Sabp Z 002
Sabp Z 002
Sabp Z 002
1 Introduction...................................................... 2
1.1 Purpose................................................... 2
1.2 Scope...................................................... 2
1.4 Disclaimer................................................ 2
2 References...................................................... 2
3 General............................................................ 3
Appendices.............................................................. 5
1 Introduction
1.1 Purpose
1.2 Scope
1.4 Disclaimer
The use of this Best Practice does not relieve the engineer from his
responsibility or duty to confirm and verify the accuracy of any information
presented herein. The use of this information or material does not guarantee
results that will satisfy any applicable requirements of Saudi Aramco Standards.
P&CSD assumes no responsibility or liability whatsoever for the misuse of the
information in this document. This Best practice is intended as guidelines and
shall not be considered as replacement for the Mandatory Saudi Aramco
Engineering Requirements. Saudi Aramco® is a registered trademark of the
Saudi Arabian Oil Company. Copyright, Saudi Aramco, 2012.
In the event of a conflict between this Best Practice and other Mandatory Saudi
Aramco Engineering Requirement, the Mandatory Saudi Aramco Engineering
Requirement shall govern.
Page 2 of 5
Document Responsibility: Process Control Standards Committee SABP-Z-002
Issue Date: 24 November 2012
Next Planned Update: TBD Functional Specifications for Process Control Systems
2 References
The latest edition of the following applicable codes, standards, specifications, and
references in effect on the date of contract offer shall be used, except as otherwise
specified. Short titles will be used herein when appropriate.
3 General
Page 3 of 5
Document Responsibility: Process Control Standards Committee SABP-Z-002
Issue Date: 24 November 2012
Next Planned Update: TBD Functional Specifications for Process Control Systems
attached appendices. The main responsibility of the project team is to develop the
actual Scope of Work for the project.
The appendices of this document should be used as a ‘Go-By’ for developing the
project specific scope of work. This document along with the relevant generic
functional specifications document and Saudi Aramco standards shall serve as the basis
for procurement of the PCS.
Revision Summary
17 November 2007 New Saudi Aramco Best Practice.
11 January 2009 Editorial revision, revised list of appendices to include new FSD for Leak Detection
Systems.
24 October 2009 Editorial revision, revised list of appendices to include new FSD for Terminal Management
Systems.
9 March 2010 Editorial revision to add 4 new FSD documents.
24 November 2012 Editorial revision to correct definition of OTS as Operator Training Simulator.
Page 4 of 5
Document Responsibility: Process Control Standards Committee SABP-Z-002
Issue Date: 24 November 2012
Next Planned Update: TBD Functional Specifications for Process Control Systems
APPENDICES
Appendix SABP-Z-002A: Project Specification for PCS Scope of Work