Input Data
Height Between The Top of The
Minimum Time Height Between The Minimum Height of Water
Submersible Pump Slab & The Bottom of Lowest Sump Pit Sump Pit
Between Two Bottom of Lowest Drainage Required to Submerge The
Discharge Drainage Pipe Drained to The Length Width
Successive Starts Pipe & The switch on Level Pump Discharge Pipe
Sump Pit
Output Data
Minimum Storage Volume
Storage Height
for The Sump Pit
2m
2.22 m3 0.87 m Lowest drainage Pipe Bottom Level
Results 0.3m
3.42m
Switch On Level
Sump Pit Height
(The Height Between The Top of The Slab & 0.87m
1.7m X 1.5m