AW139 00 Chapter 64
AW139 00 Chapter 64
AW139 00 Chapter 64
CHAPTER
64
TAIL ROTOR
• A splined hub connecting the TGB shaft to the four blades (Fig 9). The hub consists of four arms and secured in place by
locknut and bolts. An upper and a lower limiter are used to limit the flapping movements between - 10° and + 12°.
• Four elastomeric bearings connect between the blades and the hub and permit lead/lag, flap, pitch change and movement of
the blades. In the centre of the elastomeric bearing a titanium bolt is inserted that adds to the stiffness of the hub.
• Four elastomeric dampers are installed between the blades and the hub and dampen the lead-lag movements of the blades.
The limiting stops limit the flap movement of the blades to the maximum lateral flap position of the blades
• A cover, made by aluminium alloy, is installed on the top of the rotating controls
Four rotor blades react to centrifugal, bending and torsion loads. The blades are made of composite material (unidirectional
fibreglass tapes, wrapped in cross ply fibreglass layers). A thin nickel shield, bonded onto the outer surface of the leading edge,
gives protection against erosion.
An upper and lower fibreglass skins are bonded at the rear of the leading edge spar and extended back to join together and form
the trailing edge. The root section is formed in the spar by fibreglass strips that are wound so as to allow the attachment of the
elastomeric bearing.
The blade tip includes a pocket where weights are positioned to statically balance the blade; the same occurs in the root section.
A lightning conductor jumper is attached to the top of each blade attachment.
The TR interfaces with the flight control system via the rotating controls. The rotating controls receive inputs from the TR actuator
and converts them to give the required blade pitch-angle changes.
The TR controls include:
• A spider installed over a sliding tube. The sliding tube is installed on the TGB mast and supplies the attachments for one end
of the rotating scissors.
• The rotating scissors supply a rotary drive force from the hub to the spider. At the same time the rotating scissors turn to
allow lateral pitch-change movement.
• Four pitch links, one for each blade, connect the TR blades to the spider.
• The materials that follow are dangerous. Make sure that you know all the safety precautions and first aid instructions for
these materials:
• Primer
• Corrosion inhibitor
• Solvent
• Liquid nitrogen
• Be careful when you use the compressed air. Dust and particles can cause injury to your eyes. Always use applicable
protective goggles.
• Be careful when you use the liquid nitrogen. Cold parts can cause injury to the persons. Always use applicable protective
clothing.
• Special tools associated with the TR head are detailed in the MM.
• Each blade bolt and its related parts must be identified as a set with a permanent marking pen and their location recorded.
• Pushing or pulling the tail rotor blades is not allowed because it’s easy to cause damage. Main rotor is to be turned to set the
tail rotor to the necessary position.
• The tail rotor blade to be installed/removed must be in the horizontal position.
• The blade is installed inside the hub arms using a tool.
• The blade bolt is removed using a puller tool and installed with an installation pin tool.
• The blade bolt must be handled with a cheesecloth otherwise the external layer of solid lubricant film can be damaged.
• If the solid film lubricant layer on the blade bolt is damaged on specific areas, the layer must be repaired or replaced.
• A new hub flap stop shim thickness has to be calculated when replacing the:
• Elastomeric bearing
• Hub flap stop
• Hub
• Blade
• When installing a damper the eye-end with the yellow reference paint must be installed on the damper attachment on the
blade (with the same colour).
• A new bearing shim thickness has to be calculated in case of replacement of the elastomeric bearing or the tail rotor blade.
• When calculating a new bearing shim thickness make sure that the elastomeric bearing installation bolts do not touch the
end of the thread. If necessary, spacer washers must be used.
• The blade damper attachment bushes are removed using a tool.
• A blade dynamic check must be carried out after replacement of a tail rotor blade.
• Be careful when you turn the rotors. Make sure that the rotors are clear. An injury to persons and/or damage to the
equipment can occur.
• Be careful when you remove/install the tail rotor blade. The tail rotor blade is heavy. An incorrect movement can cause an
injury to persons and/or damage to the equipment.
• In this procedure, get a second person to help you to put the tail rotor blade in position on the hub arm.
• The materials that follow are dangerous. Make sure that you know all the safety precautions and first aid instructions for
these materials:
• Primer.
• Corrosion inhibitor.
• Solvent.
• Sealing compound.
• Special tools associated with the TR blades are detailed in the MM.
DESCRIPTION
HUB (Fig 2)
The hub connects to the TGB mast and provides connections for the four rotor blades, via elastomeric bearings and elastomeric
blade dampers. Limiting stops for blade flap are also included in the assembly.
The hub is a one-piece, forged, titanium unit, machined to its final form. Its basic form is a central tube with four arms. The arms are
aligned as pairs to form a clevis, through which an attachment bolt will hold the elastomeric bearing and the blade.
At the ends of the arms a lug is formed in the same plane as the arm but extends at almost a right angle.
These lugs provide the attachment of a bracket that allows the connection of one end of the elastomeric damper.
On the outer side of the hub, two lugs are formed to provide the attachment points for scissors link that provides drive and
articulation with the pitch change mechanism movement. The centre of the hub is splined, to couple with splines on the TGB mast.
The hub engages with the mast and is supported on the mast by conical rings.
Two bottom half conical rings are installed within the inner side of the hub and locate on a shoulder inside the hub.
When the hub is fitted on the TGB mast, the inner conical face of the half rings locates on a ramp section of the mast.
A top conical ring is then fitted on the mast, and the conical, outer, circumference of this ring matches with a conical section at the
outer side of the hub.
The top conical ring, the bottom half conical rings and the hub splines are covered with a solid lubricant film.
The hub is then retained by a pressure washer and ring-nut combination.
