Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Never Step Back, Just Move Forward: Our Motto

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

OUR VISION is to provide first class service

and manpower in delivering ultimate service


and conducive environment throughout the
globe.`

OUR MISSION is to secure a high quality OUR MOTTO:


project, deliver the best service for clients and NEVER STEP BACK,
customers, maximize the investment return of
stakeholders and serve the community.
JUST MOVE FORWARD

• Ensure that a project is completed within stipulated time and budget, that the
MUHAMMAD SYAFIEQ BIN ZAKARIA project's objectives are met, and that everyone performs well in respective tasks.
• PROJECT MANAGER • Ensure the desired result is achieved by monitoring work progress, the most
• EARTHWORK DEPARTMENT
efficient resources are used and the different interests involved are satisfied.
• Identify potential stakeholders and delivering the deliverables to the client.

CHUA HUI FEN


• EARTHWORK DEPARTMENT

• Conduct a site investigation and to safely investigate and analyze sites and
determine their present and future stability.
NURFAZREEN BINTI MOHD FAZLLAH
• Guard and maintain the earth's physical environment with appropriate
• EARTHWORK DEPARTMENT
methodology during the development of major public and private projects.
• Suggest proposed level and perform land grading and to reconfigure the topography
of site, and to stabilize slopes.
NADIA FARISHA BINTI NAZLI
• EARTHWORK DEPARTMENT

IQBAL HADI BIN HAMZAH RAHMAN


• COST ESTIMATING DEPARTMENT
• Determine the probable cost of the product before the actual manufacturer starts.
• Carry out cost estimation by taking into consideration all expenditure involved in the
design and manufacturing. along with all related service facilities such as machines
MUHAMMAD ANWAR HADI BIN ZAINOL setting, tool making and administrative costs.
• COST ESTIMATING DEPARTMENT

MUHAMMAD AIMAN BIN PONNIRAN


• WATER RECULATION DESIGN
• Create a water distribution networks which have to be collected and then treated
DEPARTMENT before distributed to the consumer
• Implement appropriate design considering the factors of the size of the pipes to be
used, the pipe’s location, plans for future expansion, calculation of the likelihood of
VANIDA NATASHA PRIMUS leakage, various pressure factors and how close these systems are to fire
• WATER RECULATION DESIGN department.
DEPARTMENT

LEE JIA RUI


• EROSION AND SEDIMENT CONTROL • Prevent the outflow of erosion and sedimentation during construction phase.
DEPARTMENT • Propose, modify and enhance the existing drainage system with consideration of
budget planning.
• Design the temporary drainage layout on site for implementation of proper flowing
NURUL NABILA BINTI MOHAMAD RAZALI of drainage at the construction site to avoid any problems to the project phase and
• EROSION AND SEDIMENT CONTROL workers.
DEPARTMENT

GANTT CHART
• Dedicated to the best quality, health, safety and
environment.
OUR VALUES:

• Strong relationship bond among employers and


employees with equal opportunities and fair
competition.
• Highly adapt to integrity, accountability, transparency
and sustainability
PROPOSED DEVELOPMENT OF MIXED HOUSING
ON PART OF LOT 3002, LOT 3003, LOT 3010, LOT
3011, LOT 166152, LOT 166154, LOT 166156 AND
LOT 166158, MUKIM PULAI, NUSAJAYA, JOHOR
DARUL TAKZIM

Almost 90% of
this area is
covered by the
oil palm
Highest RL :
47.453m

✓ The palm oil plantation will


all be cut down for the
development.
✓ Drainage will be designed
based on the gravity flow.
✓ The pond will be designed at
the second lowest level after
the fecal plant.
Lowest RL :
23.119m
✓ There will be areas of green
space in the development
area.
✓ The land will be varied in
platform level.

The land a flowing river ✓ The reduced level at the


which call Sungai Pulai that This land consist of a area for the water tank is
used to convey the runoff. few of lowland areas lower because the elevated
water tank will be
The land already has constructed.
existing road and drainage
systems.

BENEFICIAL EFFECTS ADVERSE EFFECTS


• Provide employment opportunities. The • Soil erosion. Site clearance by
new trade plots being developed can removing the oil palm trees cause the
create job opportunities to local roots cannot hold into the soil and the
resident. It can help in boosting the soil around the plantation will become
local economic growth for better living loose and detached. This can lead to
qualities. flash flood and destruct road quality.

• Urban green spaces such as parks, • Water pollution. Water will carry
playground or local residential greenery various pollutants from the residential
that will be developed in this project areas or the trade plots into the river.
can promote the mental and physical As a result, clogging of the river,
health, reduce the morbidity and contaminating the drinking water and
mortality of the residents by providing also threatening the aquatic life.
psychological relaxation, stimulating
social cohesion and stress alleviation.
• Noise pollution. Residential area is
• Highway accessibility. This is because near to the highway. The roadway
highway network helps the noise includes vehicle exhaust systems,
transportation schedules and deliveries engines, and by contact of tires with
for business purpose become more the road during travel. This will affect
Prepared By:
reliable and timely. 1. MUHAMMAD SYAFIEQ BIN ZAKARIA
the daily life of resident.
2. CHUA HUI FEN
3. NURFAZREEN BINTI MOHD FAZLLAH
4. NADIA FARISHA BINTI NAZLI
IQBAL HADI BIN MUHAMMAD ANWAR
HAMZAH RAHMAN HADI BIN ZAINOL

ESTIMATING
CIVIL SPIRIT SDN BHD©
LOCATION
PROPOSED DEVELOPMENT OF MIXED HOUSING ON PART OF LOT
3002, LOT 3003, LOT 3010, LOT 3011, LOT 166152, LOT 166154,
LOT 166156 AND LOT 166158, MUKIM PULAI, NUSAJAYA, JOHOR
DARUL TAKZIM.

