Inspection & Testing Requirements Scope:: Test and Inspection Per
Inspection & Testing Requirements Scope:: Test and Inspection Per
Inspection & Testing Requirements Scope:: Test and Inspection Per
0020 *** In process inspection & test requirement Specification Details / Notes:
0030
0010
*** X
Final inspection & test requirements
Burn-in Type Test Certificate
Specification Details / Notes:
Provide minimum of 8 hours of continuous operation at full
rated capacity burn-in type test certificate
Notes:
(1) May only be waived by the responsible Saudi Aramco, ASC, or AOC Inspection Offices.
(2) See form SA175 - 000003 for instructions on using this form.
End of IR172600