measured valve currents.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
REVISIONS thyristors to protect them from direct blocking voltage throughout the
anticipated conduction period.
PREPARED BY: AAA /AMT
d. Testing
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
be used in this project. The cost of the type tests shall be included in
& Stn. Service Trf., RTDS, Sec VI modified
the LSTK price, if relevant type tests certificates are not available
DESCRIPTION
Type tests shall be carried out in accordance with IEC 61954. The
CONTRACTOR shall provide a detailed description of the test
program and test procedures.
Routine tests shall be carried out in accordance with IEC 61954. The
NO.
PREPARED BY: AAA /AMT All components of the valve should be subjected to rigorous testing,
inspection and quality assessment.
DATE: 06 May 2020 iv. Thyristor Auxiliary Plant and material Tests
CHK’D BY: MLS
A list of all tests to be performed on all auxiliary plant and material
associated with the thyristor shall be submitted to the COMPANY for
review and comment.
The CONTRACTOR shall supply two AC auxiliary supplies to the DRPC from
the Auxiliary transformers. The CONTRACTOR shall determine the AC and DC
auxiliary supply demands for the DRPC control and protection systems. The
PTS- 20WM319 Final_R1
SCOPE OF WORK & TECHNICAL SPECIFICATION FOR PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
INSTALLATION OF DYNAMIC REACTIVE POWER
COMPENSATION (DRPC) AT TABUK 380kV BSP PTS- 115
JOB ORDER NO.
Of 01
TABUK SAUDI ARABIA SE0437 A 20WM319
133
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
The DRPC system shall include all the AC and DC boards and distribution
DESCRIPTION
circuits sufficient for power supplies necessary for its operation and to supply all
fans, pumps, valves and valve controls, and building cooling, heating and
ventilation systems.
14. Grounding
PREPARED BY: AAA /AMT In particular the CONTRACTOR shall ensure that there are no closed loops in
the DRPC grounding system in the DRPC MV yard. All structural and fence
work, metal work, including foundations; to avoid as far as possible metallic
DATE: 06 May 2020 loops and parallel circuits in which induced current can flow.
CHK’D BY: MLS
15. Civil Works
The CONTRACTOR shall design the DRPC civil and structural works in
accordance with international best practice and in particular shall ensure that
there are no closed metallic loops in any of the foundations in the DRPC MV
yard.
RTV coating shall be provided for all outdoor equipment insulators and cast resin
CTs and VTs provided under this project as per 01-TMSS-01 and 15-TMSS-07,
CERTIFIED
a. General Description
The VSC valves shall comply with the requirements of 59-TMSS-03 and
BY: Ahmad M Al-Zahrani International Standards.
DATE: 06 May 2020
i. The valves shall be designed to ensure satisfactory operation according to
the overall performance requirements and include all necessary auxiliary
equipment.
THIS DOCUMENT IS NOT TO
BE USED FOR ii. The valves shall be indoor air-insulated and of a water cooled type.
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED iii. The valves shall be of modular or sectional design and have removable
components for ease of maintenance. The semiconductor switches and
valves shall be mounted to allow easy access for visual inspection, routine
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
REVISIONS
ii. Semiconductor Switches - The valve shall be designed with semiconductor
PREPARED BY: AAA /AMT switches applied in a conservative manner with regard to their basic
design parameters. The semiconductor valves shall comply with the
requirements of IEC and IEEE Standards. The BIDDER/CONTRACTOR
DATE: 06 May 2020 shall provide a standard data sheet of ratings for the semiconductor
CHK’D BY: MLS
switches offered.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
iii. Voltage Distribution – The valve shall be designed to provide equal voltage
AMT
sharing for all voltage wave shapes ranging from dc to steep front,
together with the overvoltage protection devices provided, protect the
semiconductor against blocking voltages above the semiconductor rating.
DRPC Trf options , MV Swgr & cabling, Grounding
BIDDER shall provide details about the voltage distribution in the proposal.
iv. Redundant Levels - Redundant levels are levels which may become short-
circuited during service without impairing the ability of the VSC phase unit
to meet its performance requirements. A minimum of 10% redundant
levels (but not less than one) are required in each single phase valve. The
actual number will be determined based on the stated requirements for
NO.
CHK’D BY: MLS v. Valve Reactors - Valve reactors may be provided within the semiconductor
switch levels or in series with the valves to limit semiconductor switches
di/dt and du/dt stresses and limit radio interference.
vi. Replacement of failed valve levels - The valves shall be designed to allow
easy replacement of failed semiconductor switch and other electrical
components in the valve. It shall be possible to replace faulty
semiconductor switches without significant leakage of the cooling circuit
and with minimum disturbance to other plant and material.
APPROVED
ix. The valve shall be designed for the maximum overvoltage and overcurrent
stresses due to system faults and switching.
