Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

2nd Harmonic Rest. Test

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

METHOD:1
CONVENTIONAL TEST METHOD FOR 2ND HARMONIC TEST BY USING TWO
CURRENT SOURCES:

FREQ. OF SOURCE “I1” = 50Hz FREQ. OF SOURCE “I2” = 100Hz

11

DTH-31/32

12

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

SELECT “LRAMPI” MACRO IN “PROTEST” FOR 2ND HARMONIC TEST

50Hz FOR SOURCE


“I1”
100Hz FOR SOURCE “I2”

AUXILIARY
DC VOLTAGE

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, CLICK O “ACTION” TAB:

REDUCE 2ND HARMONIC


COMPONENT UNTIL THE
RELAY WILL OPERATE

CONTACTS
CONFIGURATION SHOWS
OÆC CONTACT MEANS
“NO/NC”.

NOTE:
OFFSET CURRENT VALUE MUST BE GREATER THAN SET VALUE
OTHERWISE CHANGE CONTACTS CONFIGURATION FROM “NO/NC or NC/NO”.

THENAFTER CLICK ON “RUN” BUTTON FOR TEST.

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

METHOD:2
TESTING OF 2ND HARMONIC FEATURE BY USING SINGLE SOURCE

11

DTH-31/32

12

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

METHOD TO BE TEST FOR 2ND HARMONIC FEATURE BY USING SINGLE


SOURCE AS BELOW;

MARK “RIGHT CLICK” ON HARMONIC BOX

PUT AMPLITUDE VALUE IN SOURCE “I1”

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

SELECT 2ND HARMONIC OPTION

PUT “30%” SECOND HARMONIC

THENAFTER PRESS “OK” BUTTON.

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

CLICK ON “OSCILLOGRAM”

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, SEE THE “WAVEFORM”

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

EXPORT “COMTRADE” FILE AT DESIRED LOCATION:

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, OPEN PROTEST SOFTWARE & SELECT “TRANS” MACRO FOR TEST.

SELECT “TRANS” MACRO

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW,

IMPORT SAVED .CFG FILE FROM FOLDER

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

IMPORTED FILE FOR TEST:

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, CLICK ON “ACTION” TAB

PUT SOURCE “I1” IN “SRC’


COLUMN.

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, CLICK ON “RESULT” TAB:

SELECT SOURCE “I1”

DOBLE ENGINEERING PVT LTD


Knowledge Is Power SM

Apparatus Maintenance and Power


Management For Energy Delivery

NOW, PUT RELAY OPERATING TIME & CLICK ON “RUN” COMMAND

CLICK “RUN” BUTTON

DOBLE ENGINEERING PVT LTD

You might also like