OBJECTIVE
SCOPE OF WORK
The purpose of this method statement is to define the methodology
for execution of backfilling and compaction procedure related to 1. Site Clearing
earthworks. - Clearing, grubbing, demolishing,
breaking up and removing all trees,
shrubs, vegetation and other obstruction
MACHINES within the site that need to be removed
or disposed to the other specific site.
1. Excavator
- For cutting activity. 2. Stripping Topsoil
- 150mm of topsoil need to be removed
2.Motor Grader from the ground surface by using of
- Used to level the surface of suitable machinery and operators.
the compacted soil layer in fill
activity. 3. Cut Work
- Excavate the excess soil to prepare the
3. Dump Truck levels that needed from the construction
- Used to transport the cut and site.
fill volume of earthwork. - The excavated soil will be used in fill
activities again to reduce the obtain of
4. Bulldozer such materials from outside source.
- To push large quantities of
topsoil from site clearance. 4. Fill Work
- Stripping of top soil. - Transfer the soil into the region to
increase the level of soil as the proposed
5. Soil Compactor level.
- Used for the soil compaction - Materials such as medium stiff clay,
after fill activity. clayey sand and other approved soils that
used for fill activities are the mostly from
cut materials.

5. Slope Protection
- Slope remedial work subjected to the
suitability of site condition will be carried
out on existing failed slope.
PROJECT
PROPOSED DEVELOPMENT OF MIXED HOUSING ON PART OF LOT
3002, LOT 3003, LOT 3010, LOT 3011, LOT 166152, LOT 166154, LOT Prepared by:
166156 AND LOT 166158, MUKIM PULAI, NUSAJAYA, JOHOR. Lee Jia Rui
Nurul Nabila Binti Mohamad Razali

LOCATION HIGHEST AND LOWEST POINTS

Lowest point = 23.119m Highest point = 47.453m


To locate the sediment To locate water tank or
retention pond and sewerage reservoir for daily water
From overall From topographical treatment plant. supply demand.
development plan survey plan
SITE INVENTORY SITE ANALYSIS
1. The land in this area is 90% covered by forests and palm oil 1. Forest areas and palm oil plantation need to be cut down prior
plantation. to development progress.
2. The land has a lot of lowland areas. 2. Lowland area will vary in platform level.
3. The land has a flowing river which is Sungai Pulai that can be 3. Proposed road and drainage systems will be based on existing
used to convey runoff. level with suitable approaches.
4. The land has some existing road and drainage systems. 4. Drainage will be designed based on type of gravity flow.
5. Some of the land areas will be maintained to become green
CONCEPTUAL GRADING PLAN space and open space.
1
ENVIRONMENTAL SUSTAINABILITY ISSUES
2
1. Proper installation of silt fence
Phase 1
 Silt fence must be installed and constructed properly to
prevent failure due to heavy rain that would carry
1
outstand washed away mud and sediment outside the site
boundary.
Phase 2
3 2. Wash through design
 The design of wash through is crucial to minimize and
Phase 3 prevent soil and mud to be carried away with the lorry
SB Phase
5 5 that has been passing by.
2
3. Rainwater harvesting
SB Sediment Basin 2 Entrance 2 with Wash Through 2  To accumulate and store rainwater for reusing purpose in
1 Entrance 1 with Wash Through 1 wash through to reduce water demand for the site
3 Entrance 3 with Wash Through 3
1 Earth Road Hoarding 4. Safe work method implementation
2 Earth Drain
Hoarding
Green Space  Ensure adequate supply of personal protective equipment
Silt Trap with Fence
Detention Pond (PPE), clear signage indicating site access routes and
Silt Trap with Fence Discharge Outlet
Sewage Treatment Plant PL: 25m
emergency contact and safety kits to hinder injuries and
Discharge Outlet
Water Reservoir PL: 37m Earth Drain fatalities.

PROPOSED LEVEL

Phase 1 Phase 2 and 3 Phase 4 Phase 5


Water Reticulation
GROUP 2

OBJECTIVE

Design a water reticulation system that can supply enough Closed loop layout
treated water to consumer even during water breakdown with
the most ideal cost.

WATER DEMAND

• By analysing all the type of premises, water demand per unit


and number of unit in the area, the total water demand is
2,616,550 L/day with the average flow of 30.3 L/s.

ANALYSIS OF WATER
RETICULATION NETWORK
WATER TANK
Proposed level of
water tank • Designed according to Uniform
Technical Guidelines Water
• Designation of water
Reticulation & Plumbing published by
tank and suction tank SPAN.
will be done after the
analysis. • Analysis done using EPANet program
and also MATLAB based on the Hazen-
• Top water level and Williams formula.
bottom water level is
• Pipe network analysis using closed
crucial to ensure that loops to ensure when the pipelines is
enough pressure to on maintenance, water still can be
distribute water . TWL supplied.

• Shape of tank that will • Closed loop is done every 2 lots.


BWL
be used is cylindrical as
• Type of pipe will be used are HDPE
it has low gravity centre. and mild steel.

• Tank volume is 2616


m³ and the designed
tank dimension is with
the height of 6m and Prepared by :
diameter 25m. Muhammad Aiman Ponniran
Vanida Natasha Primus

CIVIL SPIRIT SDN BHD©