THIS DOCUMENT IS NOT TO
BE USED
CONSTRUCTION OR FOR
FOR The semiconductor valve components which are the main heat-generating
ORDERING
UNTIL
MATERIALS
CERTIFIED AND
components (e.g. semiconductor switch, damping and grading
DATED
components, valve reactors, gating circuits and current carrying
connections within the valve) shall be designed to withstand the thermal
stresses which affect their operating characteristics.
PTS- 20WM319 Final_R1
SCOPE OF WORK & TECHNICAL SPECIFICATION FOR PLANT NO. INDEX DOCUMENT NO. PAGE NO. REV.
INSTALLATION OF DYNAMIC REACTIVE POWER
COMPENSATION (DRPC) AT TABUK 380kV BSP PTS- 118
JOB ORDER NO.
Of 01
TABUK SAUDI ARABIA SE0437 A 20WM319
133
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
cooling liquid.
REVISIONS
xi. Each valve level shall be provided with a corrosion-resistant identification
PREPARED BY: AAA /AMT showing the following minimum information:
1. Rated Voltage
DATE: 06 May 2020
4. Identification number.
xii. Heat-sinks. The heat-sinks for the semiconductor switch shall be treated to
ensure good electrical contact if necessary without risk of corrosion. The
CONTRACTOR shall supply information on the material used and its
APPROVED
performance characteristics.
Extra High Voltage
Engineering & Design Department xiii. Semiconductor Firing Pulse Synchronization and Generation. The
FACTS Projects Engineering semiconductor firing pulse synchronization and generation systems must
Engineering & Design Division
be able to operate under the following conditions:
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
and after fault clearing on the AC network for faults lasting in accordance
AMT
with Schedule A in Appendix II. Successive misfires shall not occur.
xiv. The BIDDER / CONTRACTOR shall provide all design factors and
margins, including calculated design factors and margins, marginal
settings and manufacturing margins for COMPANY as part of the bid and
design phase respective reports.
The semiconductor valves and other valve hall plant and material shall be
designed to minimise the risk of fire or an electrical arc being initiated
within the valve hall and to limit the consequences of such a fire shall it
occur. The use of flammable materials in the valves shall be minimised as
BY: Ahmad M Al-Zahrani
far as practicable. Where such materials cannot be avoided, such
DATE: 06 May 2020 materials must be demonstrated to exhibit self-extinguishing capability
equal to or better than the Underwriters Laboratory UL-94-V0 classification
for vertical material, and UL-94 HB for horizontal material.
f. Valve Tests
THIS DOCUMENT IS NOT TO
BE USED FOR
CONSTRUCTION OR FOR
ORDERING
UNTIL
MATERIALS
CERTIFIED AND
The BIDDER shall describe the routine and type test (dielectric tests and
DATED operational tests) to be carried out for the proposed valve design. Type
test assessment and previously performed type tests shall be attached to
the bid.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
g. VSC branch
AMT
The VSC branch shall be designed as per requirements in this PTS. In
addition following requirements shall be fulfilled;
DRPC Trf options , MV Swgr & cabling, Grounding
& Stn. Service Trf., RTDS, Sec VI modified
i. The VSC branch shall be designed for operation consistent with the V-I
DESCRIPTION
down to voltage of 0.3 pu below this voltage the VSC shall be blocked
REVISIONS and the DRPC shall remain connected to the system, ready for
immediate voltage control as soon as the HV voltage is above 0.3 pu
PREPARED BY: AAA /AMT iii. The VSC branch shall support TSC blocking for a sudden increase in
mains voltage up to 1.5 pu The Hybrid DRPC is supposed to run fully
capacitive at moment of voltage rise. The VSC branch is not allowed to
DATE: 06 May 2020
block/trip until TSC(s) is switched out.
CHK’D BY: MLS iv. VSC coordination with thyristor switched devices (TSC/TSR/TCR) shall
be detailed described in design phase.
v. Conventional relay protection (overcurrent, differential, thermal
overload etc.) shall be provided for the VSC. Special types of
protection (not available in conventional relays) shall be integrated in
the DRPC Hybrid Control and Protection system and shall be justified
by the BIDDER/CONTRACTOR. Special protective control functions
shall comply with the requirements in IEC and IEEE for the respective
APPROVED
protective relays and functions.
CERTIFIED
The local control panel of the 13.8kV/**kV metal clad indoor switchgear shall conform
to 32-TMSS-01, and that of the SF6 Switchgear shall conform to 32-TMSS-02.
All equipment provided under this contract shall comply with the COMPANY’s general
requirements for transmission system protection that are set out in Appendix-VII to this
BY: Ahmad M Al-Zahrani
specification.
DATE: 06 May 2020
C. Control
All equipment provided under this contract shall comply with the COMPANY’s SCADA,
THIS DOCUMENT IS NOT TO
DSM and SOE requirements that are set out in Appendix-IX to this specification.
BE USED FOR
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
The terminals required for metering connections as specified for the SCADA/RTU,
SOE, Substation Mimic panel, DRPC Automation System (where applicable) shall be
provided for all the equipment provided by this contract.
B. DRPC Station
NO.