The ring nut screws down but does not directly load the top conical ring. The load on the conical ring is applied by eight bolts that
screw through the ring nut and apply a force on the pressure washer, to load it on to the conical ring.
The bolts are tightened in a special sequential order to ensure an even circumferential loading. To prevent rotation of the ring nut, a
locking flange is part of the assembly.
The locking flange has two keys formed on its inner circumference. These keys locate in keyways cut into the mast and slider
bushing thus preventing the ring from rotating.
The locking flange is assembled on top of the ring nut, and when the eight bolts are fitted, they pass through the locking flange, thus
effectively securing the locking flange to the ring nut.
Elastomeric dampers fit between the blades and hub to dampen lead and lag movements of the blades.
The damper is fitted between the bracket on the hub and the attachment bracket on the blade root. Both ends are connected by a
bolt that passes through a spherical bearing.
The damper comprises a central shaft assembly within a tubular body. Damping is provided by two elastomeric elements, that are
bonded between the central shaft and an outer sleeve. The sleeve is fitted inside the body and held by a barrel nut.
Damping movements can take place between the body and shaft, with the elastomeric elements absorbing and regulating the load
transfer rates.
Stops within the dampers provide limits to the travel as needed.
• The top conical ring and the bottom half control rings must be handled with a cheesecloth otherwise the external layer of
solid lubricant film can be damaged.
• If the solid lubricant film layer on the top conical ring bottom half conical rings and hub splines is damaged on specific areas,
the layer must be repaired or replaced.
• Identify the tail rotor head installation bolts by writing its number (1 thru 8) on the head using a permanent marking pen.
• Tail rotor installation bolts are tightened by subsequent torque increments in sequence, waiting 5 minutes between every
torque increment and then checking the torque value. This operation is done twice.
• Tail rotor head removal/installation must be carried out carefully to avoid damaging the hub and the mast splines.
• Dynamic balance must be carried out after rotor head installation.
• When installing a damper, the eye-end with the yellow reference paint must be installed on the damper attachment on the
blade with the same colour.
• The damper elastomeric element is checked for radial and circumferential cracks as well as delamination/ separation and
damage (Fig 20)
• When replacing a damper you must adjust the length using a template.
• The top conical ring is removed using a tool.
• The rotor head is removed using a tool and a sling.
• The rotor head is installed using a sling.
LEADING PARTICULARS
• Tail rotor head weight (hub and dampers)............. 10.1 Kg (22.3 lb)
SAFETY PRECAUTIONS
• Be careful when you turn the rotors. Make sure that the rotors are clear. An injury to persons and/or damage to the
equipment can occur.
• Be careful when you remove/install the tail rotor group. The tail rotor group is heavy. An incorrect movement can cause an
injury to persons and/or damage to the equipment.
• The materials that follow are dangerous. Make sure that you know all the safety precautions and first aid instructions for
these materials:
• Primer
• Corrosion inhibitor
• Solvent.
• As per I.L. AW139-08-006, (task CM64-01, belonging to the Certification Maintenance Requirements CMR in Chapter 4 of
the AMPI). Has to be satisfied by recording the exact values of the Tail Rotor Damper bearing play and by following
thoroughly the instructions contained in AMP Data Module 39-A-64-21-00-00A-286A-A, Tail rotor head installation - Lag
damper spherical bearings-Detailed inspection, therefore avoiding qualitative methods.
It is thus recommended to use local means (electronic/paper tables) to keep track of the values measured during the
inspection, information that remains available to the operators for historical record keeping purposes.
The purpose of the inspection is, indeed, to guarantee that the bearing is in the condition to work properly in its seat, in order
to ensure the correct load path on the damper rod end. The design tolerances and the admitted values on allowable play of
the Tail Rotor Damper rod end bearing have been established in order to ensure this correct functioning.
PITCH LINKS
The pitch links are control rods that connect from the arms of the spider to each tail rotor blade pitch change arm.
The links comprise a tie rod with adjustable rod ends and spherical bearings.
MAINTENANCE INFORMATION
• The bolts securing the pitch link must be installed with the head facing the direction of rotation.
• When removing the pitch link, keep the bolt and its related parts as a set.
• In case of a pitch link replacement, the new length must be adjusted to the value of the pitch link replaced using a template.
• When installing the rotating scissors, each fork with the yellow reference paint must be installed on the slider and on the hub
attachments with the same colour.
• The position of the bolts attaching the rotating scissor must be recorded before removal.
• A new shim thickness has to be calculated when replacing the rotating scissors. The clearance between the half scissor
flanges must be measured with the scissors installed (without shim), torqued and in the position where the maximum play
exists.
• A new shim thickness has to be calculated when replacing the cover. The thickness of the shim must be lower than the
clearance measured between the cover and the spider.
• In case of replacing either the spider and slider assembly or the duplex bearing, a check must be carried out after the
installation on the rotor head; the difference between the dimension X (measured between spider plane and slider plane) and
dimension Y (measure of the duplex bearing) must be equal to dimension Z (measured between the spider plane and the
duplex bearing) after torque loading the securing nut on the tail rotor servo actuator pitch control rod.
• The duplex bearing must be refrigerated at -40 °C for 1.5 hours before its installation on the spider and slider assembly.
• After cleaning the duplex bearing, it must be dried without letting it turn in order to avoid damage.
• The duplex bearing is removed using a tool.
LEADING PARTICULARS
The materials that follow are dangerous. Make sure that you know all the safety precautions and first aid instructions for these
materials:
• Primer
• Corrosion inhibitor
• Solvent
• Liquid nitrogen
• Be careful when you use the compressed air. Dust and particles can cause injury to your eyes. Always use applicable
protective goggles.
• Be careful when you use the liquid nitrogen. Cold parts can cause injury to the persons. Always use applicable protective
clothing.