Auction Catalogue: Post Auction Related Contact Details
Auction Catalogue: Post Auction Related Contact Details
Auction Catalogue: Post Auction Related Contact Details
Contact Details: Contact person for Inspection : Arjun Rao - 9686702185 (arjun.raomk@tatasteel.com)
CIN L27100MH1907PLC000260
Delivery Order Related 033-44091806/8336988814 mjbpo.group@mjunction.in
033-66011719 / 44091719 /
Material Value Refund Related mjbpo.group@mjunction.in
8336988825
033-44091849 / 44091789 /
TCS Related mjbpo.group@mjunction.in
66106326 / 8336033395
Payment Deviation/Disablement in Tata 033-66031759 / 44091882 /
mjbpo.group@mjunction.in
Steel 8336993678
Collection of Delivery Order for Tata
0657-6519985 / 7033098848 mjbpo.group@mjunction.in
Steel- Jamshedpur
Collection of Delivery Order for Tata
7328820748 / 7328804998 mjbpo.group@mjunction.in
Steel- Kalinganagar
Type in www.metaljunction.com> Go to "Important Links"
For time bound resolution of unresolved issues log into our
> Click on "Customer Complaints"> Log in with your user
customer care portal
id and password and write the details of issue.
For Any unresolved Issues beyond two (02) days mail to : Rajeev Upadhyaya Rajeev.Upadhyaya@mjunction.in
mjunction Copy to
Copy to Tata Steel Ltd : Anil Kumar <anil.kumar6@tatasteel.com>
For Material Delivery related issue at Tata Steel CRC ( West ) : Arjun Rao - 9686702185 (arjun.raomk@tatasteel.com)
CIN L27100MH1907PLC000260
Kumar on.in Virender Dhaniya Faridabad 9958001157 virender.dhaniya@mjunction.in
CIN L27100MH1907PLC000260
Pankaj Nagpure Nagpur 7030914855 Pankaj.nagpure@mjunction.in
LIST OF MATERIALS
CIN L27100MH1907PLC000260
2 Tarp/10 Tarp/10 HR COIL ENDS M. NO. 35603 160.0000 18% RSPMT Rs.100/- PMT NA 1.00%
(FROM COLD ROLLING MILL COIL
WEIGHT UPTO 0.499 MT
(STOCK+ARISING) (Yankee Type, Qty
160 MT, Lot size 40 MT)
3 TARP/2 TARP/2 CR SIDE TRIMMINGS IN 60.0000 18% RSPMT Rs.100/- PMT NA 1.00%
BUNDLE (M.NO. 35585)
(STOCK+ARISING ). 60 MT (Dynamic
Rank Based)
4 TARP/3 TARP/3 HR CUT ENDS (PICKLED / 11.0000 18% RSPMT Rs.100/- PMT NA 1.00%
UNPICKLED) (M.NO. 35586 )
(STOCK + ARISING ). 11 MT (Dymamic
Rank Based)
5 TARP/6 TARP/6 CR BABY COILS (SOFT) THIS 12.0000 18% RSPMT Rs.100/- PMT NA 1.00%
MATERIAL MAY HAVE SOME DEFECTS
ON SURFACE / EDGES MAY BE NON -
SKIN PASSED. M. NO. 35589
(STOCK+ARISING) 12 MT (Dynamic Rank
Based)
6 TARP/8 TARP/8 CR MIXED CUT SHEETS 10.0000 18% RSPMT Rs.100/- PMT NA 1.00%
(GENERATED FROM MBL and CTL,
AFTER SLITING CRS FOLDED SHEET &
10% HRPSO SHEET) MATERIAL MAY
HAVE DEFECTS ON SURFACE/EDGES
1% MATERIAL 50 MM WITH INCLUDING
IN TOTAL QTY.INCLUDING MINOR
RUST. M.NO. 35601 (STOCK+ARISING )
10 MT(Dynamic Rank Based)
CIN L27100MH1907PLC000260
7 TARP/9 TARP/9 MELTING SCRAP M. NO. 35602 20.0000 18% RSPMT Rs.100/- PMT NA 1.00%
( INCLUDING QC TESTED SAMPLES
GALVANISED PCS OF PACKING
MATERIAL FORM TCL and SPM
WELDED SHEETS. (STOCK+ARISING)
20 MT (Dynamic Rank Based)
SPECIAL NOTE: - It is the responsibility of the buyer to furnish the valid GST no. & necessary documents to Mjunction before participating in the auction. In case
during the transactions, it is found that valid GST no. has not been provided, then all necessary liabilities if any & so accrued would be on account of the buyer.