The meters shall conform to the scales provided below. The scale of the meters shall
REVISIONS be as follows:
Voltmeter: 0 -200kV
DATE: 06 May 2020
Ammeter: 0 - 3500A for line, 0 - 3500A for transformer
CHK’D BY: MLS Wattmeter: 10-0-10 MW for Transformer
VARmeter: 200-0-500MVAr for Transformer
Voltmeter: 0 -**kV
Ammeter: 0 - ****A for line, 0 - ****A for transformer
3. 13.8kV System
APPROVED
BY: Ahmad M Al-Zahrani Four (4) Voltmeters with Selector 0 - 500V (one for each incomer and
DATE: 06 May 2020
Switches: each bus section)
Three (3) Ammeters with Selector Range to be determined by
Switches: CONTRACTOR (one for each
incomer and bus tie)
THIS DOCUMENT IS NOT TO
BE USED FOR The AC main distribution scheme shall be as per figure 30-2 of TES-P-119.30.
CONSTRUCTION OR FOR
ORDERING MATERIALS
UNTIL CERTIFIED AND
DATED Each bus Voltmeter shall be provided with phase selector switch.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
The range of meters indicated is tentative and will be confirmed during detailed
engineering stage.
The metering scales of extensions of Auxiliary feeders shall match the existing
metering scales.
NO.
Note:
3
REVISIONS
1. The accuracies of all meters shall be in accordance withTES-P-119.31.
PREPARED BY: AAA /AMT 2. The range of the meters indicated is tentative and may change during
base/detailed engineering stage.
3. The DPDM should be able to be configured for any CTR/PTR and forward and
DATE: 06 May 2020 reverse directions.
CHK’D BY: MLS
5.5 ALARM AND ANNUNCIATOR SYSTEM
A. The alarm and annunciator system shall meet the functional requirements of the
Company’s Annunciator System standard (38-TMSS-05).
A. General
BY: Ahmad M Al-Zahrani
The CONTRACTOR shall provide necessary interlocks for safe operation of the
DATE: 06 May 2020 electrical system at the Substation control room, DRPC Station control room and
Control Centre. The CONTRACTOR shall provide a detailed interlocking scheme to
COMPANY for approval. Necessary auxiliary relays, contacts, etc. required to facilitate
the implementation of interlocking system shall be provided. All the interlocking wiring
THIS DOCUMENT IS NOT TO
shall be hard wired.
BE USED FOR
CONSTRUCTION OR FOR
ORDERING
UNTIL
MATERIALS
CERTIFIED AND B. 380/132/33kV Substations
DATED
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
system and submit a detailed interlocking scheme to the COMPANY for approval. This
AMT
interlocking shall be realized inside the GIS/AIS control panels and DRPC/Capacitor
Bank control and monitoring system. Any additional interlocking requirements shall be
included in the scope of the PROJECT as mandatory to ensure a safe operation. This
DRPC Trf options , MV Swgr & cabling, Grounding
interlocking is in addition to the mechanical and electrical interlocking that the supplier
& Stn. Service Trf., RTDS, Sec VI modified
of the GIS switchgear will provide as part of the other scope of work excluded from this
DESCRIPTION
contract.
2. For double bus schemes, the disconnect switches shall be prevented from
NO.
switching / interrupting any load current and opening of either one of the two
REVISIONS Bus disconnects shall be prevented if the other one is open and the associated
breaker is closed.
PREPARED BY: AAA /AMT
3. The circuit breakers shall be allowed to close only when the associated
disconnects are in either fully closed or fully opened position.
DATE: 06 May 2020
CHK’D BY: MLS C. Interlocks Between MV Load Break Switches/Circuit breakers/Disconnectors and
MV Earth Switches
All interlocks between the MV Load Break Switches/ Circuit breakers / disconnectors
and MV earth switches shall be hard wired and supported by software interlocking.
The interlocks shall be such that when any of the MV earth switches are closed the
respective circuit breaker / disconnector shall not open or close by control from the
mechanism box (local) either electrically or mechanically or from the Mimic panel /
HMI or the COMPANY’s Network Control Centre (remote).
APPROVED
D. DRPC LBS/ES
When the LBS / Disconnector for TSC, VSC, Filters opens, the associated grounding
CERTIFIED
switch shall be closed with time delay till capacitor bank terminal voltage reduces to
50 volts (for which the CONTRACTOR shall provide necessary calculations for
COMPANY review and acceptance)
All equipment provided under this contract shall comply with the COMPANY’s
BY: Ahmad M Al-Zahrani
DATE: 06 May 2020 Substation Automation System (SAS) requirements that are set out in Appendix - IX to
this specification.
A
CERT.
الشركة السعودية للكهرباء
AMZ
SAUDI ELECTRICITY COMPANY
CHK’ D APP’ D
D. High quality metallic desks for placing HMI and chairs inside the control room.
DESCRIPTION
For Fire Detection, Alarm, Safety & Fire Fighting System requirements refer to
NO.
Appendix-XII A.
REVISIONS
CERTIFIED
**** END OF SECTION- V ***