• Ensure that a project is completed within stipulated time and budget, that the
MUHAMMAD SYAFIEQ BIN ZAKARIA project's objectives are met, and that everyone performs well in respective tasks.
• PROJECT MANAGER • Ensure the desired result is achieved by monitoring work progress, the most
• EARTHWORK DEPARTMENT
efficient resources are used and the different interests involved are satisfied.
• Identify potential stakeholders and delivering the deliverables to the client.
• Conduct a site investigation and to safely investigate and analyze sites and
determine their present and future stability.
NURFAZREEN BINTI MOHD FAZLLAH
• Guard and maintain the earth's physical environment with appropriate
• EARTHWORK DEPARTMENT
methodology during the development of major public and private projects.
• Suggest proposed level and perform land grading and to reconfigure the topography
of site, and to stabilize slopes.
NADIA FARISHA BINTI NAZLI
• EARTHWORK DEPARTMENT
GANTT CHART
• Dedicated to the best quality, health, safety and
environment.
OUR VALUES:
Almost 90% of
this area is
covered by the
oil palm
Highest RL :
47.453m
• Urban green spaces such as parks, • Water pollution. Water will carry
playground or local residential greenery various pollutants from the residential
that will be developed in this project areas or the trade plots into the river.
can promote the mental and physical As a result, clogging of the river,
health, reduce the morbidity and contaminating the drinking water and
mortality of the residents by providing also threatening the aquatic life.
psychological relaxation, stimulating
social cohesion and stress alleviation.
• Noise pollution. Residential area is
• Highway accessibility. This is because near to the highway. The roadway
highway network helps the noise includes vehicle exhaust systems,
transportation schedules and deliveries engines, and by contact of tires with
for business purpose become more the road during travel. This will affect
Prepared By:
reliable and timely. 1. MUHAMMAD SYAFIEQ BIN ZAKARIA
the daily life of resident.
2. CHUA HUI FEN
3. NURFAZREEN BINTI MOHD FAZLLAH
4. NADIA FARISHA BINTI NAZLI
IQBAL HADI BIN MUHAMMAD ANWAR
HAMZAH RAHMAN HADI BIN ZAINOL
ESTIMATING
CIVIL SPIRIT SDN BHD©
LOCATION
PROPOSED DEVELOPMENT OF MIXED HOUSING ON PART OF LOT
3002, LOT 3003, LOT 3010, LOT 3011, LOT 166152, LOT 166154,
LOT 166156 AND LOT 166158, MUKIM PULAI, NUSAJAYA, JOHOR
DARUL TAKZIM.
OBJECTIVE
SCOPE OF WORK
The purpose of this method statement is to define the methodology
for execution of backfilling and compaction procedure related to 1. Site Clearing
earthworks. - Clearing, grubbing, demolishing,
breaking up and removing all trees,
shrubs, vegetation and other obstruction
MACHINES within the site that need to be removed
or disposed to the other specific site.
1. Excavator
- For cutting activity. 2. Stripping Topsoil
- 150mm of topsoil need to be removed
2.Motor Grader from the ground surface by using of
- Used to level the surface of suitable machinery and operators.
the compacted soil layer in fill
activity. 3. Cut Work
- Excavate the excess soil to prepare the
3. Dump Truck levels that needed from the construction
- Used to transport the cut and site.
fill volume of earthwork. - The excavated soil will be used in fill
activities again to reduce the obtain of
4. Bulldozer such materials from outside source.
- To push large quantities of
topsoil from site clearance. 4. Fill Work
- Stripping of top soil. - Transfer the soil into the region to
increase the level of soil as the proposed
5. Soil Compactor level.
- Used for the soil compaction - Materials such as medium stiff clay,
after fill activity. clayey sand and other approved soils that
used for fill activities are the mostly from
cut materials.
5. Slope Protection
- Slope remedial work subjected to the
suitability of site condition will be carried
out on existing failed slope.
PROJECT
PROPOSED DEVELOPMENT OF MIXED HOUSING ON PART OF LOT
3002, LOT 3003, LOT 3010, LOT 3011, LOT 166152, LOT 166154, LOT Prepared by:
166156 AND LOT 166158, MUKIM PULAI, NUSAJAYA, JOHOR. Lee Jia Rui
Nurul Nabila Binti Mohamad Razali
PROPOSED LEVEL
OBJECTIVE
Design a water reticulation system that can supply enough Closed loop layout
treated water to consumer even during water breakdown with
the most ideal cost.
WATER DEMAND
ANALYSIS OF WATER
RETICULATION NETWORK
WATER TANK
Proposed level of
water tank • Designed according to Uniform
Technical Guidelines Water
• Designation of water
Reticulation & Plumbing published by
tank and suction tank SPAN.
will be done after the
analysis. • Analysis done using EPANet program
and also MATLAB based on the Hazen-
• Top water level and Williams formula.
bottom water level is
• Pipe network analysis using closed
crucial to ensure that loops to ensure when the pipelines is
enough pressure to on maintenance, water still can be
distribute water . TWL supplied.