TATA Steel & Mjunction would not be responsible for any such liabilities.
CIN L27100MH1907PLC000260
TSL reserves the right to track IP address, MAC number and geolocation of bidding customers whenever customers participate in any auction on the mjunction
auction platform for TATA Steel.. Further, Customers are requested to install the necessary apps in the devices we use for log in and bidding in mjunction
auction platform to enable tracking of the MAC number and geolocation.
1. Requirements of participation:
1.1 Registration: Before participation in the e-Auction, a prospective bidder shall be required to get registered with mjunction services limited. For details visit
https://www.metaljunction.com
1.2 Security Deposit: Non-Interest bearing security deposit of Rs. 50000 (Rupees Fifty Thousand only) through Online Payment only : Details as under :
Account No:
All the customers will have a unique account number. The unique account number is an alpha numeric code consisting of 13 characters. The Customer’s
unique “account number” is a combination of the MJ’ SAP code along with the 7 digit bidder SAP ID and can be used as reference for all subsequent
transactions. The Customer’s Account Number detail is available in “Profile” after the customer logs into our website using the user id and password
TSL SAP code has been made mandatory for participation in TATA IBMD auctions.
CIN L27100MH1907PLC000260
Please check your corresponding TSL SAP Code in your profile page. To find the Training Manuals for help, Please go to the tab
Training after Login. If you are unable to locate your TSL SAP Code please contact 033-66106150 ; 8336925968 and 033-66106178 ;
9163348196 for submission of the documents.
“ buyers needs to be careful and serious enough while bidding against any lot, and any bid received by our auction system from the
buyer’s registered ID will be considered as final bid from that buyer.”
Customers are advised to ensure that they inspect the materials on offer on the scheduled date as mentioned in the catalogue, before participating in the
auction. It is
reiterated that all materials are offered / sold by Tata Steel on “AS-IS-WHERE-IS” and “NO-COMPLAINTS” basis and no complaint what so ever shall be
entertained regarding
the quality of materials after the sale. Further, TATA Steel would not accept any claim from any customer for non-inspection of materials”
“Material Specification & Photographs if any given in the catalogue is indicative only.”
3. Bidding modalities:
3.1 Price Bid Basis: In Indian rupees as per unit of measurement as given in Material List. Price to be quoted is Basic Ex- TARAPORE Only exclusive of excise
duty, Sales tax and any other statutory levies.
3.2 Type of Auction : Yankee Type & Dynamic Rank Based
3.3 Bid Increment : Rs/- 100 PMT
CIN L27100MH1907PLC000260
3.4 Bid Validity: Bid shall be valid for 10 (ten) working days ,excluding Sundays and holidays, counted from the next day of auction process in case
of auction against a catalogue which is completed on the same day. In case auction is continued on any other day the counting of days for lot
confirmation shall be from the next day of completion of entire auction process.
3.5 Bid Duration : 45 Mins
4.4 Delayed Payment Charges (DPC) : Installment payments with DPC @ five (05) paise per Rs. 100 per day will be accepted up to two (02) working days from due
date of installment payment as mentioned in the confirmation letter. This is not applicable for EMD payment.
4.5 Only Sundays are excluded for counting purpose for payment schedule.
4.6 In the event of Non-Receipt of Payment within the stipulated period of Payment, the Sale Offer for the approved Lot shall stand withdrawn automatically.
