PROPOSED ROUTE
20212
20212_RV_WU1348_Eldoret_Mtungi_Road

SAFARICOM LIMITED OPTIMAX GROUP LTD


PROJECT NAME : DRAWING NAME :
APPROVED BY CHECKED BY
Safaricom FTTS Project COVER

DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION


Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road
300 300 Concrete Envelop
Date

100

50
Warning Tape Warning Tape
Name

300
600
Extracted Materials
Subject

1200

600
2*32mm HDPE 2*32mm HDPE
Co-signature

OFC OFC

200 200
TRENCH DETAILS FOR MICRO/HARD SOIL TRENCH DETAILS FOR HARD ROCK

Road Surface
Road Surface
Operation pit Operation pit

Soil

1500

1500
ɸ110mm HDPE pipe FOC FOC
ɸ32mm HDPE pipe ɸ32mm HDPE pipe
ɸ110mm HDPE pipe
Road Crossing by MICROtunneling

SAFARICOM LIMITED OPTIMAX GROUP LTD


PROJECT NAME : DRAWING NAME :
APPROVED BY CHECKED BY
Safaricom FTTS Project Technical

DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION


Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road
Date

Groove
New duct OFC A A Drawing connect
Name

Electric line
Ω10 Cable reservation in man hole
New Duct
Railway
xxx
Label for special case
Existing Duct
Subject

Drainage
Tree

E Existing manhole
Co-signature

mountain or hill
Dry land

Manhole (inner size: 800mm[W] x 800mm[L] x 1000mm[D])


Road and street
NBI 00001 Hurst

OFC joint Grass Under construction road

MIDSPAN LOOP (10meters length for maintenance) INSIDE MANHOLE Building Pond or lake
NBI 00001

N
Concrete bridge
SPLICE LOOP (15meters each side of OFC) INSIDE MANHOLE Compass
NBI 00001
metalic bridge
Power cable
S:1.274658° GPS
Internet cable (CAT5)
E:36.972258°
In-building optical fiber cable (GJYXTZY-12B6a2) Culvert H:1558

In-building optical fiber cable (GJXFDH-4B6a2) Fence

In-building optical fiber cable (GJPFJH) River

Oil site
Existing equipment

New equipment
Tower

SAFARICOM LIMITED OPTIMAX GROUP LTD


PROJECT NAME : DRAWING NAME :
APPROVED BY CHECKED BY
Safaricom FTTS Project Legends

DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION


Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road
Date

Reside
Buildinntial
g
Name

g
Buildin
Subject

Eldore
t Mtun
gi Site
S:0.5
41181
E:35.3 °
10201
S:-1.265576° °

g
Co-signature

Buildin
E:36.666083° 0K+301
10m
NS

PMH-002
10m loop
0K+291
New Joint Box

Shops
Field
PMH-001
Eldore

g
10m loop

Buildin
S:0.540978°
0K+281 t-Cheb
E:35.310138° arus R
Road Crossing by
Micro-Turneling(10m) d
0K+284-0K+294
Ø110mm HDPE pipe 12m Cable
Pullin
g
281m Shops
gs
Buildin

E MH ELD 00553
20m loop Reside
Buildinntial
0K+000 g
New Joint Box

Shops
S:0.540196°
E:35.312379°

UNIT: m
Main Workload
Route Route Break and recover road surface OSP1 Soil Profile OSP2 Soil Profile 48P Joint Warning Manhole
survey clean ASP. CON. BRC. GRA. NS. HS. SR HR (pcs) Trunking 48P ODF
NS. HS. SR HR Box(pcs) tape

301 0 0 0 0 0 10 0 0 0 0 0 0 0 2 10 2 0 1
SAFARICOM LIMITED OPTIMAX GROUP LTD
PROJECT NAME : DRAWING NAME :
APPROVED BY CHECKED BY
HDPEΦ110 4 way Micro duct 2*32mm Duct Total BOSAL Works Dwg chainage 0K+000 to 0K+375
Concrete 1 way Breaking Open window Safaricom FTTS Project
Micro envelop Micro duct Existing Trenching Existing Trenching wall(pcs) Pulling in manhole(pcs) Above Under
Tunneling Bridge Trenching duct duct 5m 5m
DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION
12 0 0 0 0 0 0 281 40 0 301 0 0 0 Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road
Date

20212_RV_WU1348_Eldoret_Mtungi_Road
Name
Subject

0.7
Co-signature

GEN. SHED

Tower

cab METER

E
le t
ray PDB
BTS SLAB
ATS PMH-002
APM DELTA DELTA 10m loop
30 RACK RACK
3m 0K+291
New Joint Box

SERV. RACK1 Breaking and


( ODF Space) reinstatement
concrete wall

DRAWING NAME :
APPROVED BY CHECKED BY
Safaricom FTTS Project ISP

DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION


Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road
Date
Name
Subject
Co-signature

MH ELD 00553
15122_RV_WU1103_ELDORET_
14873_RV_WU1026_
ELDORET_HAWAII
F23 F23 CHEPKAN

F24 F24

Existing Cable Existing Cable

F1 F2 F7 F8 New 48C Normal Cable to


preconnectorized ODF

20212_RV_WU1348_
Eldoret_Mtungi_Road

Lengend: New Splicing point SAFARICOM LIMITED OPTIMAX GROUP LTD


PROJECT NAME : DRAWING NAME :
Existing Splicing point APPROVED BY CHECKED BY

New termination
Safaricom FTTS Project Fiber Distribution
Existing termination
DATE DATE DESIGN MANAGER: Drawing BY: DATE: SCALE: VERSION
Spare fiber
Dead fiber Joakim K Koilege S. 22/09/2021 N/A V.1
Drawing No: 20212_RV_WU1348_Eldoret_Mtungi_Road

You might also like