4.7 Buyers have to send the payment deposit slip (UTR No /Scan Copy of NEFT/RTGS Transaction Slip) against Lot No. immediately after the payment to
mjunction services limited. Email id: mjbpo.group@mjunction.in
4.8 Tin of TSL : 20251001839
4.9 Second and Fourth Saturday of month is excluded for counting purpose of payment schedule as per notification of RBI.
CIN L27100MH1907PLC000260
compliance made in IT Portal by the customer after 28th June-21, then it shall be communicated to Metal Junction over mail. In case of non-compliance as per
section 206AB of Income Tax Act 1961, higher rate of TCS @ 5% will be charged during invoicing.
3. W.e.f 1st of July 2021, invoicing will be done as per new Income Tax provisions.
4. Form 27C & Form 27G shall become inoperative & higher rate of TCS shall be charged, if the customer defaults u/s 206AB of Income Tax Act 1961.
IMPLEMENTATION OF TAX COLLECTED AT SOURCE (TCS) ON SALE OF GOODS WITH EFFECT FROM October 1, 2020
Finance Act 2020 introduced a new Section 206C (1H) for extending the scope of Tax Collected at Source (TCS) on sale of any Goods with effect from 1st of October
2020. Hitherto, TCS was only applicable on sale of certain specific category of goods e.g., Scrap, Coal etc.
In view of above amendment TCS component will be incorporated in all our sales invoices and Debit notes after GST component i.e., TCS will be computed on total
invoice value inclusive of GST. You are requested to process payment of the Sales Invoice inclusive of the TCS component. Such TCS component will appear in 26AS
at the end of the quarter and necessary TCS Certificate as per Income Tax Act will be issued.
Note: In case of Scrap & Coal by product sales also (where the current provision of TCS @1% is applicable), TCS will be incorporated in the sales invoices & Debit
CIN L27100MH1907PLC000260
Notes.
Customers are required to submit Form 27C/Form 27G against the month of dispatch/expected dispatches. In the absence of Form 27C, TCS will be charged
at the time of invoicing.
6. Penalties:
6.1 The following penalties shall be applicable in the eventuality of a buyer defaulting in making the payment of EMD (wherever applicable) or first (Single)-
installment, as per the stipulated schedule for each lot, in a financial year:-
In the first instance, a penalty of Rs. 50,000/- (Rupees Fifty Thousand only) shall be recovered from the customer.
CIN L27100MH1907PLC000260
In the second instance, a penalty of Rs. 100,000/- (Rupees One Lakh only) shall be recovered from the customer.
In the third, and any subsequent instance, a penalty of Rs. 150,000/-(Rupees One Lakh and Fifty Thousand only) shall be recovered and the customer
shall be debarred from participating in any auction for a period of three months from the date of debarment.
In the event of any default, the customer’s user id will be disabled and the customer will be blocked from participating in any auction of TSL with immediate effect
The defaulting customer shall be allowed 06 (six) working days to deposit the penalty as mentioned above. In case the penalty is not received within the
stipulated period, the customer’s security deposit shall be forfeited, and the defaulting customer shall be debarred from participating in any auction of TSL.
6.2 If, after making payment of EMD (wherever applicable), the installment payment/s are not made by the customer as per the stipulated schedule for each lot, the
entire EMD amount against such lot shall be forfeited.
6.3 In case of non- lifting of full lot quantity after making full payment, a penalty equivalent to 20% of the material value for the un-lifted quantity against each lot shall
be recovered from the customer.
8. Refund :
8.1 “TATA Steel would make refunds only through online mode wef 15th June 2016. All customers are required to submit necessary details to Mjunction by 15th
June.”
CIN L27100MH1907PLC000260
8.2 Refunds will only be made by TATA Steel vide RTGS/NEFT and hence all customers are required to submit their bank details to mjunction or mail at
mjbpo.group@mjunction.in. TATA Steel or mjunction will not be responsible for any delay in refunds owing to absence of bank details of the customer.
9. Complaints :
Complaints, if any, with regard to any transaction, shall have to be lodge by the buyers within three Months from the date of last invoice. No complaint shall be
entertained thereafter, under any circumstances. Customers can log their complaints at fsc@mjunction.in or can log in CCHP (Turant Upaay).
CCHP Log in Manual: https://www.metaljunction.com/appuploads/file/metaljunction/Bidder_Manual_CCHP.PDF
10. Jurisdiction :
Any dispute arising out of any contract shall be decided in Jamshedpur by the courts in Jamshedpur and by no other courts. The courts in Jamshedpur shall have
exclusive jurisdiction to adjudicate upon any such dispute.
CIN L27100MH1907PLC000260
AGENTS’ PREMISES IS BANNED.
11.12 In addition to earlier safety norms , the following would be compulsory w.e.f 15th June ‘2014 :
The drivers of the vehicle must have the eye test certificate. The frequency of the testing would be as below :
1. If the age of the person is less than 45 years – Once in a year
2. If the age of the person is 45 years or more , the testing is required to be done once in every 6 months
Please ensure to comply with the safety norms
11.13 Wearing proper PPE at all times when inside the plant
11.14 NO driver to be roaming around during loading of vehicles
11.15 Scotch blocks mandatory when under loading or when at halt
11.16 Drivers to be only at designated areas during loading.
11.17 All vehicles to follow ONLY designated route inside the plant as per instruction given at JMD gate
11.18 Vehicles to be parked only at designated areas. All lifters to discuss the same with plant Operations under any confusion
11.19 No speed violation is acceptable under any circumstances
No overloading
CIN L27100MH1907PLC000260
Availability of PPE with Driver in proper condition .
CIN L27100MH1907PLC000260
Sl No. Safety Parameters to be chceked
CIN L27100MH1907PLC000260
Sl No. Documents to be Checked
RC Book
Insurance
Pollution
Driving licence
Fitness for more than 15 years old vehicle
NOC for outside vehicles
The terms & conditions not covered above will be as per Tata Steel’s Secondary General Terms and Conditions.
Revised Standard Terms & Conditions For Tata Steel Secondary Products Auction w.e.f. 1-April-05
Safety Measures : Since 1st July’06 Tata Steel Limited has made it compulsory for all the Transporters to provide the Shoes and Helmets to their Truck Drivers
and cleaners. This is applicable to the Party Transport/ Transporters also.
1. All the scrap lifting contract person should wear required PPE (Shoes, helmet, goggles, hand gloves) Action: Scrap lifting contractor.
2. Scrap loading time will be between 8:30 am to 4:30 pm. After that special permission is to be obtained from Head operation for extension of period.
Action: FG officer.
3. Dispatch department will place the number of Trucks for Scrap loading based on the availability of time and after discussing with FG officer.
4. FG section will instruct the Truck Driver to place the Truck at proper location and then will instruct the Hydra crane operator to load the required material.
5. Scrap lifting Contractor will take inputs from Truck driver and Cleaner on how the material is to be loaded inside the Truck
6. No Truck driver or cleaner will climb on Truck platform during loading operation.
Action: FG officer.
CIN L27100MH1907PLC000260
7. Scrap lifting Contract person will guide the Hydra crane operator while lifting and loading the scrap inside the Truck
8. Truck driver and Cleaner should wear the required PPE (shoes, helmets)
9. No person will stand between Drivers cabin and the material, between sidewalls of the Truck and the material while loading the Trucks. Contract person who will be
guiding the Hydra crane operator should always remain toward the rear end of the Truck.
10. Scrap lifting Contract person should take care of his own safety while loading the Truck.
12. Driver and cleaner should inspect the material and will make sure that the material has been placed properly.
13. Driver and cleaner should tie the material with chain or rope
14. Only after getting confirmation from FG officer the truck will be sent to dispatch for invoicing.
15. At all the times the instruction given by Security department should be followed strictly.
16. Whenever emergency siren rings both Driver and cleaner should report at the security gate.
17. No Truck is allowed to park at sensitive area like between PPC cabin to H2 plant.
Action: Transporter.
18. Diesel transfer from one truck to another truck is not allowed. Action: Transporter.
19. Contract person working with hydra crane should always be keeping himself minimum 3 meter away from crane during crane movement.
Action: Scrap lifting
contractor.
20. Other than hydra crane operator no body should seat or stand inside the crane cabin.
Hydra Crane operator should operate the crane only after getting signal from Contract person.
CIN L27100MH1907PLC000260
Action: Hydra crane contractor
21. Hydra crane operator should ensure that no person is available nearby during crane operation. Action: Hydra crane contractor.
22. Hydra crane should have reverse horn and signal lights in working condition. Action: Hydra crane contractor.
23. During Truck loading Contract person should not be available on Truck platform when crane is in movement or there should not be crane movement when contract
person is standing on Truck platform. Action: Hydra crane operator.
All the actions assigned to the Hydra crane contractor / scrap lifting contractor / Transporter will be supervised by FG officers on regular basis . In case of any deviation
found from the standard practices, a suitable penalty (as per Tata steel rule ) will be imposed to respective contractor in consultation with Head- PPC.
NOTE:
All the above requirements are explained to related contract person in Hindi . In case of change in Driver or Contract person handling Hydra crane , it is a duty of Contractor
to get the requirements explained by FG officer in presence of him. Also FG officer to ensure regular refreshing training for contract person on above SOP.
SPECIAL TERMS AND CONDITIONS FOR INTERNET AUCTION
BANDWIDTH PROBLEMS, CONNECTIVITY PROBLEMS WITH THE LOCAL ISP (INTERNET SERVICE PROVIDER), SLOWNESS TO ACCESS PAGES FOR
DOWNLOADING ETC. ARE BEYOND THE CONTROL OF THE STEEL COMPANY AND METALJUNCTION. HENCE NO RESPONSIBILITY LIES WITH THE STEEL
COMPANY OR METALJUNCTION FOR THE ABOVE PROBLEMS FACED, IF ANY, BY THE BIDDERS BEFORE/DURING THE AUCTION ANY BID PLACED USING THE
BIDDER’S USERNAME AND PASSWORD IS UNCONDITIONALLY BINDING ON THE BIDDER TO WHOM SUCH USERNAME AND PASSWORD HAD BEEN ALLOTTED
AND HE SHALL BE SOLELY RESPONSIBLE FOR MAINTAINING THE CONFIDENTIALITY OF THE SAME AND FULLY RESPONSIBLE FOR ALL ACTIVITIES THAT
OCCUR UNDER THEIR USERNAME AND PASSWORD. HENCE THE USER IS ADVISED TO CHECK THE USERNAME AND PASSWORD BEFORE THE AUCTION IN
ORDER TO FAMILIARISE HIMSELF WITH THE SAME AND IS ADVISED NOT TO REVEAL IT TO ANYONE ELSE SO AS TO PREVENT MISUSE OF THE SAME. THE
BIDS MADE BY THE BIDDERS AGAINST THEIR USERNAME AND PASSWORD SHALL BE IRREVOCABLE.THE BIDDERS ARE ADVISED TO REGISTER AND PRE-
QUALIFY FOR BIDDING WELL IN ADVANCE AND PLACE THEIR BIDS EARLY IN ORDER TO TAKE CARE OF ANY UNFORESEEN TECHNICAL DIFFICULTY THAT
MIGHT SURFACE IN THE INTERNET OPERATIONS.
CIN L27100MH1907PLC000260
c. In case two or more parties bid the same price and quantity, then preference is given to the party that placed the bid earlier.
The above is illustrated below for tonnage wise bidding.
Assume that the total quantity available is 800 mt. and customers bid for certain quantity (in MT) at a certain price as illustrated in following table (minimum bid
quantity is assumed as 200 MT= 1 UNIT):
1. At the testing centre, travel history of driver and customer representative with valid gate pass is to be submitted for testing slip to be issued. Without
proper declaration of travel, testing slip would not be issued which is a mandatory document for entry inside works
2. It is mandatory to have Aarogya Setu Application installed in the mobile or IVRS verified in case personnel does not have smartphone, and would be
CIN L27100MH1907PLC000260
duly checked at the testing centre
3. Customer representative with valid gate pass and driver should have the adequate PPEs including Face Mask and gloves for entry inside works.
Removal of face mask or spitting inside works is strictly prohibited
4. All personnel are required to get the thermal scanning done at the Testing centre to proceed inside works. If anything abnormal is indicated, the
personnel would be directed to the nearest medical facility for further tests
5. Social distancing is to be followed as per the issued government guidelines and must be ensured at all places, including inside works and Transport
Park Area.
6. All the catalogues would be uploaded along with the videos and photographs of the lots and should be referred to understand the quality of the lots.
Any request for physical inspection for the material would not be entertained
7. No visitor gate pass would be issued to any personnel for entry inside works until further notice
In addition to above clauses, for customers visiting SPC/EPA facility regarding inspection of material - Proper PPEs including face mask and gloves
are mandatory for customers during inspection of material at the EPA Facility. EPAs would not allow the entry of personnel in case the above
conditions are not met
8. Covid Vaccination certificate: W.e.f 9th September’2021, all buyers would be required to attach the copies of Covid Vaccination certificate of the
authorized representatives while sending the authorization letter for lifting of materials. Please also be noted that this is required compulsorily for
issuance of Gate pass for the authorized representatives
Declaration to be submitted for all the authorized representative as per the format
In view of Covid 19, it is compulsory to attach the below details as per format for each of authorized representatives along with the lifting authorization
letter for each lot/Delivery order. In case the same is not provided along with the authorization letter duly signed by the organization on their letter
head, the authorization letter will be considered as incomplete and will not considered for further course of action wrt dispatch of material.
1 2 3 4 5 6 7 8 9
CIN L27100MH1907PLC000260
Sl. No. Authorized Aadhar No Mobile No. DO No. Aarogya Setu Last One Contact with Experiencing
Lifter Name Verified month travel a Covid any symptoms
(App/IVRS) history patient (Y/N) like fever, dry
(Y/N) cough,
muscular pain,
breathlessnes
s (Y/N)
Form No.27C
[See Rule 37C]
Declaration under subsection (1A) of section 206C of the Income-tax Act, 1961 to be made by a buyer for obtaining goods without collection of tax
PART II
(For use by the person to whom the declaration is furnished)
1. Name of the Seller - Tata Steel Limited 2. PAN of the Seller - AAACT2803M
3. Complete Address - 43, Jawaharlal Nehru Rd, Kankaria Estates, Park Street area, 4. TAN of the Seller - CALT02940A
Kolkata, West Bengal 700071
REGD. OFFICE - BOMBAY HOUSE,24 HOMI MODY STREET,FORT,MUMBAI -
400001
5. Email - rohit.agarwal@tatasteel.com 6. Telephone No. (with STD Code) and 7. ***Status (Choose among 1 to 6) -
Mobile No. 08017055578 Company
CIN L27100MH1907PLC000260
9. Date of debiting of the amount payable by the buyer to the account of the buyer or receipt of the amount payable from the buyer in
cash or by issue of a cheque or draft or by any other mode (dd/mm/yyyy)
Place: Kolkata Signature of the person responsible for collecting tax at the time of the sale of the goods
Date: referred in Part I.
Notes:
The declaration should be furnished in duplicate.
*Delete whichever is not applicable.
**Indicate the capacity in which the declaration is furnished on behalf of a HUF, AOP, firm, company, etc.
***1=Company; 2=Firm; 3=AOP/BOI; 4=HUF; 5=Individual; 6=Others
Before signing the verification, the declarant should satisfy himself that the information furnished in the declaration is true, correct and complete in all
respects.
Any person making a false statement in the declaration shall be liable to prosecution under 277 of the Income-tax Act, 1961 and on conviction be
punishable-
I. In a case where tax sought to be evaded exceeds twentyfive lakh rupees, with rigorous imprisonment which shall not be less than 6 months but
which may extend to seven years and with fine
II. In any other case, with rigorous imprisonment which shall not be less than 3 months but which may extend to two years and with fine
CIN L27100MH1907PLC000260